Cause List

E.g., 07/04/2026
S.No. Case No. Subject Case Type Name of Appellant Respondent Next Date Details Order / Decision Edit
49451 276/2019 14B-7Q EPF Appeal Power Pharmaceuticals Pvt. Ltd., APFC, Chennai 18/02/2020
22/04/2020
24/08/2020
24/12/2020
27/05/2021
08/11/2021
22/02/2022
16/03/2022
24/03/2022
31/03/2022
Final Orders - The Appeal stands dismissed.
49452 276/2019 14B-7Q EPF Appeal Power Pharmaceuticals Pvt. Ltd., APFC, Chennai 18/02/2020
22/04/2020
24/08/2020
24/12/2020
27/05/2021
08/11/2021
22/02/2022
16/03/2022
24/03/2022
31/03/2022
Final Orders - The Appeal stands dismissed.
49453 276/2019 14B-7Q EPF Appeal Power Pharmaceuticals Pvt. Ltd., APFC, Chennai 18/02/2020
22/04/2020
24/08/2020
24/12/2020
27/05/2021
08/11/2021
22/02/2022
16/03/2022
24/03/2022
31/03/2022
Final Orders - The Appeal stands dismissed.
49454 277/2019 14B EPF Appeal Shri Govindaraja Textiles pvt. Ltd. RPFC, Madurai 01/08/2025
21/08/2025
02/09/2025
28/11/2025
06/03/2026
02/04/2026
17/06/2026
None appeared on behalf of the Appellant. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 17.06.2026 for hearing on Arguments/filing of written submission.
49455 277/2019 14B EPF Appeal Shri Govindaraja Textiles pvt. Ltd. RPFC, Madurai 01/08/2025
21/08/2025
02/09/2025
28/11/2025
06/03/2026
02/04/2026
17/06/2026
None appeared on behalf of the Appellant. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 17.06.2026 for hearing on Arguments/filing of written submission.
49456 277/2019 14B EPF Appeal Shri Govindaraja Textiles pvt. Ltd. RPFC, Madurai 01/08/2025
21/08/2025
02/09/2025
28/11/2025
06/03/2026
02/04/2026
17/06/2026
None appeared on behalf of the Appellant. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 17.06.2026 for hearing on Arguments/filing of written submission.
49457 277/2019 14B EPF Appeal Shri Govindaraja Textiles pvt. Ltd. RPFC, Madurai 01/08/2025
21/08/2025
02/09/2025
28/11/2025
06/03/2026
02/04/2026
17/06/2026
None appeared on behalf of the Appellant. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 17.06.2026 for hearing on Arguments/filing of written submission.
49458 277/2019 14B EPF Appeal Shri Govindaraja Textiles pvt. Ltd. RPFC, Madurai 01/08/2025
21/08/2025
02/09/2025
28/11/2025
06/03/2026
02/04/2026
17/06/2026
None appeared on behalf of the Appellant. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 17.06.2026 for hearing on Arguments/filing of written submission.
49459 277/2019 14B EPF Appeal Shri Govindaraja Textiles pvt. Ltd. RPFC, Madurai 01/08/2025
21/08/2025
02/09/2025
28/11/2025
06/03/2026
02/04/2026
17/06/2026
None appeared on behalf of the Appellant. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 17.06.2026 for hearing on Arguments/filing of written submission.
49460 277/2019 14B EPF Appeal Shri Govindaraja Textiles pvt. Ltd. RPFC, Madurai 01/08/2025
21/08/2025
02/09/2025
28/11/2025
06/03/2026
02/04/2026
17/06/2026
None appeared on behalf of the Appellant. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 17.06.2026 for hearing on Arguments/filing of written submission.
49461 278/2019 14B EPF Appeal Raju Spinning Mills Pvt. Ltd., APFC, Madurai 09/08/2024
18/11/2024
25/02/2025
20/05/2025
18/08/2025
31/10/2025
23/02/2026
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 21.10.2019. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law
49462 278/2019 14B EPF Appeal Raju Spinning Mills Pvt. Ltd., APFC, Madurai 09/08/2024
18/11/2024
25/02/2025
20/05/2025
18/08/2025
31/10/2025
23/02/2026
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 21.10.2019. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law
49463 278/2019 14B EPF Appeal Raju Spinning Mills Pvt. Ltd., APFC, Madurai 09/08/2024
18/11/2024
25/02/2025
20/05/2025
18/08/2025
31/10/2025
23/02/2026
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 21.10.2019. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law
49464 278/2019 14B EPF Appeal Raju Spinning Mills Pvt. Ltd., APFC, Madurai 09/08/2024
18/11/2024
25/02/2025
20/05/2025
18/08/2025
31/10/2025
23/02/2026
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 21.10.2019. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law
49465 278/2019 14B EPF Appeal Raju Spinning Mills Pvt. Ltd., APFC, Madurai 09/08/2024
18/11/2024
25/02/2025
20/05/2025
18/08/2025
31/10/2025
23/02/2026
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 21.10.2019. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law
49466 278/2019 14B EPF Appeal Raju Spinning Mills Pvt. Ltd., APFC, Madurai 09/08/2024
18/11/2024
25/02/2025
20/05/2025
18/08/2025
31/10/2025
23/02/2026
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 21.10.2019. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law
49467 278/2019 14B EPF Appeal Raju Spinning Mills Pvt. Ltd., APFC, Madurai 09/08/2024
18/11/2024
25/02/2025
20/05/2025
18/08/2025
31/10/2025
23/02/2026
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 21.10.2019. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law
49468 279/2019 14B EPF Appeal Raju Spinning Mills APFC, Madurai 18/11/2024
25/02/2025
20/05/2025
18/08/2025
31/10/2025
23/02/2026
(Special Campaign) Final Order - Waived 32% of assessed amount passed by Respondent order dtd 21.10.2019. Respondent will recover remaining 68% of assessed amount from Appellant in accordance with law
49469 279/2019 14B EPF Appeal Raju Spinning Mills APFC, Madurai 18/11/2024
25/02/2025
20/05/2025
18/08/2025
31/10/2025
23/02/2026
(Special Campaign) Final Order - Waived 32% of assessed amount passed by Respondent order dtd 21.10.2019. Respondent will recover remaining 68% of assessed amount from Appellant in accordance with law
49470 279/2019 14B EPF Appeal Raju Spinning Mills APFC, Madurai 18/11/2024
25/02/2025
20/05/2025
18/08/2025
31/10/2025
23/02/2026
(Special Campaign) Final Order - Waived 32% of assessed amount passed by Respondent order dtd 21.10.2019. Respondent will recover remaining 68% of assessed amount from Appellant in accordance with law
49471 279/2019 14B EPF Appeal Raju Spinning Mills APFC, Madurai 18/11/2024
25/02/2025
20/05/2025
18/08/2025
31/10/2025
23/02/2026
(Special Campaign) Final Order - Waived 32% of assessed amount passed by Respondent order dtd 21.10.2019. Respondent will recover remaining 68% of assessed amount from Appellant in accordance with law
49472 279/2019 14B EPF Appeal Raju Spinning Mills APFC, Madurai 18/11/2024
25/02/2025
20/05/2025
18/08/2025
31/10/2025
23/02/2026
(Special Campaign) Final Order - Waived 32% of assessed amount passed by Respondent order dtd 21.10.2019. Respondent will recover remaining 68% of assessed amount from Appellant in accordance with law
49473 279/2019 14B EPF Appeal Raju Spinning Mills APFC, Madurai 18/11/2024
25/02/2025
20/05/2025
18/08/2025
31/10/2025
23/02/2026
(Special Campaign) Final Order - Waived 32% of assessed amount passed by Respondent order dtd 21.10.2019. Respondent will recover remaining 68% of assessed amount from Appellant in accordance with law
49474 280/2019 14B EPF Appeal Raju Spinning Mills Pvt. Ltd., APFC, Madurai 18/11/2024
25/02/2025
20/05/2025
18/08/2025
31/10/2025
23/02/2026
(Special Campaign) Final Order - Waived 32% of assessed amount passed by Respondent order dtd 21.10.2019. Respondent will recover remaining 68% of assessed amount from Appellant in accordance with law
49475 280/2019 14B EPF Appeal Raju Spinning Mills Pvt. Ltd., APFC, Madurai 18/11/2024
25/02/2025
20/05/2025
18/08/2025
31/10/2025
23/02/2026
(Special Campaign) Final Order - Waived 32% of assessed amount passed by Respondent order dtd 21.10.2019. Respondent will recover remaining 68% of assessed amount from Appellant in accordance with law
49476 280/2019 14B EPF Appeal Raju Spinning Mills Pvt. Ltd., APFC, Madurai 18/11/2024
25/02/2025
20/05/2025
18/08/2025
31/10/2025
23/02/2026
(Special Campaign) Final Order - Waived 32% of assessed amount passed by Respondent order dtd 21.10.2019. Respondent will recover remaining 68% of assessed amount from Appellant in accordance with law
49477 280/2019 14B EPF Appeal Raju Spinning Mills Pvt. Ltd., APFC, Madurai 18/11/2024
25/02/2025
20/05/2025
18/08/2025
31/10/2025
23/02/2026
(Special Campaign) Final Order - Waived 32% of assessed amount passed by Respondent order dtd 21.10.2019. Respondent will recover remaining 68% of assessed amount from Appellant in accordance with law
49478 280/2019 14B EPF Appeal Raju Spinning Mills Pvt. Ltd., APFC, Madurai 18/11/2024
25/02/2025
20/05/2025
18/08/2025
31/10/2025
23/02/2026
(Special Campaign) Final Order - Waived 32% of assessed amount passed by Respondent order dtd 21.10.2019. Respondent will recover remaining 68% of assessed amount from Appellant in accordance with law
49479 280/2019 14B EPF Appeal Raju Spinning Mills Pvt. Ltd., APFC, Madurai 18/11/2024
25/02/2025
20/05/2025
18/08/2025
31/10/2025
23/02/2026
(Special Campaign) Final Order - Waived 32% of assessed amount passed by Respondent order dtd 21.10.2019. Respondent will recover remaining 68% of assessed amount from Appellant in accordance with law
49480 282/2019 7A EPF Appeal SKM Animal Feeds and Food (India) Pvt., Ltd., RPFC-I, Salem 31/12/2024
18/02/2025
17/04/2025
06/06/2025
01/08/2025
13/08/2025
Final Order - The findings regarding transport allowance and HRA is set aside. The rest of the findings given by Respondent are confirmed. Respondent is directed to return the amount collected on basis of above mentioned two clauses.
49481 282/2019 7A EPF Appeal SKM Animal Feeds and Food (India) Pvt., Ltd., RPFC-I, Salem 31/12/2024
18/02/2025
17/04/2025
06/06/2025
01/08/2025
13/08/2025
Final Order - The findings regarding transport allowance and HRA is set aside. The rest of the findings given by Respondent are confirmed. Respondent is directed to return the amount collected on basis of above mentioned two clauses.
49482 282/2019 7A EPF Appeal SKM Animal Feeds and Food (India) Pvt., Ltd., RPFC-I, Salem 31/12/2024
18/02/2025
17/04/2025
06/06/2025
01/08/2025
13/08/2025
Final Order - The findings regarding transport allowance and HRA is set aside. The rest of the findings given by Respondent are confirmed. Respondent is directed to return the amount collected on basis of above mentioned two clauses.
49483 282/2019 7A EPF Appeal SKM Animal Feeds and Food (India) Pvt., Ltd., RPFC-I, Salem 31/12/2024
18/02/2025
17/04/2025
06/06/2025
01/08/2025
13/08/2025
Final Order - The findings regarding transport allowance and HRA is set aside. The rest of the findings given by Respondent are confirmed. Respondent is directed to return the amount collected on basis of above mentioned two clauses.
49484 282/2019 7A EPF Appeal SKM Animal Feeds and Food (India) Pvt., Ltd., RPFC-I, Salem 31/12/2024
18/02/2025
17/04/2025
06/06/2025
01/08/2025
13/08/2025
Final Order - The findings regarding transport allowance and HRA is set aside. The rest of the findings given by Respondent are confirmed. Respondent is directed to return the amount collected on basis of above mentioned two clauses.
49485 282/2019 7A EPF Appeal SKM Animal Feeds and Food (India) Pvt., Ltd., RPFC-I, Salem 31/12/2024
18/02/2025
17/04/2025
06/06/2025
01/08/2025
13/08/2025
Final Order - The findings regarding transport allowance and HRA is set aside. The rest of the findings given by Respondent are confirmed. Respondent is directed to return the amount collected on basis of above mentioned two clauses.
49486 283/2019 7A EPF Appeal Maduranthagam Municipality RPFC-I, Chennai 08/01/2025
09/04/2025
09/07/2025
04/09/2025
04/12/2025
12/03/2026
29/05/2026
None appeared on behalf of the Appellant and the Respondent. List to 12.03.2026 for hearing on Arguments/filing of written submission.
49487 283/2019 7A EPF Appeal Maduranthagam Municipality RPFC-I, Chennai 08/01/2025
09/04/2025
09/07/2025
04/09/2025
04/12/2025
12/03/2026
29/05/2026
None appeared on behalf of the Appellant and the Respondent. List to 12.03.2026 for hearing on Arguments/filing of written submission.
49488 283/2019 7A EPF Appeal Maduranthagam Municipality RPFC-I, Chennai 08/01/2025
09/04/2025
09/07/2025
04/09/2025
04/12/2025
12/03/2026
29/05/2026
None appeared on behalf of the Appellant and the Respondent. List to 12.03.2026 for hearing on Arguments/filing of written submission.
49489 283/2019 7A EPF Appeal Maduranthagam Municipality RPFC-I, Chennai 08/01/2025
09/04/2025
09/07/2025
04/09/2025
04/12/2025
12/03/2026
29/05/2026
None appeared on behalf of the Appellant and the Respondent. List to 12.03.2026 for hearing on Arguments/filing of written submission.
49490 283/2019 7A EPF Appeal Maduranthagam Municipality RPFC-I, Chennai 08/01/2025
09/04/2025
09/07/2025
04/09/2025
04/12/2025
12/03/2026
29/05/2026
None appeared on behalf of the Appellant and the Respondent. List to 12.03.2026 for hearing on Arguments/filing of written submission.
49491 283/2019 7A EPF Appeal Maduranthagam Municipality RPFC-I, Chennai 08/01/2025
09/04/2025
09/07/2025
04/09/2025
04/12/2025
12/03/2026
29/05/2026
None appeared on behalf of the Appellant and the Respondent. List to 12.03.2026 for hearing on Arguments/filing of written submission.
49492 283/2019 7A EPF Appeal Maduranthagam Municipality RPFC-I, Chennai 08/01/2025
09/04/2025
09/07/2025
04/09/2025
04/12/2025
12/03/2026
29/05/2026
None appeared on behalf of the Appellant and the Respondent. List to 12.03.2026 for hearing on Arguments/filing of written submission.
49493 284/2019 14B EPF Appeal Cotton Blossom (India) Pvt. Ltd. RPFC-II, Coimbatore 19/06/2024
20/09/2024
13/12/2024
13/03/2025
12/06/2025
01/07/2025
29/08/2025
26/11/2025
04/03/2026
Final Order - Waived 35% of assessed amount passed by Respondent order dtd __.11.2019. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law
49494 284/2019 14B EPF Appeal Cotton Blossom (India) Pvt. Ltd. RPFC-II, Coimbatore 19/06/2024
20/09/2024
13/12/2024
13/03/2025
12/06/2025
01/07/2025
29/08/2025
26/11/2025
04/03/2026
Final Order - Waived 35% of assessed amount passed by Respondent order dtd __.11.2019. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law
49495 284/2019 14B EPF Appeal Cotton Blossom (India) Pvt. Ltd. RPFC-II, Coimbatore 19/06/2024
20/09/2024
13/12/2024
13/03/2025
12/06/2025
01/07/2025
29/08/2025
26/11/2025
04/03/2026
Final Order - Waived 35% of assessed amount passed by Respondent order dtd __.11.2019. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law
49496 284/2019 14B EPF Appeal Cotton Blossom (India) Pvt. Ltd. RPFC-II, Coimbatore 19/06/2024
20/09/2024
13/12/2024
13/03/2025
12/06/2025
01/07/2025
29/08/2025
26/11/2025
04/03/2026
Final Order - Waived 35% of assessed amount passed by Respondent order dtd __.11.2019. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law
49497 284/2019 14B EPF Appeal Cotton Blossom (India) Pvt. Ltd. RPFC-II, Coimbatore 19/06/2024
20/09/2024
13/12/2024
13/03/2025
12/06/2025
01/07/2025
29/08/2025
26/11/2025
04/03/2026
Final Order - Waived 35% of assessed amount passed by Respondent order dtd __.11.2019. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law
49498 284/2019 14B EPF Appeal Cotton Blossom (India) Pvt. Ltd. RPFC-II, Coimbatore 19/06/2024
20/09/2024
13/12/2024
13/03/2025
12/06/2025
01/07/2025
29/08/2025
26/11/2025
04/03/2026
Final Order - Waived 35% of assessed amount passed by Respondent order dtd __.11.2019. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law
49499 284/2019 14B EPF Appeal Cotton Blossom (India) Pvt. Ltd. RPFC-II, Coimbatore 19/06/2024
20/09/2024
13/12/2024
13/03/2025
12/06/2025
01/07/2025
29/08/2025
26/11/2025
04/03/2026
Final Order - Waived 35% of assessed amount passed by Respondent order dtd __.11.2019. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law
49500 284/2019 14B EPF Appeal Cotton Blossom (India) Pvt. Ltd. RPFC-II, Coimbatore 19/06/2024
20/09/2024
13/12/2024
13/03/2025
12/06/2025
01/07/2025
29/08/2025
26/11/2025
04/03/2026
Final Order - Waived 35% of assessed amount passed by Respondent order dtd __.11.2019. Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law

Pages