| S.No. | Case No. | Subject | Case Type | Name of Appellant | Respondent | Next Date | Details | Order / Decision | Edit |
|---|---|---|---|---|---|---|---|---|---|
| 58351 | 121/2018 | 14B | EPF Appeal | NEPC Tea Garden Unit-II | APFC, Coimbatore |
24/07/2024 04/11/2024 10/02/2025 05/05/2025 25/07/2025 25/09/2025 01/01/2026 04/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 58352 | 121/2018 | 14B | EPF Appeal | NEPC Tea Garden Unit-II | APFC, Coimbatore |
24/07/2024 04/11/2024 10/02/2025 05/05/2025 25/07/2025 25/09/2025 01/01/2026 04/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 58353 | 121/2018 | 14B | EPF Appeal | NEPC Tea Garden Unit-II | APFC, Coimbatore |
24/07/2024 04/11/2024 10/02/2025 05/05/2025 25/07/2025 25/09/2025 01/01/2026 04/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 58354 | 121/2018 | 14B | EPF Appeal | NEPC Tea Garden Unit-II | APFC, Coimbatore |
24/07/2024 04/11/2024 10/02/2025 05/05/2025 25/07/2025 25/09/2025 01/01/2026 04/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 58355 | 121/2018 | 14B | EPF Appeal | NEPC Tea Garden Unit-II | APFC, Coimbatore |
24/07/2024 04/11/2024 10/02/2025 05/05/2025 25/07/2025 25/09/2025 01/01/2026 04/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 58356 | 121/2018 | 14B | EPF Appeal | NEPC Tea Garden Unit-II | APFC, Coimbatore |
24/07/2024 04/11/2024 10/02/2025 05/05/2025 25/07/2025 25/09/2025 01/01/2026 04/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 58357 | 121/2018 | 14B | EPF Appeal | NEPC Tea Garden Unit-II | APFC, Coimbatore |
24/07/2024 04/11/2024 10/02/2025 05/05/2025 25/07/2025 25/09/2025 01/01/2026 04/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 58358 | 121/2018 | 14B | EPF Appeal | NEPC Tea Garden Unit-II | APFC, Coimbatore |
24/07/2024 04/11/2024 10/02/2025 05/05/2025 25/07/2025 25/09/2025 01/01/2026 04/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 58359 | 122/2018 | 14B | EPF Appeal | Pudukottai Security Services | APFC, Trichy |
26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 09/10/2025 08/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 58360 | 122/2018 | 14B | EPF Appeal | Pudukottai Security Services | APFC, Trichy |
26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 09/10/2025 08/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 58361 | 122/2018 | 14B | EPF Appeal | Pudukottai Security Services | APFC, Trichy |
26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 09/10/2025 08/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 58362 | 122/2018 | 14B | EPF Appeal | Pudukottai Security Services | APFC, Trichy |
26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 09/10/2025 08/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 58363 | 122/2018 | 14B | EPF Appeal | Pudukottai Security Services | APFC, Trichy |
26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 09/10/2025 08/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 58364 | 122/2018 | 14B | EPF Appeal | Pudukottai Security Services | APFC, Trichy |
26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 09/10/2025 08/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 58365 | 122/2018 | 14B | EPF Appeal | Pudukottai Security Services | APFC, Trichy |
26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 09/10/2025 08/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 58366 | 122/2018 | 14B | EPF Appeal | Pudukottai Security Services | APFC, Trichy |
26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 09/10/2025 08/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 58367 | 122/2018 | 14B | EPF Appeal | Pudukottai Security Services | APFC, Trichy |
26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 09/10/2025 08/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 58368 | 123/2018 | 14B | EPF Appeal | Chengalvarayan Coop. Sugar Mills Ltd., | APFC, Trichy |
09/12/2024 21/01/2025 23/04/2025 22/07/2025 17/09/2025 10/10/2025 |
Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of assessed damages amount. | ||
| 58369 | 123/2018 | 14B | EPF Appeal | Chengalvarayan Coop. Sugar Mills Ltd., | APFC, Trichy |
09/12/2024 21/01/2025 23/04/2025 22/07/2025 17/09/2025 10/10/2025 |
Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of assessed damages amount. | ||
| 58370 | 123/2018 | 14B | EPF Appeal | Chengalvarayan Coop. Sugar Mills Ltd., | APFC, Trichy |
09/12/2024 21/01/2025 23/04/2025 22/07/2025 17/09/2025 10/10/2025 |
Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of assessed damages amount. | ||
| 58371 | 123/2018 | 14B | EPF Appeal | Chengalvarayan Coop. Sugar Mills Ltd., | APFC, Trichy |
09/12/2024 21/01/2025 23/04/2025 22/07/2025 17/09/2025 10/10/2025 |
Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of assessed damages amount. | ||
| 58372 | 123/2018 | 14B | EPF Appeal | Chengalvarayan Coop. Sugar Mills Ltd., | APFC, Trichy |
09/12/2024 21/01/2025 23/04/2025 22/07/2025 17/09/2025 10/10/2025 |
Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of assessed damages amount. | ||
| 58373 | 123/2018 | 14B | EPF Appeal | Chengalvarayan Coop. Sugar Mills Ltd., | APFC, Trichy |
09/12/2024 21/01/2025 23/04/2025 22/07/2025 17/09/2025 10/10/2025 |
Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of assessed damages amount. | ||
| 58374 | 124/2018 | 7A | EPF Appeal | Agaran Primo Technologies (I) Pvt. Ltd. | APFC, Coimbatore |
26/08/2021 24/09/2021 22/10/2021 05/11/2021 11/11/2021 25/11/2021 24/12/2021 28/12/2021 12/01/2022 27/03/2023 |
Final Orders- The Appeal stands dismissed. Appellant is directed to remit dues determined for recovery under 7A dtd. 07.11.2017 before the Respondent on or before 3 months from the date of receipt of the order | ||
| 58375 | 124/2018 | 7A | EPF Appeal | Agaran Primo Technologies (I) Pvt. Ltd. | APFC, Coimbatore |
26/08/2021 24/09/2021 22/10/2021 05/11/2021 11/11/2021 25/11/2021 24/12/2021 28/12/2021 12/01/2022 27/03/2023 |
Final Orders- The Appeal stands dismissed. Appellant is directed to remit dues determined for recovery under 7A dtd. 07.11.2017 before the Respondent on or before 3 months from the date of receipt of the order | ||
| 58376 | 124/2018 | 7A | EPF Appeal | Agaran Primo Technologies (I) Pvt. Ltd. | APFC, Coimbatore |
26/08/2021 24/09/2021 22/10/2021 05/11/2021 11/11/2021 25/11/2021 24/12/2021 28/12/2021 12/01/2022 27/03/2023 |
Final Orders- The Appeal stands dismissed. Appellant is directed to remit dues determined for recovery under 7A dtd. 07.11.2017 before the Respondent on or before 3 months from the date of receipt of the order | ||
| 58377 | 124/2018 | 7A | EPF Appeal | Agaran Primo Technologies (I) Pvt. Ltd. | APFC, Coimbatore |
26/08/2021 24/09/2021 22/10/2021 05/11/2021 11/11/2021 25/11/2021 24/12/2021 28/12/2021 12/01/2022 27/03/2023 |
Final Orders- The Appeal stands dismissed. Appellant is directed to remit dues determined for recovery under 7A dtd. 07.11.2017 before the Respondent on or before 3 months from the date of receipt of the order | ||
| 58378 | 124/2018 | 7A | EPF Appeal | Agaran Primo Technologies (I) Pvt. Ltd. | APFC, Coimbatore |
26/08/2021 24/09/2021 22/10/2021 05/11/2021 11/11/2021 25/11/2021 24/12/2021 28/12/2021 12/01/2022 27/03/2023 |
Final Orders- The Appeal stands dismissed. Appellant is directed to remit dues determined for recovery under 7A dtd. 07.11.2017 before the Respondent on or before 3 months from the date of receipt of the order | ||
| 58379 | 124/2018 | 7A | EPF Appeal | Agaran Primo Technologies (I) Pvt. Ltd. | APFC, Coimbatore |
26/08/2021 24/09/2021 22/10/2021 05/11/2021 11/11/2021 25/11/2021 24/12/2021 28/12/2021 12/01/2022 27/03/2023 |
Final Orders- The Appeal stands dismissed. Appellant is directed to remit dues determined for recovery under 7A dtd. 07.11.2017 before the Respondent on or before 3 months from the date of receipt of the order | ||
| 58380 | 124/2018 | 7A | EPF Appeal | Agaran Primo Technologies (I) Pvt. Ltd. | APFC, Coimbatore |
26/08/2021 24/09/2021 22/10/2021 05/11/2021 11/11/2021 25/11/2021 24/12/2021 28/12/2021 12/01/2022 27/03/2023 |
Final Orders- The Appeal stands dismissed. Appellant is directed to remit dues determined for recovery under 7A dtd. 07.11.2017 before the Respondent on or before 3 months from the date of receipt of the order | ||
| 58381 | 124/2018 | 7A | EPF Appeal | Agaran Primo Technologies (I) Pvt. Ltd. | APFC, Coimbatore |
26/08/2021 24/09/2021 22/10/2021 05/11/2021 11/11/2021 25/11/2021 24/12/2021 28/12/2021 12/01/2022 27/03/2023 |
Final Orders- The Appeal stands dismissed. Appellant is directed to remit dues determined for recovery under 7A dtd. 07.11.2017 before the Respondent on or before 3 months from the date of receipt of the order | ||
| 58382 | 124/2018 | 7A | EPF Appeal | Agaran Primo Technologies (I) Pvt. Ltd. | APFC, Coimbatore |
26/08/2021 24/09/2021 22/10/2021 05/11/2021 11/11/2021 25/11/2021 24/12/2021 28/12/2021 12/01/2022 27/03/2023 |
Final Orders- The Appeal stands dismissed. Appellant is directed to remit dues determined for recovery under 7A dtd. 07.11.2017 before the Respondent on or before 3 months from the date of receipt of the order | ||
| 58383 | 124/2018 | 7A | EPF Appeal | Agaran Primo Technologies (I) Pvt. Ltd. | APFC, Coimbatore |
26/08/2021 24/09/2021 22/10/2021 05/11/2021 11/11/2021 25/11/2021 24/12/2021 28/12/2021 12/01/2022 27/03/2023 |
Final Orders- The Appeal stands dismissed. Appellant is directed to remit dues determined for recovery under 7A dtd. 07.11.2017 before the Respondent on or before 3 months from the date of receipt of the order | ||
| 58384 | 130/2018 | 7A | EPF Appeal | Reshmi Industries (India) Pvt. Ltd., | APFC, Coimbatore |
10/02/2025 05/05/2025 25/07/2025 25/09/2025 01/01/2026 10/04/2026 19/06/2026 27/08/2026 |
None appeared on behalf of the Appellant and the Respondent. List to 27.08.2026 for hearing on Arguments/filing of written submission. | ||
| 58385 | 130/2018 | 7A | EPF Appeal | Reshmi Industries (India) Pvt. Ltd., | APFC, Coimbatore |
10/02/2025 05/05/2025 25/07/2025 25/09/2025 01/01/2026 10/04/2026 19/06/2026 27/08/2026 |
None appeared on behalf of the Appellant and the Respondent. List to 27.08.2026 for hearing on Arguments/filing of written submission. | ||
| 58386 | 130/2018 | 7A | EPF Appeal | Reshmi Industries (India) Pvt. Ltd., | APFC, Coimbatore |
10/02/2025 05/05/2025 25/07/2025 25/09/2025 01/01/2026 10/04/2026 19/06/2026 27/08/2026 |
None appeared on behalf of the Appellant and the Respondent. List to 27.08.2026 for hearing on Arguments/filing of written submission. | ||
| 58387 | 130/2018 | 7A | EPF Appeal | Reshmi Industries (India) Pvt. Ltd., | APFC, Coimbatore |
10/02/2025 05/05/2025 25/07/2025 25/09/2025 01/01/2026 10/04/2026 19/06/2026 27/08/2026 |
None appeared on behalf of the Appellant and the Respondent. List to 27.08.2026 for hearing on Arguments/filing of written submission. | ||
| 58388 | 130/2018 | 7A | EPF Appeal | Reshmi Industries (India) Pvt. Ltd., | APFC, Coimbatore |
10/02/2025 05/05/2025 25/07/2025 25/09/2025 01/01/2026 10/04/2026 19/06/2026 27/08/2026 |
None appeared on behalf of the Appellant and the Respondent. List to 27.08.2026 for hearing on Arguments/filing of written submission. | ||
| 58389 | 130/2018 | 7A | EPF Appeal | Reshmi Industries (India) Pvt. Ltd., | APFC, Coimbatore |
10/02/2025 05/05/2025 25/07/2025 25/09/2025 01/01/2026 10/04/2026 19/06/2026 27/08/2026 |
None appeared on behalf of the Appellant and the Respondent. List to 27.08.2026 for hearing on Arguments/filing of written submission. | ||
| 58390 | 130/2018 | 7A | EPF Appeal | Reshmi Industries (India) Pvt. Ltd., | APFC, Coimbatore |
10/02/2025 05/05/2025 25/07/2025 25/09/2025 01/01/2026 10/04/2026 19/06/2026 27/08/2026 |
None appeared on behalf of the Appellant and the Respondent. List to 27.08.2026 for hearing on Arguments/filing of written submission. | ||
| 58391 | 130/2018 | 7A | EPF Appeal | Reshmi Industries (India) Pvt. Ltd., | APFC, Coimbatore |
10/02/2025 05/05/2025 25/07/2025 25/09/2025 01/01/2026 10/04/2026 19/06/2026 27/08/2026 |
None appeared on behalf of the Appellant and the Respondent. List to 27.08.2026 for hearing on Arguments/filing of written submission. | ||
| 58392 | 132/2018 | 14B-7Q | EPF Appeal | K. Sivasubramaniam Spinners Pvt. Ltd. | RPFC, Coimbatore |
30/12/2024 28/03/2025 27/06/2025 28/08/2025 21/11/2025 27/02/2026 20/05/2026 07/08/2026 |
None appeared on behalf of the Appellant. The Representative Counsel on behalf of the Respondent is present. List to 07.08.2026 for hearing on Arguments/filing of written submission. | ||
| 58393 | 132/2018 | 14B-7Q | EPF Appeal | K. Sivasubramaniam Spinners Pvt. Ltd. | RPFC, Coimbatore |
30/12/2024 28/03/2025 27/06/2025 28/08/2025 21/11/2025 27/02/2026 20/05/2026 07/08/2026 |
None appeared on behalf of the Appellant. The Representative Counsel on behalf of the Respondent is present. List to 07.08.2026 for hearing on Arguments/filing of written submission. | ||
| 58394 | 132/2018 | 14B-7Q | EPF Appeal | K. Sivasubramaniam Spinners Pvt. Ltd. | RPFC, Coimbatore |
30/12/2024 28/03/2025 27/06/2025 28/08/2025 21/11/2025 27/02/2026 20/05/2026 07/08/2026 |
None appeared on behalf of the Appellant. The Representative Counsel on behalf of the Respondent is present. List to 07.08.2026 for hearing on Arguments/filing of written submission. | ||
| 58395 | 132/2018 | 14B-7Q | EPF Appeal | K. Sivasubramaniam Spinners Pvt. Ltd. | RPFC, Coimbatore |
30/12/2024 28/03/2025 27/06/2025 28/08/2025 21/11/2025 27/02/2026 20/05/2026 07/08/2026 |
None appeared on behalf of the Appellant. The Representative Counsel on behalf of the Respondent is present. List to 07.08.2026 for hearing on Arguments/filing of written submission. | ||
| 58396 | 132/2018 | 14B-7Q | EPF Appeal | K. Sivasubramaniam Spinners Pvt. Ltd. | RPFC, Coimbatore |
30/12/2024 28/03/2025 27/06/2025 28/08/2025 21/11/2025 27/02/2026 20/05/2026 07/08/2026 |
None appeared on behalf of the Appellant. The Representative Counsel on behalf of the Respondent is present. List to 07.08.2026 for hearing on Arguments/filing of written submission. | ||
| 58397 | 132/2018 | 14B-7Q | EPF Appeal | K. Sivasubramaniam Spinners Pvt. Ltd. | RPFC, Coimbatore |
30/12/2024 28/03/2025 27/06/2025 28/08/2025 21/11/2025 27/02/2026 20/05/2026 07/08/2026 |
None appeared on behalf of the Appellant. The Representative Counsel on behalf of the Respondent is present. List to 07.08.2026 for hearing on Arguments/filing of written submission. | ||
| 58398 | 132/2018 | 14B-7Q | EPF Appeal | K. Sivasubramaniam Spinners Pvt. Ltd. | RPFC, Coimbatore |
30/12/2024 28/03/2025 27/06/2025 28/08/2025 21/11/2025 27/02/2026 20/05/2026 07/08/2026 |
None appeared on behalf of the Appellant. The Representative Counsel on behalf of the Respondent is present. List to 07.08.2026 for hearing on Arguments/filing of written submission. | ||
| 58399 | 132/2018 | 14B-7Q | EPF Appeal | K. Sivasubramaniam Spinners Pvt. Ltd. | RPFC, Coimbatore |
30/12/2024 28/03/2025 27/06/2025 28/08/2025 21/11/2025 27/02/2026 20/05/2026 07/08/2026 |
None appeared on behalf of the Appellant. The Representative Counsel on behalf of the Respondent is present. List to 07.08.2026 for hearing on Arguments/filing of written submission. | ||
| 58400 | EPF 219/2017 | Section 14B | EPF Appeal | Indus Fila Ltd., | RPFC, Peenya | Closed |