Cause List
| S.No. | Case No. | Subject | Case Type | Name of Appellant | Respondent | Next Date | Details | Order / Decision | Edit |
|---|---|---|---|---|---|---|---|---|---|
| 64951 | 132/2017 | 14B | EPF Appeal | Radha Krishna Mills Ltd. | APFC, Coimbatore |
10/09/2024 10/12/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 25/06/2026 |
The Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. Meera Gnanasekar, the learned Counsel on behalf of the Respondent is present. List to 25.06.2026 for hearing on Arguments/filing of written submission. | ||
| 64952 | 132/2017 | 14B | EPF Appeal | Radha Krishna Mills Ltd. | APFC, Coimbatore |
10/09/2024 10/12/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 25/06/2026 |
The Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. Meera Gnanasekar, the learned Counsel on behalf of the Respondent is present. List to 25.06.2026 for hearing on Arguments/filing of written submission. | ||
| 64953 | 132/2017 | 14B | EPF Appeal | Radha Krishna Mills Ltd. | APFC, Coimbatore |
10/09/2024 10/12/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 25/06/2026 |
The Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. Meera Gnanasekar, the learned Counsel on behalf of the Respondent is present. List to 25.06.2026 for hearing on Arguments/filing of written submission. | ||
| 64954 | 132/2017 | 14B | EPF Appeal | Radha Krishna Mills Ltd. | APFC, Coimbatore |
10/09/2024 10/12/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 25/06/2026 |
The Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. Meera Gnanasekar, the learned Counsel on behalf of the Respondent is present. List to 25.06.2026 for hearing on Arguments/filing of written submission. | ||
| 64955 | 132/2017 | 14B | EPF Appeal | Radha Krishna Mills Ltd. | APFC, Coimbatore |
10/09/2024 10/12/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 25/06/2026 |
The Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. Meera Gnanasekar, the learned Counsel on behalf of the Respondent is present. List to 25.06.2026 for hearing on Arguments/filing of written submission. | ||
| 64956 | 132/2017 | 14B | EPF Appeal | Radha Krishna Mills Ltd. | APFC, Coimbatore |
10/09/2024 10/12/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 25/06/2026 |
The Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. Meera Gnanasekar, the learned Counsel on behalf of the Respondent is present. List to 25.06.2026 for hearing on Arguments/filing of written submission. | ||
| 64957 | 132/2017 | 14B | EPF Appeal | Radha Krishna Mills Ltd. | APFC, Coimbatore |
10/09/2024 10/12/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 25/06/2026 |
The Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. Meera Gnanasekar, the learned Counsel on behalf of the Respondent is present. List to 25.06.2026 for hearing on Arguments/filing of written submission. | ||
| 64958 | 132/2017 | 14B | EPF Appeal | Radha Krishna Mills Ltd. | APFC, Coimbatore |
10/09/2024 10/12/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 25/06/2026 |
The Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. Meera Gnanasekar, the learned Counsel on behalf of the Respondent is present. List to 25.06.2026 for hearing on Arguments/filing of written submission. | ||
| 64959 | 132/2017 | 14B | EPF Appeal | Radha Krishna Mills Ltd. | APFC, Coimbatore |
10/09/2024 10/12/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 25/06/2026 |
The Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. Meera Gnanasekar, the learned Counsel on behalf of the Respondent is present. List to 25.06.2026 for hearing on Arguments/filing of written submission. | ||
| 64960 | 149/2017 | 7Q | EPF Appeal | Radha Krishna Mills Ltd. | APFC, Coimbatore |
04/03/2025 02/05/2025 20/06/2025 13/08/2025 24/10/2025 16/02/2026 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 64961 | 149/2017 | 7Q | EPF Appeal | Radha Krishna Mills Ltd. | APFC, Coimbatore |
04/03/2025 02/05/2025 20/06/2025 13/08/2025 24/10/2025 16/02/2026 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 64962 | 149/2017 | 7Q | EPF Appeal | Radha Krishna Mills Ltd. | APFC, Coimbatore |
04/03/2025 02/05/2025 20/06/2025 13/08/2025 24/10/2025 16/02/2026 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 64963 | 149/2017 | 7Q | EPF Appeal | Radha Krishna Mills Ltd. | APFC, Coimbatore |
04/03/2025 02/05/2025 20/06/2025 13/08/2025 24/10/2025 16/02/2026 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 64964 | 149/2017 | 7Q | EPF Appeal | Radha Krishna Mills Ltd. | APFC, Coimbatore |
04/03/2025 02/05/2025 20/06/2025 13/08/2025 24/10/2025 16/02/2026 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 64965 | 149/2017 | 7Q | EPF Appeal | Radha Krishna Mills Ltd. | APFC, Coimbatore |
04/03/2025 02/05/2025 20/06/2025 13/08/2025 24/10/2025 16/02/2026 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 64966 | CGIT/LC/EPFA/93/2017 | SECTION-7A | EPF Appeal | ROCA BATHROOM PRODUCT | APFC, INDORE |
03/09/2025 13/01/2026 18/02/2026 04/05/2026 |
FOR ARGUMENT | Download, Download, Download, Download, Download, Download | |
| 64967 | CGIT/LC/EPFA/93/2017 | SECTION-7A | EPF Appeal | ROCA BATHROOM PRODUCT | APFC, INDORE |
03/09/2025 13/01/2026 18/02/2026 04/05/2026 |
FOR ARGUMENT | Download, Download, Download, Download, Download, Download | |
| 64968 | CGIT/LC/EPFA/93/2017 | SECTION-7A | EPF Appeal | ROCA BATHROOM PRODUCT | APFC, INDORE |
03/09/2025 13/01/2026 18/02/2026 04/05/2026 |
FOR ARGUMENT | Download, Download, Download, Download, Download, Download | |
| 64969 | CGIT/LC/EPFA/93/2017 | SECTION-7A | EPF Appeal | ROCA BATHROOM PRODUCT | APFC, INDORE |
03/09/2025 13/01/2026 18/02/2026 04/05/2026 |
FOR ARGUMENT | Download, Download, Download, Download, Download, Download | |
| 64970 | 285/2018 | 7A | EPF Appeal | Carolyn Estate | RPFC, Coimbatore |
10/12/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 25/06/2026 |
M/s. M. Aishwariya, the Counsel on behalf of the Appellant is present. M/s. K. Prabakar, the learned Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 25.06.2026 for hearing on Arguments/filing of written submission. | ||
| 64971 | 285/2018 | 7A | EPF Appeal | Carolyn Estate | RPFC, Coimbatore |
10/12/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 25/06/2026 |
M/s. M. Aishwariya, the Counsel on behalf of the Appellant is present. M/s. K. Prabakar, the learned Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 25.06.2026 for hearing on Arguments/filing of written submission. | ||
| 64972 | 285/2018 | 7A | EPF Appeal | Carolyn Estate | RPFC, Coimbatore |
10/12/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 25/06/2026 |
M/s. M. Aishwariya, the Counsel on behalf of the Appellant is present. M/s. K. Prabakar, the learned Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 25.06.2026 for hearing on Arguments/filing of written submission. | ||
| 64973 | 285/2018 | 7A | EPF Appeal | Carolyn Estate | RPFC, Coimbatore |
10/12/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 25/06/2026 |
M/s. M. Aishwariya, the Counsel on behalf of the Appellant is present. M/s. K. Prabakar, the learned Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 25.06.2026 for hearing on Arguments/filing of written submission. | ||
| 64974 | 285/2018 | 7A | EPF Appeal | Carolyn Estate | RPFC, Coimbatore |
10/12/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 25/06/2026 |
M/s. M. Aishwariya, the Counsel on behalf of the Appellant is present. M/s. K. Prabakar, the learned Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 25.06.2026 for hearing on Arguments/filing of written submission. | ||
| 64975 | 285/2018 | 7A | EPF Appeal | Carolyn Estate | RPFC, Coimbatore |
10/12/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 25/06/2026 |
M/s. M. Aishwariya, the Counsel on behalf of the Appellant is present. M/s. K. Prabakar, the learned Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 25.06.2026 for hearing on Arguments/filing of written submission. | ||
| 64976 | 285/2018 | 7A | EPF Appeal | Carolyn Estate | RPFC, Coimbatore |
10/12/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 25/06/2026 |
M/s. M. Aishwariya, the Counsel on behalf of the Appellant is present. M/s. K. Prabakar, the learned Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 25.06.2026 for hearing on Arguments/filing of written submission. | ||
| 64977 | 285/2018 | 7A | EPF Appeal | Carolyn Estate | RPFC, Coimbatore |
10/12/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 25/06/2026 |
M/s. M. Aishwariya, the Counsel on behalf of the Appellant is present. M/s. K. Prabakar, the learned Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 25.06.2026 for hearing on Arguments/filing of written submission. | ||
| 64978 | 599/2018 | 14B | EPF Appeal | Niranjan Enterprises | APFC, Coimbatore |
03/02/2025 02/04/2025 28/05/2025 16/07/2025 12/09/2025 26/12/2025 25/02/2026 |
(Special Campaign) Final Order - Waived 30% of assessed amount passed by Respondent order dtd 09.02.2018. Respondent will recover remaining 70% of assessed amount from Appellant in accordance with law | ||
| 64979 | 599/2018 | 14B | EPF Appeal | Niranjan Enterprises | APFC, Coimbatore |
03/02/2025 02/04/2025 28/05/2025 16/07/2025 12/09/2025 26/12/2025 25/02/2026 |
(Special Campaign) Final Order - Waived 30% of assessed amount passed by Respondent order dtd 09.02.2018. Respondent will recover remaining 70% of assessed amount from Appellant in accordance with law | ||
| 64980 | 599/2018 | 14B | EPF Appeal | Niranjan Enterprises | APFC, Coimbatore |
03/02/2025 02/04/2025 28/05/2025 16/07/2025 12/09/2025 26/12/2025 25/02/2026 |
(Special Campaign) Final Order - Waived 30% of assessed amount passed by Respondent order dtd 09.02.2018. Respondent will recover remaining 70% of assessed amount from Appellant in accordance with law | ||
| 64981 | 599/2018 | 14B | EPF Appeal | Niranjan Enterprises | APFC, Coimbatore |
03/02/2025 02/04/2025 28/05/2025 16/07/2025 12/09/2025 26/12/2025 25/02/2026 |
(Special Campaign) Final Order - Waived 30% of assessed amount passed by Respondent order dtd 09.02.2018. Respondent will recover remaining 70% of assessed amount from Appellant in accordance with law | ||
| 64982 | 599/2018 | 14B | EPF Appeal | Niranjan Enterprises | APFC, Coimbatore |
03/02/2025 02/04/2025 28/05/2025 16/07/2025 12/09/2025 26/12/2025 25/02/2026 |
(Special Campaign) Final Order - Waived 30% of assessed amount passed by Respondent order dtd 09.02.2018. Respondent will recover remaining 70% of assessed amount from Appellant in accordance with law | ||
| 64983 | 599/2018 | 14B | EPF Appeal | Niranjan Enterprises | APFC, Coimbatore |
03/02/2025 02/04/2025 28/05/2025 16/07/2025 12/09/2025 26/12/2025 25/02/2026 |
(Special Campaign) Final Order - Waived 30% of assessed amount passed by Respondent order dtd 09.02.2018. Respondent will recover remaining 70% of assessed amount from Appellant in accordance with law | ||
| 64984 | 599/2018 | 14B | EPF Appeal | Niranjan Enterprises | APFC, Coimbatore |
03/02/2025 02/04/2025 28/05/2025 16/07/2025 12/09/2025 26/12/2025 25/02/2026 |
(Special Campaign) Final Order - Waived 30% of assessed amount passed by Respondent order dtd 09.02.2018. Respondent will recover remaining 70% of assessed amount from Appellant in accordance with law | ||
| 64985 | 612/2018 | 14B | EPF Appeal | Palani Andavar Cotton & Synthetic Spinners Ltd. | APFC, Coimbatore |
30/12/2024 28/03/2025 27/06/2025 28/08/2025 21/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 64986 | 612/2018 | 14B | EPF Appeal | Palani Andavar Cotton & Synthetic Spinners Ltd. | APFC, Coimbatore |
30/12/2024 28/03/2025 27/06/2025 28/08/2025 21/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 64987 | 612/2018 | 14B | EPF Appeal | Palani Andavar Cotton & Synthetic Spinners Ltd. | APFC, Coimbatore |
30/12/2024 28/03/2025 27/06/2025 28/08/2025 21/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 64988 | 612/2018 | 14B | EPF Appeal | Palani Andavar Cotton & Synthetic Spinners Ltd. | APFC, Coimbatore |
30/12/2024 28/03/2025 27/06/2025 28/08/2025 21/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 64989 | 612/2018 | 14B | EPF Appeal | Palani Andavar Cotton & Synthetic Spinners Ltd. | APFC, Coimbatore |
30/12/2024 28/03/2025 27/06/2025 28/08/2025 21/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 64990 | 612/2018 | 14B | EPF Appeal | Palani Andavar Cotton & Synthetic Spinners Ltd. | APFC, Coimbatore |
30/12/2024 28/03/2025 27/06/2025 28/08/2025 21/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 64991 | CGIT/LC/EPFA/91/2017 | SECTION-7A | EPF Appeal | SACHIDANAND STEEL SALES INDIA PVT.LTD. | APFC, INDORE |
02/09/2021 26/10/2021 |
DISMISS | Download, Download | |
| 64992 | CGIT/LC/EPFA/91/2017 | SECTION-7A | EPF Appeal | SACHIDANAND STEEL SALES INDIA PVT.LTD. | APFC, INDORE |
02/09/2021 26/10/2021 |
DISMISS | Download, Download | |
| 64993 | 620/2018 | 14B | EPF Appeal | Cotton Blossom (India) Pvt. Ltd. | RPFC, Coimbatore |
30/12/2024 28/03/2025 27/06/2025 28/08/2025 21/11/2025 25/02/2026 |
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 27.04.2018. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law | ||
| 64994 | 620/2018 | 14B | EPF Appeal | Cotton Blossom (India) Pvt. Ltd. | RPFC, Coimbatore |
30/12/2024 28/03/2025 27/06/2025 28/08/2025 21/11/2025 25/02/2026 |
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 27.04.2018. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law | ||
| 64995 | 620/2018 | 14B | EPF Appeal | Cotton Blossom (India) Pvt. Ltd. | RPFC, Coimbatore |
30/12/2024 28/03/2025 27/06/2025 28/08/2025 21/11/2025 25/02/2026 |
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 27.04.2018. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law | ||
| 64996 | 620/2018 | 14B | EPF Appeal | Cotton Blossom (India) Pvt. Ltd. | RPFC, Coimbatore |
30/12/2024 28/03/2025 27/06/2025 28/08/2025 21/11/2025 25/02/2026 |
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 27.04.2018. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law | ||
| 64997 | 620/2018 | 14B | EPF Appeal | Cotton Blossom (India) Pvt. Ltd. | RPFC, Coimbatore |
30/12/2024 28/03/2025 27/06/2025 28/08/2025 21/11/2025 25/02/2026 |
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 27.04.2018. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law | ||
| 64998 | 620/2018 | 14B | EPF Appeal | Cotton Blossom (India) Pvt. Ltd. | RPFC, Coimbatore |
30/12/2024 28/03/2025 27/06/2025 28/08/2025 21/11/2025 25/02/2026 |
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 27.04.2018. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law | ||
| 64999 | 654/2018 | 14B | EPF Appeal | Universal Heat Exchangers Ltd. | APFC, Coimbatore |
24/04/2024 24/07/2024 04/11/2024 10/02/2025 05/05/2025 25/07/2025 25/09/2025 01/01/2026 04/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 65000 | 654/2018 | 14B | EPF Appeal | Universal Heat Exchangers Ltd. | APFC, Coimbatore |
24/04/2024 24/07/2024 04/11/2024 10/02/2025 05/05/2025 25/07/2025 25/09/2025 01/01/2026 04/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. |