| S.No. | Case No. | Subject | Case Type | Name of Appellant | Respondent | Next Date | Details | Order / Decision | Edit |
|---|---|---|---|---|---|---|---|---|---|
| 58451 | CGIT-2/EPFA/99 of 2019 | 14-B | EPF Appeal | Shivnagar Vidya Prasarak Mandals Institute | RPFC, Pune (2) CBT, New Delhi |
23/12/2025 27/04/2026 29/06/2026 27/10/2026 |
Final Arguments | ||
| 58452 | CGIT-2/EPFA/99 of 2019 | 14-B | EPF Appeal | Shivnagar Vidya Prasarak Mandals Institute | RPFC, Pune (2) CBT, New Delhi |
23/12/2025 27/04/2026 29/06/2026 27/10/2026 |
Final Arguments | ||
| 58453 | CGIT-2/EPFA/99 of 2019 | 14-B | EPF Appeal | Shivnagar Vidya Prasarak Mandals Institute | RPFC, Pune (2) CBT, New Delhi |
23/12/2025 27/04/2026 29/06/2026 27/10/2026 |
Final Arguments | ||
| 58454 | 78/2019 | 14B | EPF Appeal | Thangachi Ammapatti Primary Co-op. Bank. | APFC, Madurai |
23/11/2023 25/04/2024 25/07/2024 05/11/2024 11/02/2025 06/05/2025 04/08/2025 10/10/2025 28/10/2025 |
Final Orders - The Appeal is dismissed. | ||
| 58455 | 78/2019 | 14B | EPF Appeal | Thangachi Ammapatti Primary Co-op. Bank. | APFC, Madurai |
23/11/2023 25/04/2024 25/07/2024 05/11/2024 11/02/2025 06/05/2025 04/08/2025 10/10/2025 28/10/2025 |
Final Orders - The Appeal is dismissed. | ||
| 58456 | 78/2019 | 14B | EPF Appeal | Thangachi Ammapatti Primary Co-op. Bank. | APFC, Madurai |
23/11/2023 25/04/2024 25/07/2024 05/11/2024 11/02/2025 06/05/2025 04/08/2025 10/10/2025 28/10/2025 |
Final Orders - The Appeal is dismissed. | ||
| 58457 | 78/2019 | 14B | EPF Appeal | Thangachi Ammapatti Primary Co-op. Bank. | APFC, Madurai |
23/11/2023 25/04/2024 25/07/2024 05/11/2024 11/02/2025 06/05/2025 04/08/2025 10/10/2025 28/10/2025 |
Final Orders - The Appeal is dismissed. | ||
| 58458 | 78/2019 | 14B | EPF Appeal | Thangachi Ammapatti Primary Co-op. Bank. | APFC, Madurai |
23/11/2023 25/04/2024 25/07/2024 05/11/2024 11/02/2025 06/05/2025 04/08/2025 10/10/2025 28/10/2025 |
Final Orders - The Appeal is dismissed. | ||
| 58459 | 78/2019 | 14B | EPF Appeal | Thangachi Ammapatti Primary Co-op. Bank. | APFC, Madurai |
23/11/2023 25/04/2024 25/07/2024 05/11/2024 11/02/2025 06/05/2025 04/08/2025 10/10/2025 28/10/2025 |
Final Orders - The Appeal is dismissed. | ||
| 58460 | 78/2019 | 14B | EPF Appeal | Thangachi Ammapatti Primary Co-op. Bank. | APFC, Madurai |
23/11/2023 25/04/2024 25/07/2024 05/11/2024 11/02/2025 06/05/2025 04/08/2025 10/10/2025 28/10/2025 |
Final Orders - The Appeal is dismissed. | ||
| 58461 | 78/2019 | 14B | EPF Appeal | Thangachi Ammapatti Primary Co-op. Bank. | APFC, Madurai |
23/11/2023 25/04/2024 25/07/2024 05/11/2024 11/02/2025 06/05/2025 04/08/2025 10/10/2025 28/10/2025 |
Final Orders - The Appeal is dismissed. | ||
| 58462 | 78/2019 | 14B | EPF Appeal | Thangachi Ammapatti Primary Co-op. Bank. | APFC, Madurai |
23/11/2023 25/04/2024 25/07/2024 05/11/2024 11/02/2025 06/05/2025 04/08/2025 10/10/2025 28/10/2025 |
Final Orders - The Appeal is dismissed. | ||
| 58463 | 79/2019 | 14B | EPF Appeal | Boduvarpatty Primary Agri. Co-op. Bank | APFC, Madurai |
26/02/2025 21/05/2025 19/08/2025 06/11/2025 12/02/2026 |
Final Order - 32% of assessed amount passed by Respondent orders dated 19.02.2019 & 13.03.2019 are waived off. Respondent will recover remaining 68% of assessed amount of damages u/s. 14B from Appellant establishment in accordance with law. | ||
| 58464 | 79/2019 | 14B | EPF Appeal | Boduvarpatty Primary Agri. Co-op. Bank | APFC, Madurai |
26/02/2025 21/05/2025 19/08/2025 06/11/2025 12/02/2026 |
Final Order - 32% of assessed amount passed by Respondent orders dated 19.02.2019 & 13.03.2019 are waived off. Respondent will recover remaining 68% of assessed amount of damages u/s. 14B from Appellant establishment in accordance with law. | ||
| 58465 | 79/2019 | 14B | EPF Appeal | Boduvarpatty Primary Agri. Co-op. Bank | APFC, Madurai |
26/02/2025 21/05/2025 19/08/2025 06/11/2025 12/02/2026 |
Final Order - 32% of assessed amount passed by Respondent orders dated 19.02.2019 & 13.03.2019 are waived off. Respondent will recover remaining 68% of assessed amount of damages u/s. 14B from Appellant establishment in accordance with law. | ||
| 58466 | 79/2019 | 14B | EPF Appeal | Boduvarpatty Primary Agri. Co-op. Bank | APFC, Madurai |
26/02/2025 21/05/2025 19/08/2025 06/11/2025 12/02/2026 |
Final Order - 32% of assessed amount passed by Respondent orders dated 19.02.2019 & 13.03.2019 are waived off. Respondent will recover remaining 68% of assessed amount of damages u/s. 14B from Appellant establishment in accordance with law. | ||
| 58467 | 79/2019 | 14B | EPF Appeal | Boduvarpatty Primary Agri. Co-op. Bank | APFC, Madurai |
26/02/2025 21/05/2025 19/08/2025 06/11/2025 12/02/2026 |
Final Order - 32% of assessed amount passed by Respondent orders dated 19.02.2019 & 13.03.2019 are waived off. Respondent will recover remaining 68% of assessed amount of damages u/s. 14B from Appellant establishment in accordance with law. | ||
| 58468 | 80/2019 | 14B | EPF Appeal | Mannar Thirumalai Naickar College | APFC, Madurai |
24/05/2024 19/08/2024 19/11/2024 26/02/2025 21/05/2025 19/08/2025 06/11/2025 20/03/2026 |
Final Order - The Appeal stands dismissed for want of prosecution. / M. P. No. 16 of 2026 for restoration of the Appeal stands dismissed on grounds of limitation. | ||
| 58469 | 80/2019 | 14B | EPF Appeal | Mannar Thirumalai Naickar College | APFC, Madurai |
24/05/2024 19/08/2024 19/11/2024 26/02/2025 21/05/2025 19/08/2025 06/11/2025 20/03/2026 |
Final Order - The Appeal stands dismissed for want of prosecution. / M. P. No. 16 of 2026 for restoration of the Appeal stands dismissed on grounds of limitation. | ||
| 58470 | 80/2019 | 14B | EPF Appeal | Mannar Thirumalai Naickar College | APFC, Madurai |
24/05/2024 19/08/2024 19/11/2024 26/02/2025 21/05/2025 19/08/2025 06/11/2025 20/03/2026 |
Final Order - The Appeal stands dismissed for want of prosecution. / M. P. No. 16 of 2026 for restoration of the Appeal stands dismissed on grounds of limitation. | ||
| 58471 | 80/2019 | 14B | EPF Appeal | Mannar Thirumalai Naickar College | APFC, Madurai |
24/05/2024 19/08/2024 19/11/2024 26/02/2025 21/05/2025 19/08/2025 06/11/2025 20/03/2026 |
Final Order - The Appeal stands dismissed for want of prosecution. / M. P. No. 16 of 2026 for restoration of the Appeal stands dismissed on grounds of limitation. | ||
| 58472 | 80/2019 | 14B | EPF Appeal | Mannar Thirumalai Naickar College | APFC, Madurai |
24/05/2024 19/08/2024 19/11/2024 26/02/2025 21/05/2025 19/08/2025 06/11/2025 20/03/2026 |
Final Order - The Appeal stands dismissed for want of prosecution. / M. P. No. 16 of 2026 for restoration of the Appeal stands dismissed on grounds of limitation. | ||
| 58473 | 80/2019 | 14B | EPF Appeal | Mannar Thirumalai Naickar College | APFC, Madurai |
24/05/2024 19/08/2024 19/11/2024 26/02/2025 21/05/2025 19/08/2025 06/11/2025 20/03/2026 |
Final Order - The Appeal stands dismissed for want of prosecution. / M. P. No. 16 of 2026 for restoration of the Appeal stands dismissed on grounds of limitation. | ||
| 58474 | 80/2019 | 14B | EPF Appeal | Mannar Thirumalai Naickar College | APFC, Madurai |
24/05/2024 19/08/2024 19/11/2024 26/02/2025 21/05/2025 19/08/2025 06/11/2025 20/03/2026 |
Final Order - The Appeal stands dismissed for want of prosecution. / M. P. No. 16 of 2026 for restoration of the Appeal stands dismissed on grounds of limitation. | ||
| 58475 | 80/2019 | 14B | EPF Appeal | Mannar Thirumalai Naickar College | APFC, Madurai |
24/05/2024 19/08/2024 19/11/2024 26/02/2025 21/05/2025 19/08/2025 06/11/2025 20/03/2026 |
Final Order - The Appeal stands dismissed for want of prosecution. / M. P. No. 16 of 2026 for restoration of the Appeal stands dismissed on grounds of limitation. | ||
| 58476 | 81/2019 | 14B | EPF Appeal | Pullicar Mills Ltd., | RPFC, Salem |
06/08/2024 07/11/2024 13/02/2025 06/05/2025 04/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 50% of the damages amount. | ||
| 58477 | 81/2019 | 14B | EPF Appeal | Pullicar Mills Ltd., | RPFC, Salem |
06/08/2024 07/11/2024 13/02/2025 06/05/2025 04/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 50% of the damages amount. | ||
| 58478 | 81/2019 | 14B | EPF Appeal | Pullicar Mills Ltd., | RPFC, Salem |
06/08/2024 07/11/2024 13/02/2025 06/05/2025 04/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 50% of the damages amount. | ||
| 58479 | 81/2019 | 14B | EPF Appeal | Pullicar Mills Ltd., | RPFC, Salem |
06/08/2024 07/11/2024 13/02/2025 06/05/2025 04/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 50% of the damages amount. | ||
| 58480 | 81/2019 | 14B | EPF Appeal | Pullicar Mills Ltd., | RPFC, Salem |
06/08/2024 07/11/2024 13/02/2025 06/05/2025 04/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 50% of the damages amount. | ||
| 58481 | 81/2019 | 14B | EPF Appeal | Pullicar Mills Ltd., | RPFC, Salem |
06/08/2024 07/11/2024 13/02/2025 06/05/2025 04/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 50% of the damages amount. | ||
| 58482 | 82/2019 | 14B | EPF Appeal | Sri Varadharajan Polytechnic College | APFC, Trichy |
26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 |
Final Order - The Appeal is dismissed. | ||
| 58483 | 82/2019 | 14B | EPF Appeal | Sri Varadharajan Polytechnic College | APFC, Trichy |
26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 |
Final Order - The Appeal is dismissed. | ||
| 58484 | 82/2019 | 14B | EPF Appeal | Sri Varadharajan Polytechnic College | APFC, Trichy |
26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 |
Final Order - The Appeal is dismissed. | ||
| 58485 | 82/2019 | 14B | EPF Appeal | Sri Varadharajan Polytechnic College | APFC, Trichy |
26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 |
Final Order - The Appeal is dismissed. | ||
| 58486 | 82/2019 | 14B | EPF Appeal | Sri Varadharajan Polytechnic College | APFC, Trichy |
26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 |
Final Order - The Appeal is dismissed. | ||
| 58487 | 82/2019 | 14B | EPF Appeal | Sri Varadharajan Polytechnic College | APFC, Trichy |
26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 |
Final Order - The Appeal is dismissed. | ||
| 58488 | 83/2019 | 14B | EPF Appeal | Mccoy Clothing Pvt. Ltd., | RPFC-Chennai |
12/12/2024 12/03/2025 11/06/2025 01/08/2025 08/10/2025 14/10/2025 19/01/2026 17/04/2026 |
Final Order - 37% of the assessed amount passed by the Respondent order dated 22.01.2019 is waived. The Respondent will recover remaining 63% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 58489 | 83/2019 | 14B | EPF Appeal | Mccoy Clothing Pvt. Ltd., | RPFC-Chennai |
12/12/2024 12/03/2025 11/06/2025 01/08/2025 08/10/2025 14/10/2025 19/01/2026 17/04/2026 |
Final Order - 37% of the assessed amount passed by the Respondent order dated 22.01.2019 is waived. The Respondent will recover remaining 63% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 58490 | 83/2019 | 14B | EPF Appeal | Mccoy Clothing Pvt. Ltd., | RPFC-Chennai |
12/12/2024 12/03/2025 11/06/2025 01/08/2025 08/10/2025 14/10/2025 19/01/2026 17/04/2026 |
Final Order - 37% of the assessed amount passed by the Respondent order dated 22.01.2019 is waived. The Respondent will recover remaining 63% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 58491 | 83/2019 | 14B | EPF Appeal | Mccoy Clothing Pvt. Ltd., | RPFC-Chennai |
12/12/2024 12/03/2025 11/06/2025 01/08/2025 08/10/2025 14/10/2025 19/01/2026 17/04/2026 |
Final Order - 37% of the assessed amount passed by the Respondent order dated 22.01.2019 is waived. The Respondent will recover remaining 63% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 58492 | 83/2019 | 14B | EPF Appeal | Mccoy Clothing Pvt. Ltd., | RPFC-Chennai |
12/12/2024 12/03/2025 11/06/2025 01/08/2025 08/10/2025 14/10/2025 19/01/2026 17/04/2026 |
Final Order - 37% of the assessed amount passed by the Respondent order dated 22.01.2019 is waived. The Respondent will recover remaining 63% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 58493 | 83/2019 | 14B | EPF Appeal | Mccoy Clothing Pvt. Ltd., | RPFC-Chennai |
12/12/2024 12/03/2025 11/06/2025 01/08/2025 08/10/2025 14/10/2025 19/01/2026 17/04/2026 |
Final Order - 37% of the assessed amount passed by the Respondent order dated 22.01.2019 is waived. The Respondent will recover remaining 63% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 58494 | 83/2019 | 14B | EPF Appeal | Mccoy Clothing Pvt. Ltd., | RPFC-Chennai |
12/12/2024 12/03/2025 11/06/2025 01/08/2025 08/10/2025 14/10/2025 19/01/2026 17/04/2026 |
Final Order - 37% of the assessed amount passed by the Respondent order dated 22.01.2019 is waived. The Respondent will recover remaining 63% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 58495 | 83/2019 | 14B | EPF Appeal | Mccoy Clothing Pvt. Ltd., | RPFC-Chennai |
12/12/2024 12/03/2025 11/06/2025 01/08/2025 08/10/2025 14/10/2025 19/01/2026 17/04/2026 |
Final Order - 37% of the assessed amount passed by the Respondent order dated 22.01.2019 is waived. The Respondent will recover remaining 63% of the assessed amount from the Appellant establishment in accordance with law. | ||
| 58496 | 84/2019 | 14B | EPF Appeal | Sri Raju Cotton Mills | APFC, Madurai |
19/11/2024 26/02/2025 21/05/2025 19/08/2025 06/11/2025 12/02/2026 07/05/2026 13/07/2026 |
Final Order- 50% of Assessed amount determined by Respondent's order dtd. 12.03.2019 has been waived & remaining 50% of assessed amount must be paid within 3 months from order date to Respondent. Respondent is instructed to adjust amount, if Appellant has | ||
| 58497 | 84/2019 | 14B | EPF Appeal | Sri Raju Cotton Mills | APFC, Madurai |
19/11/2024 26/02/2025 21/05/2025 19/08/2025 06/11/2025 12/02/2026 07/05/2026 13/07/2026 |
Final Order- 50% of Assessed amount determined by Respondent's order dtd. 12.03.2019 has been waived & remaining 50% of assessed amount must be paid within 3 months from order date to Respondent. Respondent is instructed to adjust amount, if Appellant has | ||
| 58498 | 84/2019 | 14B | EPF Appeal | Sri Raju Cotton Mills | APFC, Madurai |
19/11/2024 26/02/2025 21/05/2025 19/08/2025 06/11/2025 12/02/2026 07/05/2026 13/07/2026 |
Final Order- 50% of Assessed amount determined by Respondent's order dtd. 12.03.2019 has been waived & remaining 50% of assessed amount must be paid within 3 months from order date to Respondent. Respondent is instructed to adjust amount, if Appellant has | ||
| 58499 | 84/2019 | 14B | EPF Appeal | Sri Raju Cotton Mills | APFC, Madurai |
19/11/2024 26/02/2025 21/05/2025 19/08/2025 06/11/2025 12/02/2026 07/05/2026 13/07/2026 |
Final Order- 50% of Assessed amount determined by Respondent's order dtd. 12.03.2019 has been waived & remaining 50% of assessed amount must be paid within 3 months from order date to Respondent. Respondent is instructed to adjust amount, if Appellant has | ||
| 58500 | 84/2019 | 14B | EPF Appeal | Sri Raju Cotton Mills | APFC, Madurai |
19/11/2024 26/02/2025 21/05/2025 19/08/2025 06/11/2025 12/02/2026 07/05/2026 13/07/2026 |
Final Order- 50% of Assessed amount determined by Respondent's order dtd. 12.03.2019 has been waived & remaining 50% of assessed amount must be paid within 3 months from order date to Respondent. Respondent is instructed to adjust amount, if Appellant has |