Cause List
| S.No. | Case No. | Subject | Case Type | Name of Appellant | Respondent | Next Date | Details | Order / Decision | Edit |
|---|---|---|---|---|---|---|---|---|---|
| 76351 | 392/2017 | 7A | EPF Appeal | Meru Consultants & Technology Pvt. Ltd. | RPFC, Chennai |
19/08/2024 20/11/2024 28/02/2025 22/05/2025 21/08/2025 12/11/2025 18/02/2026 14/05/2026 05/08/2026 |
M/s. Jaishankar, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 05.08.2026 for hearing on Arguments/filing of written submission. | ||
| 76352 | 392/2017 | 7A | EPF Appeal | Meru Consultants & Technology Pvt. Ltd. | RPFC, Chennai |
19/08/2024 20/11/2024 28/02/2025 22/05/2025 21/08/2025 12/11/2025 18/02/2026 14/05/2026 05/08/2026 |
M/s. Jaishankar, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 05.08.2026 for hearing on Arguments/filing of written submission. | ||
| 76353 | 392/2017 | 7A | EPF Appeal | Meru Consultants & Technology Pvt. Ltd. | RPFC, Chennai |
19/08/2024 20/11/2024 28/02/2025 22/05/2025 21/08/2025 12/11/2025 18/02/2026 14/05/2026 05/08/2026 |
M/s. Jaishankar, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 05.08.2026 for hearing on Arguments/filing of written submission. | ||
| 76354 | 392/2017 | 7A | EPF Appeal | Meru Consultants & Technology Pvt. Ltd. | RPFC, Chennai |
19/08/2024 20/11/2024 28/02/2025 22/05/2025 21/08/2025 12/11/2025 18/02/2026 14/05/2026 05/08/2026 |
M/s. Jaishankar, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 05.08.2026 for hearing on Arguments/filing of written submission. | ||
| 76355 | 392/2017 | 7A | EPF Appeal | Meru Consultants & Technology Pvt. Ltd. | RPFC, Chennai |
19/08/2024 20/11/2024 28/02/2025 22/05/2025 21/08/2025 12/11/2025 18/02/2026 14/05/2026 05/08/2026 |
M/s. Jaishankar, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 05.08.2026 for hearing on Arguments/filing of written submission. | ||
| 76356 | 304/2017 | 14B -7Q | EPF Appeal | Nagapattinam Distt. CoopSpinning Mills Ltd. | RPFC, Coimbatore |
31/01/2025 01/04/2025 27/05/2025 15/07/2025 11/09/2025 12/12/2025 07/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 40% of the assessed damages amount is waived off. The respondent is directed to refund the amount fixed by this Tribunal to Appellant within 3 months from the date of receipt of this order. | ||
| 76357 | 304/2017 | 14B -7Q | EPF Appeal | Nagapattinam Distt. CoopSpinning Mills Ltd. | RPFC, Coimbatore |
31/01/2025 01/04/2025 27/05/2025 15/07/2025 11/09/2025 12/12/2025 07/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 40% of the assessed damages amount is waived off. The respondent is directed to refund the amount fixed by this Tribunal to Appellant within 3 months from the date of receipt of this order. | ||
| 76358 | 304/2017 | 14B -7Q | EPF Appeal | Nagapattinam Distt. CoopSpinning Mills Ltd. | RPFC, Coimbatore |
31/01/2025 01/04/2025 27/05/2025 15/07/2025 11/09/2025 12/12/2025 07/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 40% of the assessed damages amount is waived off. The respondent is directed to refund the amount fixed by this Tribunal to Appellant within 3 months from the date of receipt of this order. | ||
| 76359 | 304/2017 | 14B -7Q | EPF Appeal | Nagapattinam Distt. CoopSpinning Mills Ltd. | RPFC, Coimbatore |
31/01/2025 01/04/2025 27/05/2025 15/07/2025 11/09/2025 12/12/2025 07/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 40% of the assessed damages amount is waived off. The respondent is directed to refund the amount fixed by this Tribunal to Appellant within 3 months from the date of receipt of this order. | ||
| 76360 | 304/2017 | 14B -7Q | EPF Appeal | Nagapattinam Distt. CoopSpinning Mills Ltd. | RPFC, Coimbatore |
31/01/2025 01/04/2025 27/05/2025 15/07/2025 11/09/2025 12/12/2025 07/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 40% of the assessed damages amount is waived off. The respondent is directed to refund the amount fixed by this Tribunal to Appellant within 3 months from the date of receipt of this order. | ||
| 76361 | 304/2017 | 14B -7Q | EPF Appeal | Nagapattinam Distt. CoopSpinning Mills Ltd. | RPFC, Coimbatore |
31/01/2025 01/04/2025 27/05/2025 15/07/2025 11/09/2025 12/12/2025 07/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 40% of the assessed damages amount is waived off. The respondent is directed to refund the amount fixed by this Tribunal to Appellant within 3 months from the date of receipt of this order. | ||
| 76362 | 304/2017 | 14B -7Q | EPF Appeal | Nagapattinam Distt. CoopSpinning Mills Ltd. | RPFC, Coimbatore |
31/01/2025 01/04/2025 27/05/2025 15/07/2025 11/09/2025 12/12/2025 07/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 40% of the assessed damages amount is waived off. The respondent is directed to refund the amount fixed by this Tribunal to Appellant within 3 months from the date of receipt of this order. | ||
| 76363 | 304/2017 | 14B -7Q | EPF Appeal | Nagapattinam Distt. CoopSpinning Mills Ltd. | RPFC, Coimbatore |
31/01/2025 01/04/2025 27/05/2025 15/07/2025 11/09/2025 12/12/2025 07/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 40% of the assessed damages amount is waived off. The respondent is directed to refund the amount fixed by this Tribunal to Appellant within 3 months from the date of receipt of this order. | ||
| 76364 | 81/2017 | 14B | EPF Appeal | NEPC Tea Garden I&II | APFC, Coimbatore |
26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is dismissed as not maintainable. | ||
| 76365 | 81/2017 | 14B | EPF Appeal | NEPC Tea Garden I&II | APFC, Coimbatore |
26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is dismissed as not maintainable. | ||
| 76366 | 81/2017 | 14B | EPF Appeal | NEPC Tea Garden I&II | APFC, Coimbatore |
26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is dismissed as not maintainable. | ||
| 76367 | 81/2017 | 14B | EPF Appeal | NEPC Tea Garden I&II | APFC, Coimbatore |
26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is dismissed as not maintainable. | ||
| 76368 | 81/2017 | 14B | EPF Appeal | NEPC Tea Garden I&II | APFC, Coimbatore |
26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is dismissed as not maintainable. | ||
| 76369 | 81/2017 | 14B | EPF Appeal | NEPC Tea Garden I&II | APFC, Coimbatore |
26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is dismissed as not maintainable. | ||
| 76370 | 81/2017 | 14B | EPF Appeal | NEPC Tea Garden I&II | APFC, Coimbatore |
26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is dismissed as not maintainable. | ||
| 76371 | 408/2018 | 7A | EPF Appeal | Titanium Equipment & Anode Manufacturing Co. Ltd., | APFC, Tambaram |
18/07/2025 22/09/2025 17/10/2025 26/11/2025 12/12/2025 23/01/2026 24/04/2026 15/05/2026 |
Final Order - The Appeal is allowed. The matter is remanded back. | ||
| 76372 | 408/2018 | 7A | EPF Appeal | Titanium Equipment & Anode Manufacturing Co. Ltd., | APFC, Tambaram |
18/07/2025 22/09/2025 17/10/2025 26/11/2025 12/12/2025 23/01/2026 24/04/2026 15/05/2026 |
Final Order - The Appeal is allowed. The matter is remanded back. | ||
| 76373 | 408/2018 | 7A | EPF Appeal | Titanium Equipment & Anode Manufacturing Co. Ltd., | APFC, Tambaram |
18/07/2025 22/09/2025 17/10/2025 26/11/2025 12/12/2025 23/01/2026 24/04/2026 15/05/2026 |
Final Order - The Appeal is allowed. The matter is remanded back. | ||
| 76374 | 408/2018 | 7A | EPF Appeal | Titanium Equipment & Anode Manufacturing Co. Ltd., | APFC, Tambaram |
18/07/2025 22/09/2025 17/10/2025 26/11/2025 12/12/2025 23/01/2026 24/04/2026 15/05/2026 |
Final Order - The Appeal is allowed. The matter is remanded back. | ||
| 76375 | 408/2018 | 7A | EPF Appeal | Titanium Equipment & Anode Manufacturing Co. Ltd., | APFC, Tambaram |
18/07/2025 22/09/2025 17/10/2025 26/11/2025 12/12/2025 23/01/2026 24/04/2026 15/05/2026 |
Final Order - The Appeal is allowed. The matter is remanded back. | ||
| 76376 | 408/2018 | 7A | EPF Appeal | Titanium Equipment & Anode Manufacturing Co. Ltd., | APFC, Tambaram |
18/07/2025 22/09/2025 17/10/2025 26/11/2025 12/12/2025 23/01/2026 24/04/2026 15/05/2026 |
Final Order - The Appeal is allowed. The matter is remanded back. | ||
| 76377 | 408/2018 | 7A | EPF Appeal | Titanium Equipment & Anode Manufacturing Co. Ltd., | APFC, Tambaram |
18/07/2025 22/09/2025 17/10/2025 26/11/2025 12/12/2025 23/01/2026 24/04/2026 15/05/2026 |
Final Order - The Appeal is allowed. The matter is remanded back. | ||
| 76378 | 408/2018 | 7A | EPF Appeal | Titanium Equipment & Anode Manufacturing Co. Ltd., | APFC, Tambaram |
18/07/2025 22/09/2025 17/10/2025 26/11/2025 12/12/2025 23/01/2026 24/04/2026 15/05/2026 |
Final Order - The Appeal is allowed. The matter is remanded back. | ||
| 76379 | 500/2017 | 14B | EPF Appeal | Vinayaga Exports | RPFC, Chennai |
12/03/2025 11/06/2025 01/08/2025 08/10/2025 13/10/2025 19/01/2026 06/02/2026 |
(Special Campaign) Final Order - The Appeal u/s. 14B is partly allowed. 35% of the assessed damages amount is waived off. | ||
| 76380 | 500/2017 | 14B | EPF Appeal | Vinayaga Exports | RPFC, Chennai |
12/03/2025 11/06/2025 01/08/2025 08/10/2025 13/10/2025 19/01/2026 06/02/2026 |
(Special Campaign) Final Order - The Appeal u/s. 14B is partly allowed. 35% of the assessed damages amount is waived off. | ||
| 76381 | 500/2017 | 14B | EPF Appeal | Vinayaga Exports | RPFC, Chennai |
12/03/2025 11/06/2025 01/08/2025 08/10/2025 13/10/2025 19/01/2026 06/02/2026 |
(Special Campaign) Final Order - The Appeal u/s. 14B is partly allowed. 35% of the assessed damages amount is waived off. | ||
| 76382 | 500/2017 | 14B | EPF Appeal | Vinayaga Exports | RPFC, Chennai |
12/03/2025 11/06/2025 01/08/2025 08/10/2025 13/10/2025 19/01/2026 06/02/2026 |
(Special Campaign) Final Order - The Appeal u/s. 14B is partly allowed. 35% of the assessed damages amount is waived off. | ||
| 76383 | 500/2017 | 14B | EPF Appeal | Vinayaga Exports | RPFC, Chennai |
12/03/2025 11/06/2025 01/08/2025 08/10/2025 13/10/2025 19/01/2026 06/02/2026 |
(Special Campaign) Final Order - The Appeal u/s. 14B is partly allowed. 35% of the assessed damages amount is waived off. | ||
| 76384 | 500/2017 | 14B | EPF Appeal | Vinayaga Exports | RPFC, Chennai |
12/03/2025 11/06/2025 01/08/2025 08/10/2025 13/10/2025 19/01/2026 06/02/2026 |
(Special Campaign) Final Order - The Appeal u/s. 14B is partly allowed. 35% of the assessed damages amount is waived off. | ||
| 76385 | 500/2017 | 14B | EPF Appeal | Vinayaga Exports | RPFC, Chennai |
12/03/2025 11/06/2025 01/08/2025 08/10/2025 13/10/2025 19/01/2026 06/02/2026 |
(Special Campaign) Final Order - The Appeal u/s. 14B is partly allowed. 35% of the assessed damages amount is waived off. | ||
| 76386 | 645/2018 | 7A | EPF Appeal | Kovai Public School | APFC, Coimbatore |
26/06/2025 26/08/2025 20/11/2025 19/12/2025 27/03/2026 11/06/2026 20/08/2026 |
The learned Counsel on behalf of the Appellant is present. M/s. R. Vishnu, the Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 20.08.2026 for hearing on Arguments/filing of written submission. | ||
| 76387 | 645/2018 | 7A | EPF Appeal | Kovai Public School | APFC, Coimbatore |
26/06/2025 26/08/2025 20/11/2025 19/12/2025 27/03/2026 11/06/2026 20/08/2026 |
The learned Counsel on behalf of the Appellant is present. M/s. R. Vishnu, the Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 20.08.2026 for hearing on Arguments/filing of written submission. | ||
| 76388 | 645/2018 | 7A | EPF Appeal | Kovai Public School | APFC, Coimbatore |
26/06/2025 26/08/2025 20/11/2025 19/12/2025 27/03/2026 11/06/2026 20/08/2026 |
The learned Counsel on behalf of the Appellant is present. M/s. R. Vishnu, the Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 20.08.2026 for hearing on Arguments/filing of written submission. | ||
| 76389 | 645/2018 | 7A | EPF Appeal | Kovai Public School | APFC, Coimbatore |
26/06/2025 26/08/2025 20/11/2025 19/12/2025 27/03/2026 11/06/2026 20/08/2026 |
The learned Counsel on behalf of the Appellant is present. M/s. R. Vishnu, the Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 20.08.2026 for hearing on Arguments/filing of written submission. | ||
| 76390 | 645/2018 | 7A | EPF Appeal | Kovai Public School | APFC, Coimbatore |
26/06/2025 26/08/2025 20/11/2025 19/12/2025 27/03/2026 11/06/2026 20/08/2026 |
The learned Counsel on behalf of the Appellant is present. M/s. R. Vishnu, the Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 20.08.2026 for hearing on Arguments/filing of written submission. | ||
| 76391 | 645/2018 | 7A | EPF Appeal | Kovai Public School | APFC, Coimbatore |
26/06/2025 26/08/2025 20/11/2025 19/12/2025 27/03/2026 11/06/2026 20/08/2026 |
The learned Counsel on behalf of the Appellant is present. M/s. R. Vishnu, the Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 20.08.2026 for hearing on Arguments/filing of written submission. | ||
| 76392 | 645/2018 | 7A | EPF Appeal | Kovai Public School | APFC, Coimbatore |
26/06/2025 26/08/2025 20/11/2025 19/12/2025 27/03/2026 11/06/2026 20/08/2026 |
The learned Counsel on behalf of the Appellant is present. M/s. R. Vishnu, the Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 20.08.2026 for hearing on Arguments/filing of written submission. | ||
| 76393 | 624/2018 | 14B | EPF Appeal | Devarshola Tea Estate | RPFC, Coimbatore |
24/01/2025 07/04/2025 07/07/2025 02/09/2025 26/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 76394 | 624/2018 | 14B | EPF Appeal | Devarshola Tea Estate | RPFC, Coimbatore |
24/01/2025 07/04/2025 07/07/2025 02/09/2025 26/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 76395 | 624/2018 | 14B | EPF Appeal | Devarshola Tea Estate | RPFC, Coimbatore |
24/01/2025 07/04/2025 07/07/2025 02/09/2025 26/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 76396 | 624/2018 | 14B | EPF Appeal | Devarshola Tea Estate | RPFC, Coimbatore |
24/01/2025 07/04/2025 07/07/2025 02/09/2025 26/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 76397 | 624/2018 | 14B | EPF Appeal | Devarshola Tea Estate | RPFC, Coimbatore |
24/01/2025 07/04/2025 07/07/2025 02/09/2025 26/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 76398 | 624/2018 | 14B | EPF Appeal | Devarshola Tea Estate | RPFC, Coimbatore |
24/01/2025 07/04/2025 07/07/2025 02/09/2025 26/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 76399 | 312/2018 | 14B | EPF Appeal | JJ College of Engineering Technology | APFC-II, Trichy |
26/12/2024 25/03/2025 23/06/2025 14/08/2025 18/08/2025 15/10/2025 16/01/2026 16/04/2026 |
Final Order - 37% of the assessed amount passed by the Respondent order dated 15.11.2017 is waived. The Respondent will recover remaining 63% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 76400 | 312/2018 | 14B | EPF Appeal | JJ College of Engineering Technology | APFC-II, Trichy |
26/12/2024 25/03/2025 23/06/2025 14/08/2025 18/08/2025 15/10/2025 16/01/2026 16/04/2026 |
Final Order - 37% of the assessed amount passed by the Respondent order dated 15.11.2017 is waived. The Respondent will recover remaining 63% of the assessed amount from the Appellant establishment in accordance with law. |