Cause List
| S.No. | Case No. | Subject | Case Type | Name of Appellant | Respondent | Next Date | Details | Order / Decision | Edit |
|---|---|---|---|---|---|---|---|---|---|
| 52651 | 419/2018 | 14B | EPF Appeal | Vignesh Leather Company | APFC, Trichy |
03/06/2024 09/09/2024 09/12/2024 21/01/2025 23/04/2025 22/07/2025 17/09/2025 10/10/2025 |
Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of assessed damages amount. | ||
| 52652 | 419/2018 | 14B | EPF Appeal | Vignesh Leather Company | APFC, Trichy |
03/06/2024 09/09/2024 09/12/2024 21/01/2025 23/04/2025 22/07/2025 17/09/2025 10/10/2025 |
Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of assessed damages amount. | ||
| 52653 | 419/2018 | 14B | EPF Appeal | Vignesh Leather Company | APFC, Trichy |
03/06/2024 09/09/2024 09/12/2024 21/01/2025 23/04/2025 22/07/2025 17/09/2025 10/10/2025 |
Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of assessed damages amount. | ||
| 52654 | 419/2018 | 14B | EPF Appeal | Vignesh Leather Company | APFC, Trichy |
03/06/2024 09/09/2024 09/12/2024 21/01/2025 23/04/2025 22/07/2025 17/09/2025 10/10/2025 |
Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of assessed damages amount. | ||
| 52655 | 419/2018 | 14B | EPF Appeal | Vignesh Leather Company | APFC, Trichy |
03/06/2024 09/09/2024 09/12/2024 21/01/2025 23/04/2025 22/07/2025 17/09/2025 10/10/2025 |
Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of assessed damages amount. | ||
| 52656 | 419/2018 | 14B | EPF Appeal | Vignesh Leather Company | APFC, Trichy |
03/06/2024 09/09/2024 09/12/2024 21/01/2025 23/04/2025 22/07/2025 17/09/2025 10/10/2025 |
Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of assessed damages amount. | ||
| 52657 | 419/2018 | 14B | EPF Appeal | Vignesh Leather Company | APFC, Trichy |
03/06/2024 09/09/2024 09/12/2024 21/01/2025 23/04/2025 22/07/2025 17/09/2025 10/10/2025 |
Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of assessed damages amount. | ||
| 52658 | 419/2018 | 14B | EPF Appeal | Vignesh Leather Company | APFC, Trichy |
03/06/2024 09/09/2024 09/12/2024 21/01/2025 23/04/2025 22/07/2025 17/09/2025 10/10/2025 |
Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of assessed damages amount. | ||
| 52659 | 418/2018 | 14B | EPF Appeal | Sri Kanchi Sankara | APFC, Trichy |
06/08/2024 07/11/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 |
Final Order - 32% of the assessed amount passed by the Respondent order dated 23.12.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 52660 | 418/2018 | 14B | EPF Appeal | Sri Kanchi Sankara | APFC, Trichy |
06/08/2024 07/11/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 |
Final Order - 32% of the assessed amount passed by the Respondent order dated 23.12.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 52661 | 418/2018 | 14B | EPF Appeal | Sri Kanchi Sankara | APFC, Trichy |
06/08/2024 07/11/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 |
Final Order - 32% of the assessed amount passed by the Respondent order dated 23.12.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 52662 | 418/2018 | 14B | EPF Appeal | Sri Kanchi Sankara | APFC, Trichy |
06/08/2024 07/11/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 |
Final Order - 32% of the assessed amount passed by the Respondent order dated 23.12.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 52663 | 418/2018 | 14B | EPF Appeal | Sri Kanchi Sankara | APFC, Trichy |
06/08/2024 07/11/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 |
Final Order - 32% of the assessed amount passed by the Respondent order dated 23.12.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 52664 | 418/2018 | 14B | EPF Appeal | Sri Kanchi Sankara | APFC, Trichy |
06/08/2024 07/11/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 |
Final Order - 32% of the assessed amount passed by the Respondent order dated 23.12.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 52665 | 418/2018 | 14B | EPF Appeal | Sri Kanchi Sankara | APFC, Trichy |
06/08/2024 07/11/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 |
Final Order - 32% of the assessed amount passed by the Respondent order dated 23.12.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 52666 | 418/2018 | 14B | EPF Appeal | Sri Kanchi Sankara | APFC, Trichy |
06/08/2024 07/11/2024 13/02/2025 08/05/2025 06/08/2025 15/10/2025 16/01/2026 16/04/2026 |
Final Order - 32% of the assessed amount passed by the Respondent order dated 23.12.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 52667 | 417/2018 | 14B | EPF Appeal | Modern Associate Contract | APFC, Trichy |
20/08/2024 21/11/2024 28/02/2025 23/05/2025 20/08/2025 07/11/2025 13/02/2026 |
Final Order - 32% of the assessed amount passed by the Respondent order dated 03.11.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 52668 | 417/2018 | 14B | EPF Appeal | Modern Associate Contract | APFC, Trichy |
20/08/2024 21/11/2024 28/02/2025 23/05/2025 20/08/2025 07/11/2025 13/02/2026 |
Final Order - 32% of the assessed amount passed by the Respondent order dated 03.11.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 52669 | 417/2018 | 14B | EPF Appeal | Modern Associate Contract | APFC, Trichy |
20/08/2024 21/11/2024 28/02/2025 23/05/2025 20/08/2025 07/11/2025 13/02/2026 |
Final Order - 32% of the assessed amount passed by the Respondent order dated 03.11.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 52670 | 417/2018 | 14B | EPF Appeal | Modern Associate Contract | APFC, Trichy |
20/08/2024 21/11/2024 28/02/2025 23/05/2025 20/08/2025 07/11/2025 13/02/2026 |
Final Order - 32% of the assessed amount passed by the Respondent order dated 03.11.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 52671 | 417/2018 | 14B | EPF Appeal | Modern Associate Contract | APFC, Trichy |
20/08/2024 21/11/2024 28/02/2025 23/05/2025 20/08/2025 07/11/2025 13/02/2026 |
Final Order - 32% of the assessed amount passed by the Respondent order dated 03.11.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 52672 | 417/2018 | 14B | EPF Appeal | Modern Associate Contract | APFC, Trichy |
20/08/2024 21/11/2024 28/02/2025 23/05/2025 20/08/2025 07/11/2025 13/02/2026 |
Final Order - 32% of the assessed amount passed by the Respondent order dated 03.11.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 52673 | 417/2018 | 14B | EPF Appeal | Modern Associate Contract | APFC, Trichy |
20/08/2024 21/11/2024 28/02/2025 23/05/2025 20/08/2025 07/11/2025 13/02/2026 |
Final Order - 32% of the assessed amount passed by the Respondent order dated 03.11.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 52674 | 416/2018 | 14B | EPF Appeal | The Professional Couriers | APFC, Trichy |
13/03/2025 12/06/2025 20/06/2025 02/07/2025 01/09/2025 07/11/2025 13/02/2026 |
Final Order - 30% of the assessed amount passed by the Respondent order dated 13.01.2016 is waived. The Respondent will recover remaining 70% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 52675 | 416/2018 | 14B | EPF Appeal | The Professional Couriers | APFC, Trichy |
13/03/2025 12/06/2025 20/06/2025 02/07/2025 01/09/2025 07/11/2025 13/02/2026 |
Final Order - 30% of the assessed amount passed by the Respondent order dated 13.01.2016 is waived. The Respondent will recover remaining 70% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 52676 | 416/2018 | 14B | EPF Appeal | The Professional Couriers | APFC, Trichy |
13/03/2025 12/06/2025 20/06/2025 02/07/2025 01/09/2025 07/11/2025 13/02/2026 |
Final Order - 30% of the assessed amount passed by the Respondent order dated 13.01.2016 is waived. The Respondent will recover remaining 70% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 52677 | 416/2018 | 14B | EPF Appeal | The Professional Couriers | APFC, Trichy |
13/03/2025 12/06/2025 20/06/2025 02/07/2025 01/09/2025 07/11/2025 13/02/2026 |
Final Order - 30% of the assessed amount passed by the Respondent order dated 13.01.2016 is waived. The Respondent will recover remaining 70% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 52678 | 416/2018 | 14B | EPF Appeal | The Professional Couriers | APFC, Trichy |
13/03/2025 12/06/2025 20/06/2025 02/07/2025 01/09/2025 07/11/2025 13/02/2026 |
Final Order - 30% of the assessed amount passed by the Respondent order dated 13.01.2016 is waived. The Respondent will recover remaining 70% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 52679 | 416/2018 | 14B | EPF Appeal | The Professional Couriers | APFC, Trichy |
13/03/2025 12/06/2025 20/06/2025 02/07/2025 01/09/2025 07/11/2025 13/02/2026 |
Final Order - 30% of the assessed amount passed by the Respondent order dated 13.01.2016 is waived. The Respondent will recover remaining 70% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 52680 | 416/2018 | 14B | EPF Appeal | The Professional Couriers | APFC, Trichy |
13/03/2025 12/06/2025 20/06/2025 02/07/2025 01/09/2025 07/11/2025 13/02/2026 |
Final Order - 30% of the assessed amount passed by the Respondent order dated 13.01.2016 is waived. The Respondent will recover remaining 70% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 52681 | 415/2018 | 14B | EPF Appeal | S. Saravana Contractor | APFC, Trichy |
09/12/2024 21/01/2025 23/04/2025 22/07/2025 17/09/2025 19/12/2025 03/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. The appeal u/s. 7Q of the Act is dismissed. | ||
| 52682 | 415/2018 | 14B | EPF Appeal | S. Saravana Contractor | APFC, Trichy |
09/12/2024 21/01/2025 23/04/2025 22/07/2025 17/09/2025 19/12/2025 03/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. The appeal u/s. 7Q of the Act is dismissed. | ||
| 52683 | 415/2018 | 14B | EPF Appeal | S. Saravana Contractor | APFC, Trichy |
09/12/2024 21/01/2025 23/04/2025 22/07/2025 17/09/2025 19/12/2025 03/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. The appeal u/s. 7Q of the Act is dismissed. | ||
| 52684 | 415/2018 | 14B | EPF Appeal | S. Saravana Contractor | APFC, Trichy |
09/12/2024 21/01/2025 23/04/2025 22/07/2025 17/09/2025 19/12/2025 03/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. The appeal u/s. 7Q of the Act is dismissed. | ||
| 52685 | 415/2018 | 14B | EPF Appeal | S. Saravana Contractor | APFC, Trichy |
09/12/2024 21/01/2025 23/04/2025 22/07/2025 17/09/2025 19/12/2025 03/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. The appeal u/s. 7Q of the Act is dismissed. | ||
| 52686 | 415/2018 | 14B | EPF Appeal | S. Saravana Contractor | APFC, Trichy |
09/12/2024 21/01/2025 23/04/2025 22/07/2025 17/09/2025 19/12/2025 03/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. The appeal u/s. 7Q of the Act is dismissed. | ||
| 52687 | 415/2018 | 14B | EPF Appeal | S. Saravana Contractor | APFC, Trichy |
09/12/2024 21/01/2025 23/04/2025 22/07/2025 17/09/2025 19/12/2025 03/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. The appeal u/s. 7Q of the Act is dismissed. | ||
| 52688 | 414/2018 | 14B | EPF Appeal | Dr.Samuel A Mathenan Nursing Home | APFC, Trichy |
20/11/2019 27/01/2020 12/03/2020 11/06/2020 09/09/2020 18/01/2021 21/06/2021 24/11/2021 08/03/2022 11/03/2022 |
Final Order-The Appeal stands dismissed. | ||
| 52689 | 414/2018 | 14B | EPF Appeal | Dr.Samuel A Mathenan Nursing Home | APFC, Trichy |
20/11/2019 27/01/2020 12/03/2020 11/06/2020 09/09/2020 18/01/2021 21/06/2021 24/11/2021 08/03/2022 11/03/2022 |
Final Order-The Appeal stands dismissed. | ||
| 52690 | 414/2018 | 14B | EPF Appeal | Dr.Samuel A Mathenan Nursing Home | APFC, Trichy |
20/11/2019 27/01/2020 12/03/2020 11/06/2020 09/09/2020 18/01/2021 21/06/2021 24/11/2021 08/03/2022 11/03/2022 |
Final Order-The Appeal stands dismissed. | ||
| 52691 | 414/2018 | 14B | EPF Appeal | Dr.Samuel A Mathenan Nursing Home | APFC, Trichy |
20/11/2019 27/01/2020 12/03/2020 11/06/2020 09/09/2020 18/01/2021 21/06/2021 24/11/2021 08/03/2022 11/03/2022 |
Final Order-The Appeal stands dismissed. | ||
| 52692 | 414/2018 | 14B | EPF Appeal | Dr.Samuel A Mathenan Nursing Home | APFC, Trichy |
20/11/2019 27/01/2020 12/03/2020 11/06/2020 09/09/2020 18/01/2021 21/06/2021 24/11/2021 08/03/2022 11/03/2022 |
Final Order-The Appeal stands dismissed. | ||
| 52693 | 414/2018 | 14B | EPF Appeal | Dr.Samuel A Mathenan Nursing Home | APFC, Trichy |
20/11/2019 27/01/2020 12/03/2020 11/06/2020 09/09/2020 18/01/2021 21/06/2021 24/11/2021 08/03/2022 11/03/2022 |
Final Order-The Appeal stands dismissed. | ||
| 52694 | 414/2018 | 14B | EPF Appeal | Dr.Samuel A Mathenan Nursing Home | APFC, Trichy |
20/11/2019 27/01/2020 12/03/2020 11/06/2020 09/09/2020 18/01/2021 21/06/2021 24/11/2021 08/03/2022 11/03/2022 |
Final Order-The Appeal stands dismissed. | ||
| 52695 | 414/2018 | 14B | EPF Appeal | Dr.Samuel A Mathenan Nursing Home | APFC, Trichy |
20/11/2019 27/01/2020 12/03/2020 11/06/2020 09/09/2020 18/01/2021 21/06/2021 24/11/2021 08/03/2022 11/03/2022 |
Final Order-The Appeal stands dismissed. | ||
| 52696 | 414/2018 | 14B | EPF Appeal | Dr.Samuel A Mathenan Nursing Home | APFC, Trichy |
20/11/2019 27/01/2020 12/03/2020 11/06/2020 09/09/2020 18/01/2021 21/06/2021 24/11/2021 08/03/2022 11/03/2022 |
Final Order-The Appeal stands dismissed. | ||
| 52697 | 414/2018 | 14B | EPF Appeal | Dr.Samuel A Mathenan Nursing Home | APFC, Trichy |
20/11/2019 27/01/2020 12/03/2020 11/06/2020 09/09/2020 18/01/2021 21/06/2021 24/11/2021 08/03/2022 11/03/2022 |
Final Order-The Appeal stands dismissed. | ||
| 52698 | 413/2018 | 7A & 8F | EPF Appeal | Oxford Engineering College | APFC, Trichy |
12/06/2025 12/08/2025 23/10/2025 29/01/2026 18/03/2026 04/06/2026 14/08/2026 |
M/s. M. Aishwariya, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 14.08.2026 for hearing on Arguments/filing of written submiss | ||
| 52699 | 413/2018 | 7A & 8F | EPF Appeal | Oxford Engineering College | APFC, Trichy |
12/06/2025 12/08/2025 23/10/2025 29/01/2026 18/03/2026 04/06/2026 14/08/2026 |
M/s. M. Aishwariya, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 14.08.2026 for hearing on Arguments/filing of written submiss | ||
| 52700 | 413/2018 | 7A & 8F | EPF Appeal | Oxford Engineering College | APFC, Trichy |
12/06/2025 12/08/2025 23/10/2025 29/01/2026 18/03/2026 04/06/2026 14/08/2026 |
M/s. M. Aishwariya, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 14.08.2026 for hearing on Arguments/filing of written submiss |