Cause List
| S.No. | Case No. | Subject | Case Type | Name of Appellant | Respondent | Next Date | Details | Order / Decision | Edit |
|---|---|---|---|---|---|---|---|---|---|
| 35801 | 115/2021 | 14B | EPF Appeal | Srivastava Polytechnic College | APFC, Madurai-I |
08/08/2024 18/11/2024 24/02/2025 19/05/2025 08/08/2025 17/10/2025 23/01/2026 24/04/2026 |
None appeared on behalf of the Appellant. M/s. R. Meenakshi, the learned Counsel on behalf of the Respondent filed the Counter Statement. List to 24.04.2026 for filing the Rejoinder. | ||
| 35802 | 115/2021 | 14B | EPF Appeal | Srivastava Polytechnic College | APFC, Madurai-I |
08/08/2024 18/11/2024 24/02/2025 19/05/2025 08/08/2025 17/10/2025 23/01/2026 24/04/2026 |
None appeared on behalf of the Appellant. M/s. R. Meenakshi, the learned Counsel on behalf of the Respondent filed the Counter Statement. List to 24.04.2026 for filing the Rejoinder. | ||
| 35803 | 114/2021 | 14B | EPF Appeal | Chinnakannanur PAC Bank Ltd., | APFC, Madurai |
23/09/2024 23/12/2024 24/03/2025 23/06/2025 17/07/2025 15/09/2025 17/12/2025 25/03/2026 |
Final Order - 35% of the assessed amount passed by the Respondent order dated 26.10.2021 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 35804 | 114/2021 | 14B | EPF Appeal | Chinnakannanur PAC Bank Ltd., | APFC, Madurai |
23/09/2024 23/12/2024 24/03/2025 23/06/2025 17/07/2025 15/09/2025 17/12/2025 25/03/2026 |
Final Order - 35% of the assessed amount passed by the Respondent order dated 26.10.2021 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 35805 | 114/2021 | 14B | EPF Appeal | Chinnakannanur PAC Bank Ltd., | APFC, Madurai |
23/09/2024 23/12/2024 24/03/2025 23/06/2025 17/07/2025 15/09/2025 17/12/2025 25/03/2026 |
Final Order - 35% of the assessed amount passed by the Respondent order dated 26.10.2021 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 35806 | 114/2021 | 14B | EPF Appeal | Chinnakannanur PAC Bank Ltd., | APFC, Madurai |
23/09/2024 23/12/2024 24/03/2025 23/06/2025 17/07/2025 15/09/2025 17/12/2025 25/03/2026 |
Final Order - 35% of the assessed amount passed by the Respondent order dated 26.10.2021 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 35807 | 114/2021 | 14B | EPF Appeal | Chinnakannanur PAC Bank Ltd., | APFC, Madurai |
23/09/2024 23/12/2024 24/03/2025 23/06/2025 17/07/2025 15/09/2025 17/12/2025 25/03/2026 |
Final Order - 35% of the assessed amount passed by the Respondent order dated 26.10.2021 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 35808 | 114/2021 | 14B | EPF Appeal | Chinnakannanur PAC Bank Ltd., | APFC, Madurai |
23/09/2024 23/12/2024 24/03/2025 23/06/2025 17/07/2025 15/09/2025 17/12/2025 25/03/2026 |
Final Order - 35% of the assessed amount passed by the Respondent order dated 26.10.2021 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 35809 | 114/2021 | 14B | EPF Appeal | Chinnakannanur PAC Bank Ltd., | APFC, Madurai |
23/09/2024 23/12/2024 24/03/2025 23/06/2025 17/07/2025 15/09/2025 17/12/2025 25/03/2026 |
Final Order - 35% of the assessed amount passed by the Respondent order dated 26.10.2021 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 35810 | 114/2021 | 14B | EPF Appeal | Chinnakannanur PAC Bank Ltd., | APFC, Madurai |
23/09/2024 23/12/2024 24/03/2025 23/06/2025 17/07/2025 15/09/2025 17/12/2025 25/03/2026 |
Final Order - 35% of the assessed amount passed by the Respondent order dated 26.10.2021 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 35811 | 113/2021 | 14B | EPF Appeal | AAA College of Engineering & Technology | APFC, Madurai |
18/11/2024 24/02/2025 19/05/2025 08/08/2025 21/10/2025 21/01/2026 22/04/2026 |
The Counsel on behalf of the Appellant prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 22.04.2026 for hearing on Arguments/filing of written submission. | ||
| 35812 | 113/2021 | 14B | EPF Appeal | AAA College of Engineering & Technology | APFC, Madurai |
18/11/2024 24/02/2025 19/05/2025 08/08/2025 21/10/2025 21/01/2026 22/04/2026 |
The Counsel on behalf of the Appellant prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 22.04.2026 for hearing on Arguments/filing of written submission. | ||
| 35813 | 113/2021 | 14B | EPF Appeal | AAA College of Engineering & Technology | APFC, Madurai |
18/11/2024 24/02/2025 19/05/2025 08/08/2025 21/10/2025 21/01/2026 22/04/2026 |
The Counsel on behalf of the Appellant prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 22.04.2026 for hearing on Arguments/filing of written submission. | ||
| 35814 | 113/2021 | 14B | EPF Appeal | AAA College of Engineering & Technology | APFC, Madurai |
18/11/2024 24/02/2025 19/05/2025 08/08/2025 21/10/2025 21/01/2026 22/04/2026 |
The Counsel on behalf of the Appellant prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 22.04.2026 for hearing on Arguments/filing of written submission. | ||
| 35815 | 113/2021 | 14B | EPF Appeal | AAA College of Engineering & Technology | APFC, Madurai |
18/11/2024 24/02/2025 19/05/2025 08/08/2025 21/10/2025 21/01/2026 22/04/2026 |
The Counsel on behalf of the Appellant prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 22.04.2026 for hearing on Arguments/filing of written submission. | ||
| 35816 | 113/2021 | 14B | EPF Appeal | AAA College of Engineering & Technology | APFC, Madurai |
18/11/2024 24/02/2025 19/05/2025 08/08/2025 21/10/2025 21/01/2026 22/04/2026 |
The Counsel on behalf of the Appellant prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 22.04.2026 for hearing on Arguments/filing of written submission. | ||
| 35817 | 113/2021 | 14B | EPF Appeal | AAA College of Engineering & Technology | APFC, Madurai |
18/11/2024 24/02/2025 19/05/2025 08/08/2025 21/10/2025 21/01/2026 22/04/2026 |
The Counsel on behalf of the Appellant prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 22.04.2026 for hearing on Arguments/filing of written submission. | ||
| 35818 | 118/2021 | 14B | EPF Appeal | Dr. Navalar Nedunchezian College of Eingineering | APFC, Trichy |
06/03/2025 18/04/2025 28/05/2025 15/07/2025 12/09/2025 12/12/2025 20/03/2026 |
Final Order - 35% of the assessed amount passed by the Respondent order dated 17.05.2021 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 35819 | 118/2021 | 14B | EPF Appeal | Dr. Navalar Nedunchezian College of Eingineering | APFC, Trichy |
06/03/2025 18/04/2025 28/05/2025 15/07/2025 12/09/2025 12/12/2025 20/03/2026 |
Final Order - 35% of the assessed amount passed by the Respondent order dated 17.05.2021 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 35820 | 118/2021 | 14B | EPF Appeal | Dr. Navalar Nedunchezian College of Eingineering | APFC, Trichy |
06/03/2025 18/04/2025 28/05/2025 15/07/2025 12/09/2025 12/12/2025 20/03/2026 |
Final Order - 35% of the assessed amount passed by the Respondent order dated 17.05.2021 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 35821 | 118/2021 | 14B | EPF Appeal | Dr. Navalar Nedunchezian College of Eingineering | APFC, Trichy |
06/03/2025 18/04/2025 28/05/2025 15/07/2025 12/09/2025 12/12/2025 20/03/2026 |
Final Order - 35% of the assessed amount passed by the Respondent order dated 17.05.2021 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 35822 | 118/2021 | 14B | EPF Appeal | Dr. Navalar Nedunchezian College of Eingineering | APFC, Trichy |
06/03/2025 18/04/2025 28/05/2025 15/07/2025 12/09/2025 12/12/2025 20/03/2026 |
Final Order - 35% of the assessed amount passed by the Respondent order dated 17.05.2021 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 35823 | 118/2021 | 14B | EPF Appeal | Dr. Navalar Nedunchezian College of Eingineering | APFC, Trichy |
06/03/2025 18/04/2025 28/05/2025 15/07/2025 12/09/2025 12/12/2025 20/03/2026 |
Final Order - 35% of the assessed amount passed by the Respondent order dated 17.05.2021 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 35824 | 118/2021 | 14B | EPF Appeal | Dr. Navalar Nedunchezian College of Eingineering | APFC, Trichy |
06/03/2025 18/04/2025 28/05/2025 15/07/2025 12/09/2025 12/12/2025 20/03/2026 |
Final Order - 35% of the assessed amount passed by the Respondent order dated 17.05.2021 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 35825 | 117/2021 | 14B | EPF Appeal | Thangavelu TextilesMills Pvt. Ltd., | RPFC-II, Salem |
06/03/2025 18/04/2025 28/05/2025 15/07/2025 12/09/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of the damages amount . | ||
| 35826 | 117/2021 | 14B | EPF Appeal | Thangavelu TextilesMills Pvt. Ltd., | RPFC-II, Salem |
06/03/2025 18/04/2025 28/05/2025 15/07/2025 12/09/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of the damages amount . | ||
| 35827 | 117/2021 | 14B | EPF Appeal | Thangavelu TextilesMills Pvt. Ltd., | RPFC-II, Salem |
06/03/2025 18/04/2025 28/05/2025 15/07/2025 12/09/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of the damages amount . | ||
| 35828 | 117/2021 | 14B | EPF Appeal | Thangavelu TextilesMills Pvt. Ltd., | RPFC-II, Salem |
06/03/2025 18/04/2025 28/05/2025 15/07/2025 12/09/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of the damages amount . | ||
| 35829 | 117/2021 | 14B | EPF Appeal | Thangavelu TextilesMills Pvt. Ltd., | RPFC-II, Salem |
06/03/2025 18/04/2025 28/05/2025 15/07/2025 12/09/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of the damages amount . | ||
| 35830 | 117/2021 | 14B | EPF Appeal | Thangavelu TextilesMills Pvt. Ltd., | RPFC-II, Salem |
06/03/2025 18/04/2025 28/05/2025 15/07/2025 12/09/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of the damages amount . | ||
| 35831 | Cause List -13 December 2021 Before Smt. Pranita Mohanty, Presiding Officer-CGIT 1 & 2 Delhi ( EPF & ID matter) Virtual as well as Physical Hearing 11:30 A.M. onwards for ID Matters & 02:00 P.M. onwards for EPF Matters | EPF Appeal, ID | 13/12/2021 | Download | |||||
| 35832 | Cause List -13 December 2021 Before Smt. Pranita Mohanty, Presiding Officer-CGIT 1 & 2 Delhi ( EPF & ID matter) Virtual as well as Physical Hearing 11:30 A.M. onwards for ID Matters & 02:00 P.M. onwards for EPF Matters | EPF Appeal, ID | 13/12/2021 | Download | |||||
| 35833 | CGIT/NGP/21/21-22 | Cgit Nagpur | ID | Shri Waman N. Nagpure | Western Coalfield Limited |
21/06/2024 05/09/2024 13/11/2024 07/04/2025 08/08/2025 10/10/2025 13/01/2026 24/03/2026 16/06/2026 |
EX- PARTE EVIDENCE (P) | ||
| 35834 | CGIT/NGP/21/21-22 | Cgit Nagpur | ID | Shri Waman N. Nagpure | Western Coalfield Limited |
21/06/2024 05/09/2024 13/11/2024 07/04/2025 08/08/2025 10/10/2025 13/01/2026 24/03/2026 16/06/2026 |
EX- PARTE EVIDENCE (P) | ||
| 35835 | CGIT/NGP/21/21-22 | Cgit Nagpur | ID | Shri Waman N. Nagpure | Western Coalfield Limited |
21/06/2024 05/09/2024 13/11/2024 07/04/2025 08/08/2025 10/10/2025 13/01/2026 24/03/2026 16/06/2026 |
EX- PARTE EVIDENCE (P) | ||
| 35836 | CGIT/NGP/21/21-22 | Cgit Nagpur | ID | Shri Waman N. Nagpure | Western Coalfield Limited |
21/06/2024 05/09/2024 13/11/2024 07/04/2025 08/08/2025 10/10/2025 13/01/2026 24/03/2026 16/06/2026 |
EX- PARTE EVIDENCE (P) | ||
| 35837 | CGIT/NGP/21/21-22 | Cgit Nagpur | ID | Shri Waman N. Nagpure | Western Coalfield Limited |
21/06/2024 05/09/2024 13/11/2024 07/04/2025 08/08/2025 10/10/2025 13/01/2026 24/03/2026 16/06/2026 |
EX- PARTE EVIDENCE (P) | ||
| 35838 | CGIT/NGP/21/21-22 | Cgit Nagpur | ID | Shri Waman N. Nagpure | Western Coalfield Limited |
21/06/2024 05/09/2024 13/11/2024 07/04/2025 08/08/2025 10/10/2025 13/01/2026 24/03/2026 16/06/2026 |
EX- PARTE EVIDENCE (P) | ||
| 35839 | CGIT/NGP/21/21-22 | Cgit Nagpur | ID | Shri Waman N. Nagpure | Western Coalfield Limited |
21/06/2024 05/09/2024 13/11/2024 07/04/2025 08/08/2025 10/10/2025 13/01/2026 24/03/2026 16/06/2026 |
EX- PARTE EVIDENCE (P) | ||
| 35840 | CGIT/NGP/21/21-22 | Cgit Nagpur | ID | Shri Waman N. Nagpure | Western Coalfield Limited |
21/06/2024 05/09/2024 13/11/2024 07/04/2025 08/08/2025 10/10/2025 13/01/2026 24/03/2026 16/06/2026 |
EX- PARTE EVIDENCE (P) | ||
| 35841 | CGIT/NGP/21/21-22 | Cgit Nagpur | ID | Shri Waman N. Nagpure | Western Coalfield Limited |
21/06/2024 05/09/2024 13/11/2024 07/04/2025 08/08/2025 10/10/2025 13/01/2026 24/03/2026 16/06/2026 |
EX- PARTE EVIDENCE (P) | ||
| 35842 | CGIT/NGP/20/2021-22 | Cgit Nagpur | ID | Shri Mandhata Ram | Western Coalfield Limited |
05/04/2024 21/06/2024 05/09/2024 13/11/2024 07/04/2025 08/08/2025 10/10/2025 17/11/2025 14/01/2026 10/04/2026 |
EX- PARTE EVIDENCE (P) | ||
| 35843 | CGIT/NGP/20/2021-22 | Cgit Nagpur | ID | Shri Mandhata Ram | Western Coalfield Limited |
05/04/2024 21/06/2024 05/09/2024 13/11/2024 07/04/2025 08/08/2025 10/10/2025 17/11/2025 14/01/2026 10/04/2026 |
EX- PARTE EVIDENCE (P) | ||
| 35844 | CGIT/NGP/20/2021-22 | Cgit Nagpur | ID | Shri Mandhata Ram | Western Coalfield Limited |
05/04/2024 21/06/2024 05/09/2024 13/11/2024 07/04/2025 08/08/2025 10/10/2025 17/11/2025 14/01/2026 10/04/2026 |
EX- PARTE EVIDENCE (P) | ||
| 35845 | CGIT/NGP/20/2021-22 | Cgit Nagpur | ID | Shri Mandhata Ram | Western Coalfield Limited |
05/04/2024 21/06/2024 05/09/2024 13/11/2024 07/04/2025 08/08/2025 10/10/2025 17/11/2025 14/01/2026 10/04/2026 |
EX- PARTE EVIDENCE (P) | ||
| 35846 | CGIT/NGP/20/2021-22 | Cgit Nagpur | ID | Shri Mandhata Ram | Western Coalfield Limited |
05/04/2024 21/06/2024 05/09/2024 13/11/2024 07/04/2025 08/08/2025 10/10/2025 17/11/2025 14/01/2026 10/04/2026 |
EX- PARTE EVIDENCE (P) | ||
| 35847 | CGIT/NGP/20/2021-22 | Cgit Nagpur | ID | Shri Mandhata Ram | Western Coalfield Limited |
05/04/2024 21/06/2024 05/09/2024 13/11/2024 07/04/2025 08/08/2025 10/10/2025 17/11/2025 14/01/2026 10/04/2026 |
EX- PARTE EVIDENCE (P) | ||
| 35848 | CGIT/NGP/20/2021-22 | Cgit Nagpur | ID | Shri Mandhata Ram | Western Coalfield Limited |
05/04/2024 21/06/2024 05/09/2024 13/11/2024 07/04/2025 08/08/2025 10/10/2025 17/11/2025 14/01/2026 10/04/2026 |
EX- PARTE EVIDENCE (P) | ||
| 35849 | CGIT/NGP/20/2021-22 | Cgit Nagpur | ID | Shri Mandhata Ram | Western Coalfield Limited |
05/04/2024 21/06/2024 05/09/2024 13/11/2024 07/04/2025 08/08/2025 10/10/2025 17/11/2025 14/01/2026 10/04/2026 |
EX- PARTE EVIDENCE (P) | ||
| 35850 | CGIT/NGP/20/2021-22 | Cgit Nagpur | ID | Shri Mandhata Ram | Western Coalfield Limited |
05/04/2024 21/06/2024 05/09/2024 13/11/2024 07/04/2025 08/08/2025 10/10/2025 17/11/2025 14/01/2026 10/04/2026 |
EX- PARTE EVIDENCE (P) |