Cause List
| S.No. | Case No. | Subject | Case Type | Name of Appellant | Respondent | Next Date | Details | Order / Decision | Edit |
|---|---|---|---|---|---|---|---|---|---|
| 34801 | 144/2021 | 14B | EPF Appeal | Pudukottai Security Services | APFC, Trichy |
03/06/2024 09/09/2024 09/12/2024 22/01/2025 24/04/2025 24/07/2025 24/09/2025 31/12/2025 04/02/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 37% of the assessed amount is waived off. The Respondent is directed to recover only 63% of the assessed amount of damages u/s. 14B of the Act. | ||
| 34802 | 144/2021 | 14B | EPF Appeal | Pudukottai Security Services | APFC, Trichy |
03/06/2024 09/09/2024 09/12/2024 22/01/2025 24/04/2025 24/07/2025 24/09/2025 31/12/2025 04/02/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 37% of the assessed amount is waived off. The Respondent is directed to recover only 63% of the assessed amount of damages u/s. 14B of the Act. | ||
| 34803 | 144/2021 | 14B | EPF Appeal | Pudukottai Security Services | APFC, Trichy |
03/06/2024 09/09/2024 09/12/2024 22/01/2025 24/04/2025 24/07/2025 24/09/2025 31/12/2025 04/02/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 37% of the assessed amount is waived off. The Respondent is directed to recover only 63% of the assessed amount of damages u/s. 14B of the Act. | ||
| 34804 | 144/2021 | 14B | EPF Appeal | Pudukottai Security Services | APFC, Trichy |
03/06/2024 09/09/2024 09/12/2024 22/01/2025 24/04/2025 24/07/2025 24/09/2025 31/12/2025 04/02/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 37% of the assessed amount is waived off. The Respondent is directed to recover only 63% of the assessed amount of damages u/s. 14B of the Act. | ||
| 34805 | 144/2021 | 14B | EPF Appeal | Pudukottai Security Services | APFC, Trichy |
03/06/2024 09/09/2024 09/12/2024 22/01/2025 24/04/2025 24/07/2025 24/09/2025 31/12/2025 04/02/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 37% of the assessed amount is waived off. The Respondent is directed to recover only 63% of the assessed amount of damages u/s. 14B of the Act. | ||
| 34806 | 144/2021 | 14B | EPF Appeal | Pudukottai Security Services | APFC, Trichy |
03/06/2024 09/09/2024 09/12/2024 22/01/2025 24/04/2025 24/07/2025 24/09/2025 31/12/2025 04/02/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 37% of the assessed amount is waived off. The Respondent is directed to recover only 63% of the assessed amount of damages u/s. 14B of the Act. | ||
| 34807 | 144/2021 | 14B | EPF Appeal | Pudukottai Security Services | APFC, Trichy |
03/06/2024 09/09/2024 09/12/2024 22/01/2025 24/04/2025 24/07/2025 24/09/2025 31/12/2025 04/02/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 37% of the assessed amount is waived off. The Respondent is directed to recover only 63% of the assessed amount of damages u/s. 14B of the Act. | ||
| 34808 | 144/2021 | 14B | EPF Appeal | Pudukottai Security Services | APFC, Trichy |
03/06/2024 09/09/2024 09/12/2024 22/01/2025 24/04/2025 24/07/2025 24/09/2025 31/12/2025 04/02/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 37% of the assessed amount is waived off. The Respondent is directed to recover only 63% of the assessed amount of damages u/s. 14B of the Act. | ||
| 34809 | 144/2021 | 14B | EPF Appeal | Pudukottai Security Services | APFC, Trichy |
03/06/2024 09/09/2024 09/12/2024 22/01/2025 24/04/2025 24/07/2025 24/09/2025 31/12/2025 04/02/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 37% of the assessed amount is waived off. The Respondent is directed to recover only 63% of the assessed amount of damages u/s. 14B of the Act. | ||
| 34810 | 144/2021 | 14B | EPF Appeal | Pudukottai Security Services | APFC, Trichy |
03/06/2024 09/09/2024 09/12/2024 22/01/2025 24/04/2025 24/07/2025 24/09/2025 31/12/2025 04/02/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 37% of the assessed amount is waived off. The Respondent is directed to recover only 63% of the assessed amount of damages u/s. 14B of the Act. | ||
| 34811 | 143/2021 | 14B | EPF Appeal | T1710 Chithirakkudi Primary Agricultural Co-operative Bank Ltd., | APFC, Trichy |
13/12/2024 14/03/2025 13/06/2025 01/07/2025 29/08/2025 26/11/2025 04/03/2026 |
Final Order - Waived 35% of assessed amount passed by Respondent order dtd 24.11.2015. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law. | ||
| 34812 | 143/2021 | 14B | EPF Appeal | T1710 Chithirakkudi Primary Agricultural Co-operative Bank Ltd., | APFC, Trichy |
13/12/2024 14/03/2025 13/06/2025 01/07/2025 29/08/2025 26/11/2025 04/03/2026 |
Final Order - Waived 35% of assessed amount passed by Respondent order dtd 24.11.2015. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law. | ||
| 34813 | 143/2021 | 14B | EPF Appeal | T1710 Chithirakkudi Primary Agricultural Co-operative Bank Ltd., | APFC, Trichy |
13/12/2024 14/03/2025 13/06/2025 01/07/2025 29/08/2025 26/11/2025 04/03/2026 |
Final Order - Waived 35% of assessed amount passed by Respondent order dtd 24.11.2015. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law. | ||
| 34814 | 143/2021 | 14B | EPF Appeal | T1710 Chithirakkudi Primary Agricultural Co-operative Bank Ltd., | APFC, Trichy |
13/12/2024 14/03/2025 13/06/2025 01/07/2025 29/08/2025 26/11/2025 04/03/2026 |
Final Order - Waived 35% of assessed amount passed by Respondent order dtd 24.11.2015. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law. | ||
| 34815 | 143/2021 | 14B | EPF Appeal | T1710 Chithirakkudi Primary Agricultural Co-operative Bank Ltd., | APFC, Trichy |
13/12/2024 14/03/2025 13/06/2025 01/07/2025 29/08/2025 26/11/2025 04/03/2026 |
Final Order - Waived 35% of assessed amount passed by Respondent order dtd 24.11.2015. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law. | ||
| 34816 | 143/2021 | 14B | EPF Appeal | T1710 Chithirakkudi Primary Agricultural Co-operative Bank Ltd., | APFC, Trichy |
13/12/2024 14/03/2025 13/06/2025 01/07/2025 29/08/2025 26/11/2025 04/03/2026 |
Final Order - Waived 35% of assessed amount passed by Respondent order dtd 24.11.2015. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law. | ||
| 34817 | 143/2021 | 14B | EPF Appeal | T1710 Chithirakkudi Primary Agricultural Co-operative Bank Ltd., | APFC, Trichy |
13/12/2024 14/03/2025 13/06/2025 01/07/2025 29/08/2025 26/11/2025 04/03/2026 |
Final Order - Waived 35% of assessed amount passed by Respondent order dtd 24.11.2015. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law. | ||
| 34818 | 140/2021 | 14B | EPF Appeal | Saraswathi Pachiappan Educational Charitable Trust | APFC, Salem |
20/08/2024 21/11/2024 28/02/2025 23/05/2025 20/08/2025 13/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. | ||
| 34819 | 140/2021 | 14B | EPF Appeal | Saraswathi Pachiappan Educational Charitable Trust | APFC, Salem |
20/08/2024 21/11/2024 28/02/2025 23/05/2025 20/08/2025 13/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. | ||
| 34820 | 140/2021 | 14B | EPF Appeal | Saraswathi Pachiappan Educational Charitable Trust | APFC, Salem |
20/08/2024 21/11/2024 28/02/2025 23/05/2025 20/08/2025 13/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. | ||
| 34821 | 140/2021 | 14B | EPF Appeal | Saraswathi Pachiappan Educational Charitable Trust | APFC, Salem |
20/08/2024 21/11/2024 28/02/2025 23/05/2025 20/08/2025 13/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. | ||
| 34822 | 140/2021 | 14B | EPF Appeal | Saraswathi Pachiappan Educational Charitable Trust | APFC, Salem |
20/08/2024 21/11/2024 28/02/2025 23/05/2025 20/08/2025 13/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. | ||
| 34823 | 140/2021 | 14B | EPF Appeal | Saraswathi Pachiappan Educational Charitable Trust | APFC, Salem |
20/08/2024 21/11/2024 28/02/2025 23/05/2025 20/08/2025 13/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. | ||
| 34824 | 140/2021 | 14B | EPF Appeal | Saraswathi Pachiappan Educational Charitable Trust | APFC, Salem |
20/08/2024 21/11/2024 28/02/2025 23/05/2025 20/08/2025 13/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. | ||
| 34825 | 139/2021 | 14B | EPF Appeal | A 387 The Kodaikanal Co-operative Stores Ltd., | APFC, Dindigul |
10/08/2023 09/11/2023 11/04/2024 11/07/2024 21/10/2024 10/01/2025 21/04/2025 11/07/2025 10/09/2025 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 34826 | 139/2021 | 14B | EPF Appeal | A 387 The Kodaikanal Co-operative Stores Ltd., | APFC, Dindigul |
10/08/2023 09/11/2023 11/04/2024 11/07/2024 21/10/2024 10/01/2025 21/04/2025 11/07/2025 10/09/2025 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 34827 | 139/2021 | 14B | EPF Appeal | A 387 The Kodaikanal Co-operative Stores Ltd., | APFC, Dindigul |
10/08/2023 09/11/2023 11/04/2024 11/07/2024 21/10/2024 10/01/2025 21/04/2025 11/07/2025 10/09/2025 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 34828 | 139/2021 | 14B | EPF Appeal | A 387 The Kodaikanal Co-operative Stores Ltd., | APFC, Dindigul |
10/08/2023 09/11/2023 11/04/2024 11/07/2024 21/10/2024 10/01/2025 21/04/2025 11/07/2025 10/09/2025 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 34829 | 139/2021 | 14B | EPF Appeal | A 387 The Kodaikanal Co-operative Stores Ltd., | APFC, Dindigul |
10/08/2023 09/11/2023 11/04/2024 11/07/2024 21/10/2024 10/01/2025 21/04/2025 11/07/2025 10/09/2025 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 34830 | 139/2021 | 14B | EPF Appeal | A 387 The Kodaikanal Co-operative Stores Ltd., | APFC, Dindigul |
10/08/2023 09/11/2023 11/04/2024 11/07/2024 21/10/2024 10/01/2025 21/04/2025 11/07/2025 10/09/2025 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 34831 | 139/2021 | 14B | EPF Appeal | A 387 The Kodaikanal Co-operative Stores Ltd., | APFC, Dindigul |
10/08/2023 09/11/2023 11/04/2024 11/07/2024 21/10/2024 10/01/2025 21/04/2025 11/07/2025 10/09/2025 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 34832 | 139/2021 | 14B | EPF Appeal | A 387 The Kodaikanal Co-operative Stores Ltd., | APFC, Dindigul |
10/08/2023 09/11/2023 11/04/2024 11/07/2024 21/10/2024 10/01/2025 21/04/2025 11/07/2025 10/09/2025 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 34833 | 139/2021 | 14B | EPF Appeal | A 387 The Kodaikanal Co-operative Stores Ltd., | APFC, Dindigul |
10/08/2023 09/11/2023 11/04/2024 11/07/2024 21/10/2024 10/01/2025 21/04/2025 11/07/2025 10/09/2025 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 34834 | 138/2021 | 14B | EPF Appeal | Sri Sai Services | APFC, Dindigul |
23/12/2024 24/03/2025 23/06/2025 14/08/2025 29/10/2025 16/02/2026 08/05/2026 |
The Counsel for the Appellant filed the petition seeking adjournment. Petition allowed. The learned Counsel on behalf of the Respondent is present. List to 08.05.2026 for hearing on Arguments/filing of written submission. | ||
| 34835 | 138/2021 | 14B | EPF Appeal | Sri Sai Services | APFC, Dindigul |
23/12/2024 24/03/2025 23/06/2025 14/08/2025 29/10/2025 16/02/2026 08/05/2026 |
The Counsel for the Appellant filed the petition seeking adjournment. Petition allowed. The learned Counsel on behalf of the Respondent is present. List to 08.05.2026 for hearing on Arguments/filing of written submission. | ||
| 34836 | 138/2021 | 14B | EPF Appeal | Sri Sai Services | APFC, Dindigul |
23/12/2024 24/03/2025 23/06/2025 14/08/2025 29/10/2025 16/02/2026 08/05/2026 |
The Counsel for the Appellant filed the petition seeking adjournment. Petition allowed. The learned Counsel on behalf of the Respondent is present. List to 08.05.2026 for hearing on Arguments/filing of written submission. | ||
| 34837 | 138/2021 | 14B | EPF Appeal | Sri Sai Services | APFC, Dindigul |
23/12/2024 24/03/2025 23/06/2025 14/08/2025 29/10/2025 16/02/2026 08/05/2026 |
The Counsel for the Appellant filed the petition seeking adjournment. Petition allowed. The learned Counsel on behalf of the Respondent is present. List to 08.05.2026 for hearing on Arguments/filing of written submission. | ||
| 34838 | 138/2021 | 14B | EPF Appeal | Sri Sai Services | APFC, Dindigul |
23/12/2024 24/03/2025 23/06/2025 14/08/2025 29/10/2025 16/02/2026 08/05/2026 |
The Counsel for the Appellant filed the petition seeking adjournment. Petition allowed. The learned Counsel on behalf of the Respondent is present. List to 08.05.2026 for hearing on Arguments/filing of written submission. | ||
| 34839 | 138/2021 | 14B | EPF Appeal | Sri Sai Services | APFC, Dindigul |
23/12/2024 24/03/2025 23/06/2025 14/08/2025 29/10/2025 16/02/2026 08/05/2026 |
The Counsel for the Appellant filed the petition seeking adjournment. Petition allowed. The learned Counsel on behalf of the Respondent is present. List to 08.05.2026 for hearing on Arguments/filing of written submission. | ||
| 34840 | 138/2021 | 14B | EPF Appeal | Sri Sai Services | APFC, Dindigul |
23/12/2024 24/03/2025 23/06/2025 14/08/2025 29/10/2025 16/02/2026 08/05/2026 |
The Counsel for the Appellant filed the petition seeking adjournment. Petition allowed. The learned Counsel on behalf of the Respondent is present. List to 08.05.2026 for hearing on Arguments/filing of written submission. | ||
| 34841 | 137/2021 | 14B | EPF Appeal | Annai college of Engineering & Technology | APFC, Trichy |
09/12/2024 09/12/2024 17/01/2025 06/03/2025 18/04/2025 28/05/2025 15/07/2025 12/09/2025 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 34842 | 137/2021 | 14B | EPF Appeal | Annai college of Engineering & Technology | APFC, Trichy |
09/12/2024 09/12/2024 17/01/2025 06/03/2025 18/04/2025 28/05/2025 15/07/2025 12/09/2025 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 34843 | 137/2021 | 14B | EPF Appeal | Annai college of Engineering & Technology | APFC, Trichy |
09/12/2024 09/12/2024 17/01/2025 06/03/2025 18/04/2025 28/05/2025 15/07/2025 12/09/2025 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 34844 | 137/2021 | 14B | EPF Appeal | Annai college of Engineering & Technology | APFC, Trichy |
09/12/2024 09/12/2024 17/01/2025 06/03/2025 18/04/2025 28/05/2025 15/07/2025 12/09/2025 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 34845 | 137/2021 | 14B | EPF Appeal | Annai college of Engineering & Technology | APFC, Trichy |
09/12/2024 09/12/2024 17/01/2025 06/03/2025 18/04/2025 28/05/2025 15/07/2025 12/09/2025 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 34846 | 137/2021 | 14B | EPF Appeal | Annai college of Engineering & Technology | APFC, Trichy |
09/12/2024 09/12/2024 17/01/2025 06/03/2025 18/04/2025 28/05/2025 15/07/2025 12/09/2025 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 34847 | 137/2021 | 14B | EPF Appeal | Annai college of Engineering & Technology | APFC, Trichy |
09/12/2024 09/12/2024 17/01/2025 06/03/2025 18/04/2025 28/05/2025 15/07/2025 12/09/2025 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 34848 | 137/2021 | 14B | EPF Appeal | Annai college of Engineering & Technology | APFC, Trichy |
09/12/2024 09/12/2024 17/01/2025 06/03/2025 18/04/2025 28/05/2025 15/07/2025 12/09/2025 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 34849 | 136/2021 | 14B | EPF Appeal | Annai College of Polytechnic | APFC, Trichy |
09/01/2024 16/04/2024 24/07/2024 04/11/2024 10/02/2025 01/04/2025 30/04/2025 06/06/2025 31/07/2025 |
Final Order - The Appeal stands dismissed for want of prosection. | ||
| 34850 | 136/2021 | 14B | EPF Appeal | Annai College of Polytechnic | APFC, Trichy |
09/01/2024 16/04/2024 24/07/2024 04/11/2024 10/02/2025 01/04/2025 30/04/2025 06/06/2025 31/07/2025 |
Final Order - The Appeal stands dismissed for want of prosection. |