Cause List

E.g., 14/06/2026
S.No. Case No. Subject Case Type Name of Appellant Respondent Next Date Details Order / Decision Edit
64351 337/2017 14B EPF Appeal Kalaivanar Silk Handloom Weaver's CoopProduction & sales Society Ltd APFC, Trichy 06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 35% of the assessed amount passed by the Respondent order dated 16.06.2012 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law.
64352 337/2017 14B EPF Appeal Kalaivanar Silk Handloom Weaver's CoopProduction & sales Society Ltd APFC, Trichy 06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 35% of the assessed amount passed by the Respondent order dated 16.06.2012 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law.
64353 337/2017 14B EPF Appeal Kalaivanar Silk Handloom Weaver's CoopProduction & sales Society Ltd APFC, Trichy 06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 35% of the assessed amount passed by the Respondent order dated 16.06.2012 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law.
64354 337/2017 14B EPF Appeal Kalaivanar Silk Handloom Weaver's CoopProduction & sales Society Ltd APFC, Trichy 06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 35% of the assessed amount passed by the Respondent order dated 16.06.2012 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law.
64355 337/2017 14B EPF Appeal Kalaivanar Silk Handloom Weaver's CoopProduction & sales Society Ltd APFC, Trichy 06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 35% of the assessed amount passed by the Respondent order dated 16.06.2012 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law.
64356 338/2017 14B EPF Appeal Samayapuram Mariamman Temple APFC, Trichy 23/05/2025
20/08/2025
07/11/2025
12/02/2026
20/02/2026
24/02/2026
25/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 50% of the assessed amount is waived off. Respondent is directed to recover only 50% of assessed amount of damages of Act.
64357 338/2017 14B EPF Appeal Samayapuram Mariamman Temple APFC, Trichy 23/05/2025
20/08/2025
07/11/2025
12/02/2026
20/02/2026
24/02/2026
25/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 50% of the assessed amount is waived off. Respondent is directed to recover only 50% of assessed amount of damages of Act.
64358 338/2017 14B EPF Appeal Samayapuram Mariamman Temple APFC, Trichy 23/05/2025
20/08/2025
07/11/2025
12/02/2026
20/02/2026
24/02/2026
25/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 50% of the assessed amount is waived off. Respondent is directed to recover only 50% of assessed amount of damages of Act.
64359 338/2017 14B EPF Appeal Samayapuram Mariamman Temple APFC, Trichy 23/05/2025
20/08/2025
07/11/2025
12/02/2026
20/02/2026
24/02/2026
25/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 50% of the assessed amount is waived off. Respondent is directed to recover only 50% of assessed amount of damages of Act.
64360 338/2017 14B EPF Appeal Samayapuram Mariamman Temple APFC, Trichy 23/05/2025
20/08/2025
07/11/2025
12/02/2026
20/02/2026
24/02/2026
25/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 50% of the assessed amount is waived off. Respondent is directed to recover only 50% of assessed amount of damages of Act.
64361 338/2017 14B EPF Appeal Samayapuram Mariamman Temple APFC, Trichy 23/05/2025
20/08/2025
07/11/2025
12/02/2026
20/02/2026
24/02/2026
25/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 50% of the assessed amount is waived off. Respondent is directed to recover only 50% of assessed amount of damages of Act.
64362 338/2017 14B EPF Appeal Samayapuram Mariamman Temple APFC, Trichy 23/05/2025
20/08/2025
07/11/2025
12/02/2026
20/02/2026
24/02/2026
25/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 50% of the assessed amount is waived off. Respondent is directed to recover only 50% of assessed amount of damages of Act.
64363 472/2017 14B EPF Appeal The Pudukkattai District Coop. Spinning Mills Ltd. RPFC, Trichy 08/01/2025
09/04/2025
09/07/2025
04/09/2025
04/12/2025
12/03/2026
29/05/2026
The learned Counsel on behalf of the Appellant is ready to argue but the Counsel on behalf of the Respondent prays for time. Time granted. List to 12.03.2026 for hearing on Arguments/filing of written submission.
64364 472/2017 14B EPF Appeal The Pudukkattai District Coop. Spinning Mills Ltd. RPFC, Trichy 08/01/2025
09/04/2025
09/07/2025
04/09/2025
04/12/2025
12/03/2026
29/05/2026
The learned Counsel on behalf of the Appellant is ready to argue but the Counsel on behalf of the Respondent prays for time. Time granted. List to 12.03.2026 for hearing on Arguments/filing of written submission.
64365 472/2017 14B EPF Appeal The Pudukkattai District Coop. Spinning Mills Ltd. RPFC, Trichy 08/01/2025
09/04/2025
09/07/2025
04/09/2025
04/12/2025
12/03/2026
29/05/2026
The learned Counsel on behalf of the Appellant is ready to argue but the Counsel on behalf of the Respondent prays for time. Time granted. List to 12.03.2026 for hearing on Arguments/filing of written submission.
64366 472/2017 14B EPF Appeal The Pudukkattai District Coop. Spinning Mills Ltd. RPFC, Trichy 08/01/2025
09/04/2025
09/07/2025
04/09/2025
04/12/2025
12/03/2026
29/05/2026
The learned Counsel on behalf of the Appellant is ready to argue but the Counsel on behalf of the Respondent prays for time. Time granted. List to 12.03.2026 for hearing on Arguments/filing of written submission.
64367 472/2017 14B EPF Appeal The Pudukkattai District Coop. Spinning Mills Ltd. RPFC, Trichy 08/01/2025
09/04/2025
09/07/2025
04/09/2025
04/12/2025
12/03/2026
29/05/2026
The learned Counsel on behalf of the Appellant is ready to argue but the Counsel on behalf of the Respondent prays for time. Time granted. List to 12.03.2026 for hearing on Arguments/filing of written submission.
64368 472/2017 14B EPF Appeal The Pudukkattai District Coop. Spinning Mills Ltd. RPFC, Trichy 08/01/2025
09/04/2025
09/07/2025
04/09/2025
04/12/2025
12/03/2026
29/05/2026
The learned Counsel on behalf of the Appellant is ready to argue but the Counsel on behalf of the Respondent prays for time. Time granted. List to 12.03.2026 for hearing on Arguments/filing of written submission.
64369 472/2017 14B EPF Appeal The Pudukkattai District Coop. Spinning Mills Ltd. RPFC, Trichy 08/01/2025
09/04/2025
09/07/2025
04/09/2025
04/12/2025
12/03/2026
29/05/2026
The learned Counsel on behalf of the Appellant is ready to argue but the Counsel on behalf of the Respondent prays for time. Time granted. List to 12.03.2026 for hearing on Arguments/filing of written submission.
64370 487/2017 14B-7Q EPF Appeal Sri Ranganathasamy Temple APFC, Trichy 12/09/2023
23/01/2024
20/05/2024
06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
Final Order - The Appeal is partly allowed.
64371 487/2017 14B-7Q EPF Appeal Sri Ranganathasamy Temple APFC, Trichy 12/09/2023
23/01/2024
20/05/2024
06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
Final Order - The Appeal is partly allowed.
64372 487/2017 14B-7Q EPF Appeal Sri Ranganathasamy Temple APFC, Trichy 12/09/2023
23/01/2024
20/05/2024
06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
Final Order - The Appeal is partly allowed.
64373 487/2017 14B-7Q EPF Appeal Sri Ranganathasamy Temple APFC, Trichy 12/09/2023
23/01/2024
20/05/2024
06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
Final Order - The Appeal is partly allowed.
64374 487/2017 14B-7Q EPF Appeal Sri Ranganathasamy Temple APFC, Trichy 12/09/2023
23/01/2024
20/05/2024
06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
Final Order - The Appeal is partly allowed.
64375 487/2017 14B-7Q EPF Appeal Sri Ranganathasamy Temple APFC, Trichy 12/09/2023
23/01/2024
20/05/2024
06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
Final Order - The Appeal is partly allowed.
64376 487/2017 14B-7Q EPF Appeal Sri Ranganathasamy Temple APFC, Trichy 12/09/2023
23/01/2024
20/05/2024
06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
Final Order - The Appeal is partly allowed.
64377 487/2017 14B-7Q EPF Appeal Sri Ranganathasamy Temple APFC, Trichy 12/09/2023
23/01/2024
20/05/2024
06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
Final Order - The Appeal is partly allowed.
64378 2/2017 14B EPF Appeal Cotton Blossom (I) Pvt. Ltd., RPFC, Coimbatore 24/04/2024
24/07/2024
04/11/2024
10/02/2025
05/05/2025
25/07/2025
25/09/2025
01/01/2026
04/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed damages amount is waived off.
64379 2/2017 14B EPF Appeal Cotton Blossom (I) Pvt. Ltd., RPFC, Coimbatore 24/04/2024
24/07/2024
04/11/2024
10/02/2025
05/05/2025
25/07/2025
25/09/2025
01/01/2026
04/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed damages amount is waived off.
64380 2/2017 14B EPF Appeal Cotton Blossom (I) Pvt. Ltd., RPFC, Coimbatore 24/04/2024
24/07/2024
04/11/2024
10/02/2025
05/05/2025
25/07/2025
25/09/2025
01/01/2026
04/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed damages amount is waived off.
64381 2/2017 14B EPF Appeal Cotton Blossom (I) Pvt. Ltd., RPFC, Coimbatore 24/04/2024
24/07/2024
04/11/2024
10/02/2025
05/05/2025
25/07/2025
25/09/2025
01/01/2026
04/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed damages amount is waived off.
64382 2/2017 14B EPF Appeal Cotton Blossom (I) Pvt. Ltd., RPFC, Coimbatore 24/04/2024
24/07/2024
04/11/2024
10/02/2025
05/05/2025
25/07/2025
25/09/2025
01/01/2026
04/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed damages amount is waived off.
64383 2/2017 14B EPF Appeal Cotton Blossom (I) Pvt. Ltd., RPFC, Coimbatore 24/04/2024
24/07/2024
04/11/2024
10/02/2025
05/05/2025
25/07/2025
25/09/2025
01/01/2026
04/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed damages amount is waived off.
64384 2/2017 14B EPF Appeal Cotton Blossom (I) Pvt. Ltd., RPFC, Coimbatore 24/04/2024
24/07/2024
04/11/2024
10/02/2025
05/05/2025
25/07/2025
25/09/2025
01/01/2026
04/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed damages amount is waived off.
64385 2/2017 14B EPF Appeal Cotton Blossom (I) Pvt. Ltd., RPFC, Coimbatore 24/04/2024
24/07/2024
04/11/2024
10/02/2025
05/05/2025
25/07/2025
25/09/2025
01/01/2026
04/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed damages amount is waived off.
64386 2/2017 14B EPF Appeal Cotton Blossom (I) Pvt. Ltd., RPFC, Coimbatore 24/04/2024
24/07/2024
04/11/2024
10/02/2025
05/05/2025
25/07/2025
25/09/2025
01/01/2026
04/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed damages amount is waived off.
64387 03/2017 14B EPF Appeal Tekno Trust India Service APFC, Coimbatore 04/11/2024
10/02/2025
05/05/2025
25/07/2025
25/09/2025
01/01/2026
04/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act.
64388 03/2017 14B EPF Appeal Tekno Trust India Service APFC, Coimbatore 04/11/2024
10/02/2025
05/05/2025
25/07/2025
25/09/2025
01/01/2026
04/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act.
64389 03/2017 14B EPF Appeal Tekno Trust India Service APFC, Coimbatore 04/11/2024
10/02/2025
05/05/2025
25/07/2025
25/09/2025
01/01/2026
04/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act.
64390 03/2017 14B EPF Appeal Tekno Trust India Service APFC, Coimbatore 04/11/2024
10/02/2025
05/05/2025
25/07/2025
25/09/2025
01/01/2026
04/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act.
64391 03/2017 14B EPF Appeal Tekno Trust India Service APFC, Coimbatore 04/11/2024
10/02/2025
05/05/2025
25/07/2025
25/09/2025
01/01/2026
04/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act.
64392 03/2017 14B EPF Appeal Tekno Trust India Service APFC, Coimbatore 04/11/2024
10/02/2025
05/05/2025
25/07/2025
25/09/2025
01/01/2026
04/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act.
64393 03/2017 14B EPF Appeal Tekno Trust India Service APFC, Coimbatore 04/11/2024
10/02/2025
05/05/2025
25/07/2025
25/09/2025
01/01/2026
04/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act.
64394 05/2017 14B EPF Appeal Good Sun Industries APFC, Coimbatore 24/07/2024
04/11/2024
10/02/2025
05/05/2025
25/07/2025
25/09/2025
01/01/2026
04/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act.
64395 05/2017 14B EPF Appeal Good Sun Industries APFC, Coimbatore 24/07/2024
04/11/2024
10/02/2025
05/05/2025
25/07/2025
25/09/2025
01/01/2026
04/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act.
64396 05/2017 14B EPF Appeal Good Sun Industries APFC, Coimbatore 24/07/2024
04/11/2024
10/02/2025
05/05/2025
25/07/2025
25/09/2025
01/01/2026
04/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act.
64397 05/2017 14B EPF Appeal Good Sun Industries APFC, Coimbatore 24/07/2024
04/11/2024
10/02/2025
05/05/2025
25/07/2025
25/09/2025
01/01/2026
04/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act.
64398 05/2017 14B EPF Appeal Good Sun Industries APFC, Coimbatore 24/07/2024
04/11/2024
10/02/2025
05/05/2025
25/07/2025
25/09/2025
01/01/2026
04/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act.
64399 05/2017 14B EPF Appeal Good Sun Industries APFC, Coimbatore 24/07/2024
04/11/2024
10/02/2025
05/05/2025
25/07/2025
25/09/2025
01/01/2026
04/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act.
64400 05/2017 14B EPF Appeal Good Sun Industries APFC, Coimbatore 24/07/2024
04/11/2024
10/02/2025
05/05/2025
25/07/2025
25/09/2025
01/01/2026
04/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act.