70151 33/2019 14B-7Q EPF Appeal Galiyar Textiles APFC, Coimbatore 10/07/2024
23/10/2024
21/01/2025
22/04/2025
21/07/2025
28/08/2025
06/11/2025
12/02/2026
06/05/2026
Sh. A. Deivasigamani, the learned Counsel for the Appellant filed the written submission and prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondentis present. List to 06.05.2026for hearing on Arguments.
70152 33/2019 14B-7Q EPF Appeal Galiyar Textiles APFC, Coimbatore 10/07/2024
23/10/2024
21/01/2025
22/04/2025
21/07/2025
28/08/2025
06/11/2025
12/02/2026
06/05/2026
Sh. A. Deivasigamani, the learned Counsel for the Appellant filed the written submission and prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondentis present. List to 06.05.2026for hearing on Arguments.
70153 33/2019 14B-7Q EPF Appeal Galiyar Textiles APFC, Coimbatore 10/07/2024
23/10/2024
21/01/2025
22/04/2025
21/07/2025
28/08/2025
06/11/2025
12/02/2026
06/05/2026
Sh. A. Deivasigamani, the learned Counsel for the Appellant filed the written submission and prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondentis present. List to 06.05.2026for hearing on Arguments.
70154 33/2019 14B-7Q EPF Appeal Galiyar Textiles APFC, Coimbatore 10/07/2024
23/10/2024
21/01/2025
22/04/2025
21/07/2025
28/08/2025
06/11/2025
12/02/2026
06/05/2026
Sh. A. Deivasigamani, the learned Counsel for the Appellant filed the written submission and prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondentis present. List to 06.05.2026for hearing on Arguments.
70155 33/2019 14B-7Q EPF Appeal Galiyar Textiles APFC, Coimbatore 10/07/2024
23/10/2024
21/01/2025
22/04/2025
21/07/2025
28/08/2025
06/11/2025
12/02/2026
06/05/2026
Sh. A. Deivasigamani, the learned Counsel for the Appellant filed the written submission and prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondentis present. List to 06.05.2026for hearing on Arguments.
70156 33/2019 14B-7Q EPF Appeal Galiyar Textiles APFC, Coimbatore 10/07/2024
23/10/2024
21/01/2025
22/04/2025
21/07/2025
28/08/2025
06/11/2025
12/02/2026
06/05/2026
Sh. A. Deivasigamani, the learned Counsel for the Appellant filed the written submission and prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondentis present. List to 06.05.2026for hearing on Arguments.
70157 33/2019 14B-7Q EPF Appeal Galiyar Textiles APFC, Coimbatore 10/07/2024
23/10/2024
21/01/2025
22/04/2025
21/07/2025
28/08/2025
06/11/2025
12/02/2026
06/05/2026
Sh. A. Deivasigamani, the learned Counsel for the Appellant filed the written submission and prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondentis present. List to 06.05.2026for hearing on Arguments.
70158 33/2019 14B-7Q EPF Appeal Galiyar Textiles APFC, Coimbatore 10/07/2024
23/10/2024
21/01/2025
22/04/2025
21/07/2025
28/08/2025
06/11/2025
12/02/2026
06/05/2026
Sh. A. Deivasigamani, the learned Counsel for the Appellant filed the written submission and prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondentis present. List to 06.05.2026for hearing on Arguments.
70159 33/2019 14B-7Q EPF Appeal Galiyar Textiles APFC, Coimbatore 10/07/2024
23/10/2024
21/01/2025
22/04/2025
21/07/2025
28/08/2025
06/11/2025
12/02/2026
06/05/2026
Sh. A. Deivasigamani, the learned Counsel for the Appellant filed the written submission and prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondentis present. List to 06.05.2026for hearing on Arguments.
70160 34/2019 14B-7Q EPF Appeal Modern Spinning Mills APFC, Coimbatore 27/12/2024
27/03/2025
26/06/2025
21/07/2025
28/08/2025
06/11/2025
12/02/2026
06/05/2026
Sh. A. Deivasigamani, the learned Counsel for the Appellant filed the written submission and prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 06.05.2026for hearing on Arguments.
70161 34/2019 14B-7Q EPF Appeal Modern Spinning Mills APFC, Coimbatore 27/12/2024
27/03/2025
26/06/2025
21/07/2025
28/08/2025
06/11/2025
12/02/2026
06/05/2026
Sh. A. Deivasigamani, the learned Counsel for the Appellant filed the written submission and prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 06.05.2026for hearing on Arguments.
70162 34/2019 14B-7Q EPF Appeal Modern Spinning Mills APFC, Coimbatore 27/12/2024
27/03/2025
26/06/2025
21/07/2025
28/08/2025
06/11/2025
12/02/2026
06/05/2026
Sh. A. Deivasigamani, the learned Counsel for the Appellant filed the written submission and prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 06.05.2026for hearing on Arguments.
70163 34/2019 14B-7Q EPF Appeal Modern Spinning Mills APFC, Coimbatore 27/12/2024
27/03/2025
26/06/2025
21/07/2025
28/08/2025
06/11/2025
12/02/2026
06/05/2026
Sh. A. Deivasigamani, the learned Counsel for the Appellant filed the written submission and prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 06.05.2026for hearing on Arguments.
70164 34/2019 14B-7Q EPF Appeal Modern Spinning Mills APFC, Coimbatore 27/12/2024
27/03/2025
26/06/2025
21/07/2025
28/08/2025
06/11/2025
12/02/2026
06/05/2026
Sh. A. Deivasigamani, the learned Counsel for the Appellant filed the written submission and prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 06.05.2026for hearing on Arguments.
70165 34/2019 14B-7Q EPF Appeal Modern Spinning Mills APFC, Coimbatore 27/12/2024
27/03/2025
26/06/2025
21/07/2025
28/08/2025
06/11/2025
12/02/2026
06/05/2026
Sh. A. Deivasigamani, the learned Counsel for the Appellant filed the written submission and prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 06.05.2026for hearing on Arguments.
70166 34/2019 14B-7Q EPF Appeal Modern Spinning Mills APFC, Coimbatore 27/12/2024
27/03/2025
26/06/2025
21/07/2025
28/08/2025
06/11/2025
12/02/2026
06/05/2026
Sh. A. Deivasigamani, the learned Counsel for the Appellant filed the written submission and prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 06.05.2026for hearing on Arguments.
70167 34/2019 14B-7Q EPF Appeal Modern Spinning Mills APFC, Coimbatore 27/12/2024
27/03/2025
26/06/2025
21/07/2025
28/08/2025
06/11/2025
12/02/2026
06/05/2026
Sh. A. Deivasigamani, the learned Counsel for the Appellant filed the written submission and prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present. List to 06.05.2026for hearing on Arguments.
70168 15/2019 14B EPF Appeal Kwality Spinning Mills APFC, Coimbatore 10/04/2024
10/07/2024
23/10/2024
21/01/2025
22/04/2025
21/07/2025
16/09/2025
18/12/2025
02/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act.
70169 15/2019 14B EPF Appeal Kwality Spinning Mills APFC, Coimbatore 10/04/2024
10/07/2024
23/10/2024
21/01/2025
22/04/2025
21/07/2025
16/09/2025
18/12/2025
02/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act.
70170 15/2019 14B EPF Appeal Kwality Spinning Mills APFC, Coimbatore 10/04/2024
10/07/2024
23/10/2024
21/01/2025
22/04/2025
21/07/2025
16/09/2025
18/12/2025
02/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act.
70171 15/2019 14B EPF Appeal Kwality Spinning Mills APFC, Coimbatore 10/04/2024
10/07/2024
23/10/2024
21/01/2025
22/04/2025
21/07/2025
16/09/2025
18/12/2025
02/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act.
70172 15/2019 14B EPF Appeal Kwality Spinning Mills APFC, Coimbatore 10/04/2024
10/07/2024
23/10/2024
21/01/2025
22/04/2025
21/07/2025
16/09/2025
18/12/2025
02/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act.
70173 15/2019 14B EPF Appeal Kwality Spinning Mills APFC, Coimbatore 10/04/2024
10/07/2024
23/10/2024
21/01/2025
22/04/2025
21/07/2025
16/09/2025
18/12/2025
02/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act.
70174 15/2019 14B EPF Appeal Kwality Spinning Mills APFC, Coimbatore 10/04/2024
10/07/2024
23/10/2024
21/01/2025
22/04/2025
21/07/2025
16/09/2025
18/12/2025
02/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act.
70175 15/2019 14B EPF Appeal Kwality Spinning Mills APFC, Coimbatore 10/04/2024
10/07/2024
23/10/2024
21/01/2025
22/04/2025
21/07/2025
16/09/2025
18/12/2025
02/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act.
70176 15/2019 14B EPF Appeal Kwality Spinning Mills APFC, Coimbatore 10/04/2024
10/07/2024
23/10/2024
21/01/2025
22/04/2025
21/07/2025
16/09/2025
18/12/2025
02/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act.
70177 CGIT/LC/A/11/2017 SECTION-33A ID ASHWANI KUMAR SINGH & OUTHER SATNA CEMENT WORKS 19/06/2025
05/08/2025
08/10/2025
JUDGEMENT PASSED / NOTIFICATION 13.01.2026 Download
70178 CGIT/LC/A/11/2017 SECTION-33A ID ASHWANI KUMAR SINGH & OUTHER SATNA CEMENT WORKS 19/06/2025
05/08/2025
08/10/2025
JUDGEMENT PASSED / NOTIFICATION 13.01.2026 Download
70179 CGIT/LC/A/11/2017 SECTION-33A ID ASHWANI KUMAR SINGH & OUTHER SATNA CEMENT WORKS 19/06/2025
05/08/2025
08/10/2025
JUDGEMENT PASSED / NOTIFICATION 13.01.2026 Download
70180 31/2019 14B EPF Appeal Udumalpet Town Co-Op Stores Ltd., RPFC, Coimbatore 19/06/2024
26/09/2024
27/12/2024
27/03/2025
26/06/2025
26/08/2025
20/11/2025
26/02/2026
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 29.01.2019 Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law
70181 31/2019 14B EPF Appeal Udumalpet Town Co-Op Stores Ltd., RPFC, Coimbatore 19/06/2024
26/09/2024
27/12/2024
27/03/2025
26/06/2025
26/08/2025
20/11/2025
26/02/2026
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 29.01.2019 Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law
70182 31/2019 14B EPF Appeal Udumalpet Town Co-Op Stores Ltd., RPFC, Coimbatore 19/06/2024
26/09/2024
27/12/2024
27/03/2025
26/06/2025
26/08/2025
20/11/2025
26/02/2026
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 29.01.2019 Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law
70183 31/2019 14B EPF Appeal Udumalpet Town Co-Op Stores Ltd., RPFC, Coimbatore 19/06/2024
26/09/2024
27/12/2024
27/03/2025
26/06/2025
26/08/2025
20/11/2025
26/02/2026
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 29.01.2019 Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law
70184 31/2019 14B EPF Appeal Udumalpet Town Co-Op Stores Ltd., RPFC, Coimbatore 19/06/2024
26/09/2024
27/12/2024
27/03/2025
26/06/2025
26/08/2025
20/11/2025
26/02/2026
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 29.01.2019 Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law
70185 31/2019 14B EPF Appeal Udumalpet Town Co-Op Stores Ltd., RPFC, Coimbatore 19/06/2024
26/09/2024
27/12/2024
27/03/2025
26/06/2025
26/08/2025
20/11/2025
26/02/2026
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 29.01.2019 Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law
70186 31/2019 14B EPF Appeal Udumalpet Town Co-Op Stores Ltd., RPFC, Coimbatore 19/06/2024
26/09/2024
27/12/2024
27/03/2025
26/06/2025
26/08/2025
20/11/2025
26/02/2026
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 29.01.2019 Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law
70187 31/2019 14B EPF Appeal Udumalpet Town Co-Op Stores Ltd., RPFC, Coimbatore 19/06/2024
26/09/2024
27/12/2024
27/03/2025
26/06/2025
26/08/2025
20/11/2025
26/02/2026
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 29.01.2019 Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law
70188 30/2019 14B EPF Appeal M/s. ALPS Presidency APFC, Salem 06/09/2019
12/09/2019
19/09/2019
25/10/2019
07/05/2020
Final Order - Appeal is allowed in part. Copies of the order shall be sent to the parties after withdrawal of the Lock Down by appropriate Government
70189 30/2019 14B EPF Appeal M/s. ALPS Presidency APFC, Salem 06/09/2019
12/09/2019
19/09/2019
25/10/2019
07/05/2020
Final Order - Appeal is allowed in part. Copies of the order shall be sent to the parties after withdrawal of the Lock Down by appropriate Government
70190 30/2019 14B EPF Appeal M/s. ALPS Presidency APFC, Salem 06/09/2019
12/09/2019
19/09/2019
25/10/2019
07/05/2020
Final Order - Appeal is allowed in part. Copies of the order shall be sent to the parties after withdrawal of the Lock Down by appropriate Government
70191 30/2019 14B EPF Appeal M/s. ALPS Presidency APFC, Salem 06/09/2019
12/09/2019
19/09/2019
25/10/2019
07/05/2020
Final Order - Appeal is allowed in part. Copies of the order shall be sent to the parties after withdrawal of the Lock Down by appropriate Government
70192 30/2019 14B EPF Appeal M/s. ALPS Presidency APFC, Salem 06/09/2019
12/09/2019
19/09/2019
25/10/2019
07/05/2020
Final Order - Appeal is allowed in part. Copies of the order shall be sent to the parties after withdrawal of the Lock Down by appropriate Government
70193 CGIT/LC/R/48/2011 SECTION-10 ID SHRI RAM KUMAR SECL 02/12/2021
10/01/2022
AWARD PASS / Notification Received
70194 CGIT/LC/R/48/2011 SECTION-10 ID SHRI RAM KUMAR SECL 02/12/2021
10/01/2022
AWARD PASS / Notification Received
70195 299/2017 7A EPF Appeal Brilliant Tutorials (P) Ltd. RPFC, Chennai 14/06/2019 Orders
70196 534/2017 14B-7Q EPF Appeal Equitas Finance Pvt. Ltd. RPFC, Chennai 06/01/2025
21/02/2025
29/04/2025
17/06/2025
11/08/2025
11/09/2025
26/09/2025
10/10/2025
(Time Bound Appeal ) Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 55% of assessed damages amount.
70197 534/2017 14B-7Q EPF Appeal Equitas Finance Pvt. Ltd. RPFC, Chennai 06/01/2025
21/02/2025
29/04/2025
17/06/2025
11/08/2025
11/09/2025
26/09/2025
10/10/2025
(Time Bound Appeal ) Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 55% of assessed damages amount.
70198 534/2017 14B-7Q EPF Appeal Equitas Finance Pvt. Ltd. RPFC, Chennai 06/01/2025
21/02/2025
29/04/2025
17/06/2025
11/08/2025
11/09/2025
26/09/2025
10/10/2025
(Time Bound Appeal ) Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 55% of assessed damages amount.
70199 534/2017 14B-7Q EPF Appeal Equitas Finance Pvt. Ltd. RPFC, Chennai 06/01/2025
21/02/2025
29/04/2025
17/06/2025
11/08/2025
11/09/2025
26/09/2025
10/10/2025
(Time Bound Appeal ) Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 55% of assessed damages amount.
70200 534/2017 14B-7Q EPF Appeal Equitas Finance Pvt. Ltd. RPFC, Chennai 06/01/2025
21/02/2025
29/04/2025
17/06/2025
11/08/2025
11/09/2025
26/09/2025
10/10/2025
(Time Bound Appeal ) Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 55% of assessed damages amount.