Cause List
| S.No. | Case No. | Subject | Case Type | Name of Appellant | Respondent | Next Date | Details | Order / Decision | Edit |
|---|---|---|---|---|---|---|---|---|---|
| 67051 | 202/2018 | 14B-7Q | EPF Appeal | BVV Papers Industries Ltd. | APFC, Madurai |
22/06/2023 10/08/2023 26/10/2023 14/03/2024 21/06/2024 08/10/2024 07/01/2025 09/01/2025 |
Final Order - Appeal is dismissed as not pressed by the Appellant. | ||
| 67052 | 220/2018 | 14B | EPF Appeal | Periyapatty Primary Agricultural Co-op Credit Society | APFC, Madurai |
15/01/2025 04/03/2025 01/05/2025 19/06/2025 13/08/2025 29/10/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. The Appeal u/s. 7Q of the Act is dismissed. | ||
| 67053 | 220/2018 | 14B | EPF Appeal | Periyapatty Primary Agricultural Co-op Credit Society | APFC, Madurai |
15/01/2025 04/03/2025 01/05/2025 19/06/2025 13/08/2025 29/10/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. The Appeal u/s. 7Q of the Act is dismissed. | ||
| 67054 | 220/2018 | 14B | EPF Appeal | Periyapatty Primary Agricultural Co-op Credit Society | APFC, Madurai |
15/01/2025 04/03/2025 01/05/2025 19/06/2025 13/08/2025 29/10/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. The Appeal u/s. 7Q of the Act is dismissed. | ||
| 67055 | 220/2018 | 14B | EPF Appeal | Periyapatty Primary Agricultural Co-op Credit Society | APFC, Madurai |
15/01/2025 04/03/2025 01/05/2025 19/06/2025 13/08/2025 29/10/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. The Appeal u/s. 7Q of the Act is dismissed. | ||
| 67056 | 220/2018 | 14B | EPF Appeal | Periyapatty Primary Agricultural Co-op Credit Society | APFC, Madurai |
15/01/2025 04/03/2025 01/05/2025 19/06/2025 13/08/2025 29/10/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. The Appeal u/s. 7Q of the Act is dismissed. | ||
| 67057 | 220/2018 | 14B | EPF Appeal | Periyapatty Primary Agricultural Co-op Credit Society | APFC, Madurai |
15/01/2025 04/03/2025 01/05/2025 19/06/2025 13/08/2025 29/10/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. The Appeal u/s. 7Q of the Act is dismissed. | ||
| 67058 | 220/2018 | 14B | EPF Appeal | Periyapatty Primary Agricultural Co-op Credit Society | APFC, Madurai |
15/01/2025 04/03/2025 01/05/2025 19/06/2025 13/08/2025 29/10/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. The Appeal u/s. 7Q of the Act is dismissed. | ||
| 67059 | 321/2018 | 14B | EPF Appeal | A-1 225 Thenur Primary Agricultural Co-op Bank | APFC, Madurai |
17/01/2025 06/03/2025 14/05/2025 01/07/2025 29/08/2025 26/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 25% of the assessed amount is waived off. The Respondent is directed to recover only 75% of the assessed amount of damages u/s. 14B of the Act. | ||
| 67060 | 321/2018 | 14B | EPF Appeal | A-1 225 Thenur Primary Agricultural Co-op Bank | APFC, Madurai |
17/01/2025 06/03/2025 14/05/2025 01/07/2025 29/08/2025 26/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 25% of the assessed amount is waived off. The Respondent is directed to recover only 75% of the assessed amount of damages u/s. 14B of the Act. | ||
| 67061 | 321/2018 | 14B | EPF Appeal | A-1 225 Thenur Primary Agricultural Co-op Bank | APFC, Madurai |
17/01/2025 06/03/2025 14/05/2025 01/07/2025 29/08/2025 26/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 25% of the assessed amount is waived off. The Respondent is directed to recover only 75% of the assessed amount of damages u/s. 14B of the Act. | ||
| 67062 | 321/2018 | 14B | EPF Appeal | A-1 225 Thenur Primary Agricultural Co-op Bank | APFC, Madurai |
17/01/2025 06/03/2025 14/05/2025 01/07/2025 29/08/2025 26/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 25% of the assessed amount is waived off. The Respondent is directed to recover only 75% of the assessed amount of damages u/s. 14B of the Act. | ||
| 67063 | 321/2018 | 14B | EPF Appeal | A-1 225 Thenur Primary Agricultural Co-op Bank | APFC, Madurai |
17/01/2025 06/03/2025 14/05/2025 01/07/2025 29/08/2025 26/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 25% of the assessed amount is waived off. The Respondent is directed to recover only 75% of the assessed amount of damages u/s. 14B of the Act. | ||
| 67064 | 321/2018 | 14B | EPF Appeal | A-1 225 Thenur Primary Agricultural Co-op Bank | APFC, Madurai |
17/01/2025 06/03/2025 14/05/2025 01/07/2025 29/08/2025 26/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 25% of the assessed amount is waived off. The Respondent is directed to recover only 75% of the assessed amount of damages u/s. 14B of the Act. | ||
| 67065 | 321/2018 | 14B | EPF Appeal | A-1 225 Thenur Primary Agricultural Co-op Bank | APFC, Madurai |
17/01/2025 06/03/2025 14/05/2025 01/07/2025 29/08/2025 26/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 25% of the assessed amount is waived off. The Respondent is directed to recover only 75% of the assessed amount of damages u/s. 14B of the Act. | ||
| 67066 | 135/2017 | 14B | EPF Appeal | Pattukottai Coop. Industrial Training Institute | APFC, Trichy |
18/06/2024 24/09/2024 24/12/2024 25/03/2025 24/06/2025 12/08/2025 23/10/2025 29/01/2026 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 67067 | 135/2017 | 14B | EPF Appeal | Pattukottai Coop. Industrial Training Institute | APFC, Trichy |
18/06/2024 24/09/2024 24/12/2024 25/03/2025 24/06/2025 12/08/2025 23/10/2025 29/01/2026 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 67068 | 135/2017 | 14B | EPF Appeal | Pattukottai Coop. Industrial Training Institute | APFC, Trichy |
18/06/2024 24/09/2024 24/12/2024 25/03/2025 24/06/2025 12/08/2025 23/10/2025 29/01/2026 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 67069 | 135/2017 | 14B | EPF Appeal | Pattukottai Coop. Industrial Training Institute | APFC, Trichy |
18/06/2024 24/09/2024 24/12/2024 25/03/2025 24/06/2025 12/08/2025 23/10/2025 29/01/2026 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 67070 | 135/2017 | 14B | EPF Appeal | Pattukottai Coop. Industrial Training Institute | APFC, Trichy |
18/06/2024 24/09/2024 24/12/2024 25/03/2025 24/06/2025 12/08/2025 23/10/2025 29/01/2026 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 67071 | 135/2017 | 14B | EPF Appeal | Pattukottai Coop. Industrial Training Institute | APFC, Trichy |
18/06/2024 24/09/2024 24/12/2024 25/03/2025 24/06/2025 12/08/2025 23/10/2025 29/01/2026 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 67072 | 135/2017 | 14B | EPF Appeal | Pattukottai Coop. Industrial Training Institute | APFC, Trichy |
18/06/2024 24/09/2024 24/12/2024 25/03/2025 24/06/2025 12/08/2025 23/10/2025 29/01/2026 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 67073 | 135/2017 | 14B | EPF Appeal | Pattukottai Coop. Industrial Training Institute | APFC, Trichy |
18/06/2024 24/09/2024 24/12/2024 25/03/2025 24/06/2025 12/08/2025 23/10/2025 29/01/2026 |
Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 67074 | 506/2017 | 14B-7Q | EPF Appeal | ZA 109 Mangudi Farmer Services Coop. Society Ltd. | APFC, Trichy |
20/06/2023 22/08/2023 07/11/2023 26/03/2024 18/06/2024 24/09/2024 24/12/2024 25/03/2025 24/06/2025 |
Final Order - Appeal is dismissed for want of prosecution. | ||
| 67075 | 506/2017 | 14B-7Q | EPF Appeal | ZA 109 Mangudi Farmer Services Coop. Society Ltd. | APFC, Trichy |
20/06/2023 22/08/2023 07/11/2023 26/03/2024 18/06/2024 24/09/2024 24/12/2024 25/03/2025 24/06/2025 |
Final Order - Appeal is dismissed for want of prosecution. | ||
| 67076 | 506/2017 | 14B-7Q | EPF Appeal | ZA 109 Mangudi Farmer Services Coop. Society Ltd. | APFC, Trichy |
20/06/2023 22/08/2023 07/11/2023 26/03/2024 18/06/2024 24/09/2024 24/12/2024 25/03/2025 24/06/2025 |
Final Order - Appeal is dismissed for want of prosecution. | ||
| 67077 | 506/2017 | 14B-7Q | EPF Appeal | ZA 109 Mangudi Farmer Services Coop. Society Ltd. | APFC, Trichy |
20/06/2023 22/08/2023 07/11/2023 26/03/2024 18/06/2024 24/09/2024 24/12/2024 25/03/2025 24/06/2025 |
Final Order - Appeal is dismissed for want of prosecution. | ||
| 67078 | 506/2017 | 14B-7Q | EPF Appeal | ZA 109 Mangudi Farmer Services Coop. Society Ltd. | APFC, Trichy |
20/06/2023 22/08/2023 07/11/2023 26/03/2024 18/06/2024 24/09/2024 24/12/2024 25/03/2025 24/06/2025 |
Final Order - Appeal is dismissed for want of prosecution. | ||
| 67079 | 506/2017 | 14B-7Q | EPF Appeal | ZA 109 Mangudi Farmer Services Coop. Society Ltd. | APFC, Trichy |
20/06/2023 22/08/2023 07/11/2023 26/03/2024 18/06/2024 24/09/2024 24/12/2024 25/03/2025 24/06/2025 |
Final Order - Appeal is dismissed for want of prosecution. | ||
| 67080 | 506/2017 | 14B-7Q | EPF Appeal | ZA 109 Mangudi Farmer Services Coop. Society Ltd. | APFC, Trichy |
20/06/2023 22/08/2023 07/11/2023 26/03/2024 18/06/2024 24/09/2024 24/12/2024 25/03/2025 24/06/2025 |
Final Order - Appeal is dismissed for want of prosecution. | ||
| 67081 | 506/2017 | 14B-7Q | EPF Appeal | ZA 109 Mangudi Farmer Services Coop. Society Ltd. | APFC, Trichy |
20/06/2023 22/08/2023 07/11/2023 26/03/2024 18/06/2024 24/09/2024 24/12/2024 25/03/2025 24/06/2025 |
Final Order - Appeal is dismissed for want of prosecution. | ||
| 67082 | 506/2017 | 14B-7Q | EPF Appeal | ZA 109 Mangudi Farmer Services Coop. Society Ltd. | APFC, Trichy |
20/06/2023 22/08/2023 07/11/2023 26/03/2024 18/06/2024 24/09/2024 24/12/2024 25/03/2025 24/06/2025 |
Final Order - Appeal is dismissed for want of prosecution. | ||
| 67083 | 201/2018 | 7A | EPF Appeal | SRF Industrial Fabrics | APFC, Trichy |
24/12/2024 25/03/2025 24/06/2025 12/08/2025 23/10/2025 29/01/2026 29/04/2026 |
The Counsel for the Appellant prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 29.04.2026 for hearing on Arguments/filing of written submission. | ||
| 67084 | 201/2018 | 7A | EPF Appeal | SRF Industrial Fabrics | APFC, Trichy |
24/12/2024 25/03/2025 24/06/2025 12/08/2025 23/10/2025 29/01/2026 29/04/2026 |
The Counsel for the Appellant prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 29.04.2026 for hearing on Arguments/filing of written submission. | ||
| 67085 | 201/2018 | 7A | EPF Appeal | SRF Industrial Fabrics | APFC, Trichy |
24/12/2024 25/03/2025 24/06/2025 12/08/2025 23/10/2025 29/01/2026 29/04/2026 |
The Counsel for the Appellant prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 29.04.2026 for hearing on Arguments/filing of written submission. | ||
| 67086 | 201/2018 | 7A | EPF Appeal | SRF Industrial Fabrics | APFC, Trichy |
24/12/2024 25/03/2025 24/06/2025 12/08/2025 23/10/2025 29/01/2026 29/04/2026 |
The Counsel for the Appellant prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 29.04.2026 for hearing on Arguments/filing of written submission. | ||
| 67087 | 201/2018 | 7A | EPF Appeal | SRF Industrial Fabrics | APFC, Trichy |
24/12/2024 25/03/2025 24/06/2025 12/08/2025 23/10/2025 29/01/2026 29/04/2026 |
The Counsel for the Appellant prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 29.04.2026 for hearing on Arguments/filing of written submission. | ||
| 67088 | 201/2018 | 7A | EPF Appeal | SRF Industrial Fabrics | APFC, Trichy |
24/12/2024 25/03/2025 24/06/2025 12/08/2025 23/10/2025 29/01/2026 29/04/2026 |
The Counsel for the Appellant prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 29.04.2026 for hearing on Arguments/filing of written submission. | ||
| 67089 | 201/2018 | 7A | EPF Appeal | SRF Industrial Fabrics | APFC, Trichy |
24/12/2024 25/03/2025 24/06/2025 12/08/2025 23/10/2025 29/01/2026 29/04/2026 |
The Counsel for the Appellant prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 29.04.2026 for hearing on Arguments/filing of written submission. | ||
| 67090 | 210/2018 | 7A | EPF Appeal | Abhisami International P Ltd | APFC, Trichy |
25/10/2024 23/01/2025 24/04/2025 23/07/2025 19/09/2025 26/12/2025 03/02/2026 |
Spl Cpg Final Order- Appellant to remit PF contribution due to its employees which was assessed by Respondent u/s. 7A. Respondent is directed to identify employees whose entitlement can be proved with evidence & take steps to remit PF Contribution to A/ | ||
| 67091 | 210/2018 | 7A | EPF Appeal | Abhisami International P Ltd | APFC, Trichy |
25/10/2024 23/01/2025 24/04/2025 23/07/2025 19/09/2025 26/12/2025 03/02/2026 |
Spl Cpg Final Order- Appellant to remit PF contribution due to its employees which was assessed by Respondent u/s. 7A. Respondent is directed to identify employees whose entitlement can be proved with evidence & take steps to remit PF Contribution to A/ | ||
| 67092 | 210/2018 | 7A | EPF Appeal | Abhisami International P Ltd | APFC, Trichy |
25/10/2024 23/01/2025 24/04/2025 23/07/2025 19/09/2025 26/12/2025 03/02/2026 |
Spl Cpg Final Order- Appellant to remit PF contribution due to its employees which was assessed by Respondent u/s. 7A. Respondent is directed to identify employees whose entitlement can be proved with evidence & take steps to remit PF Contribution to A/ | ||
| 67093 | 210/2018 | 7A | EPF Appeal | Abhisami International P Ltd | APFC, Trichy |
25/10/2024 23/01/2025 24/04/2025 23/07/2025 19/09/2025 26/12/2025 03/02/2026 |
Spl Cpg Final Order- Appellant to remit PF contribution due to its employees which was assessed by Respondent u/s. 7A. Respondent is directed to identify employees whose entitlement can be proved with evidence & take steps to remit PF Contribution to A/ | ||
| 67094 | 210/2018 | 7A | EPF Appeal | Abhisami International P Ltd | APFC, Trichy |
25/10/2024 23/01/2025 24/04/2025 23/07/2025 19/09/2025 26/12/2025 03/02/2026 |
Spl Cpg Final Order- Appellant to remit PF contribution due to its employees which was assessed by Respondent u/s. 7A. Respondent is directed to identify employees whose entitlement can be proved with evidence & take steps to remit PF Contribution to A/ | ||
| 67095 | 210/2018 | 7A | EPF Appeal | Abhisami International P Ltd | APFC, Trichy |
25/10/2024 23/01/2025 24/04/2025 23/07/2025 19/09/2025 26/12/2025 03/02/2026 |
Spl Cpg Final Order- Appellant to remit PF contribution due to its employees which was assessed by Respondent u/s. 7A. Respondent is directed to identify employees whose entitlement can be proved with evidence & take steps to remit PF Contribution to A/ | ||
| 67096 | 210/2018 | 7A | EPF Appeal | Abhisami International P Ltd | APFC, Trichy |
25/10/2024 23/01/2025 24/04/2025 23/07/2025 19/09/2025 26/12/2025 03/02/2026 |
Spl Cpg Final Order- Appellant to remit PF contribution due to its employees which was assessed by Respondent u/s. 7A. Respondent is directed to identify employees whose entitlement can be proved with evidence & take steps to remit PF Contribution to A/ | ||
| 67097 | 115/2017 | 7A | EPF Appeal | Presidency Kid Leather Ltd. | RPFC, Chennai |
24/12/2024 25/03/2025 24/06/2025 12/08/2025 23/10/2025 29/01/2026 29/04/2026 |
The Counsel for the Appellant prays time for Arguments. Time granted. M/s. K. Prabhavathy, the Counsel on behalf of the Respondent filed the memo of appearance. Taken on record. List to 29.04.2026 for hearing on Arguments/filing of written submission. | ||
| 67098 | 115/2017 | 7A | EPF Appeal | Presidency Kid Leather Ltd. | RPFC, Chennai |
24/12/2024 25/03/2025 24/06/2025 12/08/2025 23/10/2025 29/01/2026 29/04/2026 |
The Counsel for the Appellant prays time for Arguments. Time granted. M/s. K. Prabhavathy, the Counsel on behalf of the Respondent filed the memo of appearance. Taken on record. List to 29.04.2026 for hearing on Arguments/filing of written submission. | ||
| 67099 | 115/2017 | 7A | EPF Appeal | Presidency Kid Leather Ltd. | RPFC, Chennai |
24/12/2024 25/03/2025 24/06/2025 12/08/2025 23/10/2025 29/01/2026 29/04/2026 |
The Counsel for the Appellant prays time for Arguments. Time granted. M/s. K. Prabhavathy, the Counsel on behalf of the Respondent filed the memo of appearance. Taken on record. List to 29.04.2026 for hearing on Arguments/filing of written submission. | ||
| 67100 | 115/2017 | 7A | EPF Appeal | Presidency Kid Leather Ltd. | RPFC, Chennai |
24/12/2024 25/03/2025 24/06/2025 12/08/2025 23/10/2025 29/01/2026 29/04/2026 |
The Counsel for the Appellant prays time for Arguments. Time granted. M/s. K. Prabhavathy, the Counsel on behalf of the Respondent filed the memo of appearance. Taken on record. List to 29.04.2026 for hearing on Arguments/filing of written submission. |