72451 501/2018 14B-7Q EPF Appeal SSCM International Impex Pvt Ltd. APFC, Salem 30/01/2025
21/03/2025
26/05/2025
14/07/2025
11/09/2025
14/08/2025
(Camp)Final Order - The Appeal is dismissed.
72452 500/2018 7A EPF Appeal Novateur Electrical and Digital Systems Pvt Ltd APFC, Chennai 22/01/2025
23/04/2025
22/07/2025
17/09/2025
24/12/2025
27/03/2026
11/06/2026
20/08/2026
M/s. Haroon Al Rasheed, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. R. Vishnu, the learned Counsel on behalf of the Respondent is present. List to 20.08.2026 for hearing on Arguments/filing of written submission.
72453 500/2018 7A EPF Appeal Novateur Electrical and Digital Systems Pvt Ltd APFC, Chennai 22/01/2025
23/04/2025
22/07/2025
17/09/2025
24/12/2025
27/03/2026
11/06/2026
20/08/2026
M/s. Haroon Al Rasheed, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. R. Vishnu, the learned Counsel on behalf of the Respondent is present. List to 20.08.2026 for hearing on Arguments/filing of written submission.
72454 500/2018 7A EPF Appeal Novateur Electrical and Digital Systems Pvt Ltd APFC, Chennai 22/01/2025
23/04/2025
22/07/2025
17/09/2025
24/12/2025
27/03/2026
11/06/2026
20/08/2026
M/s. Haroon Al Rasheed, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. R. Vishnu, the learned Counsel on behalf of the Respondent is present. List to 20.08.2026 for hearing on Arguments/filing of written submission.
72455 500/2018 7A EPF Appeal Novateur Electrical and Digital Systems Pvt Ltd APFC, Chennai 22/01/2025
23/04/2025
22/07/2025
17/09/2025
24/12/2025
27/03/2026
11/06/2026
20/08/2026
M/s. Haroon Al Rasheed, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. R. Vishnu, the learned Counsel on behalf of the Respondent is present. List to 20.08.2026 for hearing on Arguments/filing of written submission.
72456 500/2018 7A EPF Appeal Novateur Electrical and Digital Systems Pvt Ltd APFC, Chennai 22/01/2025
23/04/2025
22/07/2025
17/09/2025
24/12/2025
27/03/2026
11/06/2026
20/08/2026
M/s. Haroon Al Rasheed, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. R. Vishnu, the learned Counsel on behalf of the Respondent is present. List to 20.08.2026 for hearing on Arguments/filing of written submission.
72457 500/2018 7A EPF Appeal Novateur Electrical and Digital Systems Pvt Ltd APFC, Chennai 22/01/2025
23/04/2025
22/07/2025
17/09/2025
24/12/2025
27/03/2026
11/06/2026
20/08/2026
M/s. Haroon Al Rasheed, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. R. Vishnu, the learned Counsel on behalf of the Respondent is present. List to 20.08.2026 for hearing on Arguments/filing of written submission.
72458 500/2018 7A EPF Appeal Novateur Electrical and Digital Systems Pvt Ltd APFC, Chennai 22/01/2025
23/04/2025
22/07/2025
17/09/2025
24/12/2025
27/03/2026
11/06/2026
20/08/2026
M/s. Haroon Al Rasheed, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. R. Vishnu, the learned Counsel on behalf of the Respondent is present. List to 20.08.2026 for hearing on Arguments/filing of written submission.
72459 500/2018 7A EPF Appeal Novateur Electrical and Digital Systems Pvt Ltd APFC, Chennai 22/01/2025
23/04/2025
22/07/2025
17/09/2025
24/12/2025
27/03/2026
11/06/2026
20/08/2026
M/s. Haroon Al Rasheed, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. R. Vishnu, the learned Counsel on behalf of the Respondent is present. List to 20.08.2026 for hearing on Arguments/filing of written submission.
72460 499/2018 14B-7Q EPF Appeal Thangavelur Textile Mills APFC, Salem 23/01/2025
24/04/2025
23/07/2025
19/09/2025
14/08/2025
(Camp)Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of the damages amount.
72461 499/2018 14B-7Q EPF Appeal Thangavelur Textile Mills APFC, Salem 23/01/2025
24/04/2025
23/07/2025
19/09/2025
14/08/2025
(Camp)Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of the damages amount.
72462 499/2018 14B-7Q EPF Appeal Thangavelur Textile Mills APFC, Salem 23/01/2025
24/04/2025
23/07/2025
19/09/2025
14/08/2025
(Camp)Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of the damages amount.
72463 499/2018 14B-7Q EPF Appeal Thangavelur Textile Mills APFC, Salem 23/01/2025
24/04/2025
23/07/2025
19/09/2025
14/08/2025
(Camp)Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of the damages amount.
72464 499/2018 14B-7Q EPF Appeal Thangavelur Textile Mills APFC, Salem 23/01/2025
24/04/2025
23/07/2025
19/09/2025
14/08/2025
(Camp)Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of the damages amount.
72465 498/2018 14B-7Q EPF Appeal Pavendhar Bharathidasan Engineering and Technology APFC, Trichy 26/03/2025
25/06/2025
25/08/2025
14/11/2025
20/02/2026
24/02/2026
26/02/2026
(Special Campaign) Final Order - Waived 32% of assessed amount passed by Respondent order dtd 24.11.2025 Respondent will recover remaining 68% of assessed amount from Appellant in accordance with law. The Appeal challenging order u/s. 7Q is not maintaibal
72466 498/2018 14B-7Q EPF Appeal Pavendhar Bharathidasan Engineering and Technology APFC, Trichy 26/03/2025
25/06/2025
25/08/2025
14/11/2025
20/02/2026
24/02/2026
26/02/2026
(Special Campaign) Final Order - Waived 32% of assessed amount passed by Respondent order dtd 24.11.2025 Respondent will recover remaining 68% of assessed amount from Appellant in accordance with law. The Appeal challenging order u/s. 7Q is not maintaibal
72467 498/2018 14B-7Q EPF Appeal Pavendhar Bharathidasan Engineering and Technology APFC, Trichy 26/03/2025
25/06/2025
25/08/2025
14/11/2025
20/02/2026
24/02/2026
26/02/2026
(Special Campaign) Final Order - Waived 32% of assessed amount passed by Respondent order dtd 24.11.2025 Respondent will recover remaining 68% of assessed amount from Appellant in accordance with law. The Appeal challenging order u/s. 7Q is not maintaibal
72468 498/2018 14B-7Q EPF Appeal Pavendhar Bharathidasan Engineering and Technology APFC, Trichy 26/03/2025
25/06/2025
25/08/2025
14/11/2025
20/02/2026
24/02/2026
26/02/2026
(Special Campaign) Final Order - Waived 32% of assessed amount passed by Respondent order dtd 24.11.2025 Respondent will recover remaining 68% of assessed amount from Appellant in accordance with law. The Appeal challenging order u/s. 7Q is not maintaibal
72469 498/2018 14B-7Q EPF Appeal Pavendhar Bharathidasan Engineering and Technology APFC, Trichy 26/03/2025
25/06/2025
25/08/2025
14/11/2025
20/02/2026
24/02/2026
26/02/2026
(Special Campaign) Final Order - Waived 32% of assessed amount passed by Respondent order dtd 24.11.2025 Respondent will recover remaining 68% of assessed amount from Appellant in accordance with law. The Appeal challenging order u/s. 7Q is not maintaibal
72470 498/2018 14B-7Q EPF Appeal Pavendhar Bharathidasan Engineering and Technology APFC, Trichy 26/03/2025
25/06/2025
25/08/2025
14/11/2025
20/02/2026
24/02/2026
26/02/2026
(Special Campaign) Final Order - Waived 32% of assessed amount passed by Respondent order dtd 24.11.2025 Respondent will recover remaining 68% of assessed amount from Appellant in accordance with law. The Appeal challenging order u/s. 7Q is not maintaibal
72471 498/2018 14B-7Q EPF Appeal Pavendhar Bharathidasan Engineering and Technology APFC, Trichy 26/03/2025
25/06/2025
25/08/2025
14/11/2025
20/02/2026
24/02/2026
26/02/2026
(Special Campaign) Final Order - Waived 32% of assessed amount passed by Respondent order dtd 24.11.2025 Respondent will recover remaining 68% of assessed amount from Appellant in accordance with law. The Appeal challenging order u/s. 7Q is not maintaibal
72472 497/2018 7A EPF Appeal Pavendhar Bharathidasan Engineering and Technology RPFC, Trichy 26/04/2019
26/09/2019
04/10/2019
01/11/2019
22/01/2020
23/01/2020
31/01/2020
Final Order - The appeal stands dismissed.
72473 497/2018 7A EPF Appeal Pavendhar Bharathidasan Engineering and Technology RPFC, Trichy 26/04/2019
26/09/2019
04/10/2019
01/11/2019
22/01/2020
23/01/2020
31/01/2020
Final Order - The appeal stands dismissed.
72474 497/2018 7A EPF Appeal Pavendhar Bharathidasan Engineering and Technology RPFC, Trichy 26/04/2019
26/09/2019
04/10/2019
01/11/2019
22/01/2020
23/01/2020
31/01/2020
Final Order - The appeal stands dismissed.
72475 497/2018 7A EPF Appeal Pavendhar Bharathidasan Engineering and Technology RPFC, Trichy 26/04/2019
26/09/2019
04/10/2019
01/11/2019
22/01/2020
23/01/2020
31/01/2020
Final Order - The appeal stands dismissed.
72476 497/2018 7A EPF Appeal Pavendhar Bharathidasan Engineering and Technology RPFC, Trichy 26/04/2019
26/09/2019
04/10/2019
01/11/2019
22/01/2020
23/01/2020
31/01/2020
Final Order - The appeal stands dismissed.
72477 497/2018 7A EPF Appeal Pavendhar Bharathidasan Engineering and Technology RPFC, Trichy 26/04/2019
26/09/2019
04/10/2019
01/11/2019
22/01/2020
23/01/2020
31/01/2020
Final Order - The appeal stands dismissed.
72478 497/2018 7A EPF Appeal Pavendhar Bharathidasan Engineering and Technology RPFC, Trichy 26/04/2019
26/09/2019
04/10/2019
01/11/2019
22/01/2020
23/01/2020
31/01/2020
Final Order - The appeal stands dismissed.
72479 496/2018 14B-7Q EPF Appeal Malar Energy and Infrastructure Pvt. Ltd. RPFC, Trichy 18/06/2024
25/09/2024
26/12/2024
26/03/2025
25/06/2025
25/08/2025
14/11/2025
20/02/2026
24/02/2026
26/02/2026
(Special Campaign) Final Order - Waived 30% of assessed amount passed by Respondent order dtd 28.09.2015 Respondent will recover remaining 70% of assessed amount from Appellant in accordance with law. The Appeal filed u/s. 7Q is not maintainable.
72480 496/2018 14B-7Q EPF Appeal Malar Energy and Infrastructure Pvt. Ltd. RPFC, Trichy 18/06/2024
25/09/2024
26/12/2024
26/03/2025
25/06/2025
25/08/2025
14/11/2025
20/02/2026
24/02/2026
26/02/2026
(Special Campaign) Final Order - Waived 30% of assessed amount passed by Respondent order dtd 28.09.2015 Respondent will recover remaining 70% of assessed amount from Appellant in accordance with law. The Appeal filed u/s. 7Q is not maintainable.
72481 496/2018 14B-7Q EPF Appeal Malar Energy and Infrastructure Pvt. Ltd. RPFC, Trichy 18/06/2024
25/09/2024
26/12/2024
26/03/2025
25/06/2025
25/08/2025
14/11/2025
20/02/2026
24/02/2026
26/02/2026
(Special Campaign) Final Order - Waived 30% of assessed amount passed by Respondent order dtd 28.09.2015 Respondent will recover remaining 70% of assessed amount from Appellant in accordance with law. The Appeal filed u/s. 7Q is not maintainable.
72482 496/2018 14B-7Q EPF Appeal Malar Energy and Infrastructure Pvt. Ltd. RPFC, Trichy 18/06/2024
25/09/2024
26/12/2024
26/03/2025
25/06/2025
25/08/2025
14/11/2025
20/02/2026
24/02/2026
26/02/2026
(Special Campaign) Final Order - Waived 30% of assessed amount passed by Respondent order dtd 28.09.2015 Respondent will recover remaining 70% of assessed amount from Appellant in accordance with law. The Appeal filed u/s. 7Q is not maintainable.
72483 496/2018 14B-7Q EPF Appeal Malar Energy and Infrastructure Pvt. Ltd. RPFC, Trichy 18/06/2024
25/09/2024
26/12/2024
26/03/2025
25/06/2025
25/08/2025
14/11/2025
20/02/2026
24/02/2026
26/02/2026
(Special Campaign) Final Order - Waived 30% of assessed amount passed by Respondent order dtd 28.09.2015 Respondent will recover remaining 70% of assessed amount from Appellant in accordance with law. The Appeal filed u/s. 7Q is not maintainable.
72484 496/2018 14B-7Q EPF Appeal Malar Energy and Infrastructure Pvt. Ltd. RPFC, Trichy 18/06/2024
25/09/2024
26/12/2024
26/03/2025
25/06/2025
25/08/2025
14/11/2025
20/02/2026
24/02/2026
26/02/2026
(Special Campaign) Final Order - Waived 30% of assessed amount passed by Respondent order dtd 28.09.2015 Respondent will recover remaining 70% of assessed amount from Appellant in accordance with law. The Appeal filed u/s. 7Q is not maintainable.
72485 496/2018 14B-7Q EPF Appeal Malar Energy and Infrastructure Pvt. Ltd. RPFC, Trichy 18/06/2024
25/09/2024
26/12/2024
26/03/2025
25/06/2025
25/08/2025
14/11/2025
20/02/2026
24/02/2026
26/02/2026
(Special Campaign) Final Order - Waived 30% of assessed amount passed by Respondent order dtd 28.09.2015 Respondent will recover remaining 70% of assessed amount from Appellant in accordance with law. The Appeal filed u/s. 7Q is not maintainable.
72486 496/2018 14B-7Q EPF Appeal Malar Energy and Infrastructure Pvt. Ltd. RPFC, Trichy 18/06/2024
25/09/2024
26/12/2024
26/03/2025
25/06/2025
25/08/2025
14/11/2025
20/02/2026
24/02/2026
26/02/2026
(Special Campaign) Final Order - Waived 30% of assessed amount passed by Respondent order dtd 28.09.2015 Respondent will recover remaining 70% of assessed amount from Appellant in accordance with law. The Appeal filed u/s. 7Q is not maintainable.
72487 496/2018 14B-7Q EPF Appeal Malar Energy and Infrastructure Pvt. Ltd. RPFC, Trichy 18/06/2024
25/09/2024
26/12/2024
26/03/2025
25/06/2025
25/08/2025
14/11/2025
20/02/2026
24/02/2026
26/02/2026
(Special Campaign) Final Order - Waived 30% of assessed amount passed by Respondent order dtd 28.09.2015 Respondent will recover remaining 70% of assessed amount from Appellant in accordance with law. The Appeal filed u/s. 7Q is not maintainable.
72488 496/2018 14B-7Q EPF Appeal Malar Energy and Infrastructure Pvt. Ltd. RPFC, Trichy 18/06/2024
25/09/2024
26/12/2024
26/03/2025
25/06/2025
25/08/2025
14/11/2025
20/02/2026
24/02/2026
26/02/2026
(Special Campaign) Final Order - Waived 30% of assessed amount passed by Respondent order dtd 28.09.2015 Respondent will recover remaining 70% of assessed amount from Appellant in accordance with law. The Appeal filed u/s. 7Q is not maintainable.
72489 495/2018 14B-7Q EPF Appeal Laven Technoblend Limited (Coimbatore Popular Spinning Mills Ltd.) APFC, Coimbatore 21/07/2025
16/09/2025
18/12/2025
26/03/2026
11/06/2026
18/06/2026
06/08/2026
I.A.No. 14 of 2026 is allowed. The Appellant name “Coimbatore Popular Spinning Mills Limited” is amended as “Laven Technoblend Limited”. List to 06.08.2026 for hearing on Arguments.
72490 495/2018 14B-7Q EPF Appeal Laven Technoblend Limited (Coimbatore Popular Spinning Mills Ltd.) APFC, Coimbatore 21/07/2025
16/09/2025
18/12/2025
26/03/2026
11/06/2026
18/06/2026
06/08/2026
I.A.No. 14 of 2026 is allowed. The Appellant name “Coimbatore Popular Spinning Mills Limited” is amended as “Laven Technoblend Limited”. List to 06.08.2026 for hearing on Arguments.
72491 495/2018 14B-7Q EPF Appeal Laven Technoblend Limited (Coimbatore Popular Spinning Mills Ltd.) APFC, Coimbatore 21/07/2025
16/09/2025
18/12/2025
26/03/2026
11/06/2026
18/06/2026
06/08/2026
I.A.No. 14 of 2026 is allowed. The Appellant name “Coimbatore Popular Spinning Mills Limited” is amended as “Laven Technoblend Limited”. List to 06.08.2026 for hearing on Arguments.
72492 495/2018 14B-7Q EPF Appeal Laven Technoblend Limited (Coimbatore Popular Spinning Mills Ltd.) APFC, Coimbatore 21/07/2025
16/09/2025
18/12/2025
26/03/2026
11/06/2026
18/06/2026
06/08/2026
I.A.No. 14 of 2026 is allowed. The Appellant name “Coimbatore Popular Spinning Mills Limited” is amended as “Laven Technoblend Limited”. List to 06.08.2026 for hearing on Arguments.
72493 495/2018 14B-7Q EPF Appeal Laven Technoblend Limited (Coimbatore Popular Spinning Mills Ltd.) APFC, Coimbatore 21/07/2025
16/09/2025
18/12/2025
26/03/2026
11/06/2026
18/06/2026
06/08/2026
I.A.No. 14 of 2026 is allowed. The Appellant name “Coimbatore Popular Spinning Mills Limited” is amended as “Laven Technoblend Limited”. List to 06.08.2026 for hearing on Arguments.
72494 495/2018 14B-7Q EPF Appeal Laven Technoblend Limited (Coimbatore Popular Spinning Mills Ltd.) APFC, Coimbatore 21/07/2025
16/09/2025
18/12/2025
26/03/2026
11/06/2026
18/06/2026
06/08/2026
I.A.No. 14 of 2026 is allowed. The Appellant name “Coimbatore Popular Spinning Mills Limited” is amended as “Laven Technoblend Limited”. List to 06.08.2026 for hearing on Arguments.
72495 495/2018 14B-7Q EPF Appeal Laven Technoblend Limited (Coimbatore Popular Spinning Mills Ltd.) APFC, Coimbatore 21/07/2025
16/09/2025
18/12/2025
26/03/2026
11/06/2026
18/06/2026
06/08/2026
I.A.No. 14 of 2026 is allowed. The Appellant name “Coimbatore Popular Spinning Mills Limited” is amended as “Laven Technoblend Limited”. List to 06.08.2026 for hearing on Arguments.
72496 494/2018 14B-7Q EPF Appeal Srivari Educational Charitable Trust APFC, Coimbatore 27/12/2024
27/03/2025
26/06/2025
26/08/2025
20/11/2025
06/02/2026
(Special Campaign) Final Order - The Appeal u/s. 14B is partly allowed. 30% of the assessed damages amount is waived off. The Appeal u/s. 7Q is dismissed.
72497 494/2018 14B-7Q EPF Appeal Srivari Educational Charitable Trust APFC, Coimbatore 27/12/2024
27/03/2025
26/06/2025
26/08/2025
20/11/2025
06/02/2026
(Special Campaign) Final Order - The Appeal u/s. 14B is partly allowed. 30% of the assessed damages amount is waived off. The Appeal u/s. 7Q is dismissed.
72498 494/2018 14B-7Q EPF Appeal Srivari Educational Charitable Trust APFC, Coimbatore 27/12/2024
27/03/2025
26/06/2025
26/08/2025
20/11/2025
06/02/2026
(Special Campaign) Final Order - The Appeal u/s. 14B is partly allowed. 30% of the assessed damages amount is waived off. The Appeal u/s. 7Q is dismissed.
72499 494/2018 14B-7Q EPF Appeal Srivari Educational Charitable Trust APFC, Coimbatore 27/12/2024
27/03/2025
26/06/2025
26/08/2025
20/11/2025
06/02/2026
(Special Campaign) Final Order - The Appeal u/s. 14B is partly allowed. 30% of the assessed damages amount is waived off. The Appeal u/s. 7Q is dismissed.
72500 494/2018 14B-7Q EPF Appeal Srivari Educational Charitable Trust APFC, Coimbatore 27/12/2024
27/03/2025
26/06/2025
26/08/2025
20/11/2025
06/02/2026
(Special Campaign) Final Order - The Appeal u/s. 14B is partly allowed. 30% of the assessed damages amount is waived off. The Appeal u/s. 7Q is dismissed.