| S.No. | Case No. | Subject | Case Type | Name of Appellant | Respondent | Next Date | Details | Order / Decision | Edit |
|---|---|---|---|---|---|---|---|---|---|
| 73551 | 52/2017 | 14B | EPF Appeal | Scotts Garments Ltd. | RPFC-I, Coimbatore |
26/09/2024 27/12/2024 27/03/2025 26/06/2025 13/08/2025 29/10/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 75% of the assessed amount of damages u/s. 14B of the Act. | ||
| 73552 | 52/2017 | 14B | EPF Appeal | Scotts Garments Ltd. | RPFC-I, Coimbatore |
26/09/2024 27/12/2024 27/03/2025 26/06/2025 13/08/2025 29/10/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 75% of the assessed amount of damages u/s. 14B of the Act. | ||
| 73553 | 52/2017 | 14B | EPF Appeal | Scotts Garments Ltd. | RPFC-I, Coimbatore |
26/09/2024 27/12/2024 27/03/2025 26/06/2025 13/08/2025 29/10/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 75% of the assessed amount of damages u/s. 14B of the Act. | ||
| 73554 | 52/2017 | 14B | EPF Appeal | Scotts Garments Ltd. | RPFC-I, Coimbatore |
26/09/2024 27/12/2024 27/03/2025 26/06/2025 13/08/2025 29/10/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 75% of the assessed amount of damages u/s. 14B of the Act. | ||
| 73555 | 52/2017 | 14B | EPF Appeal | Scotts Garments Ltd. | RPFC-I, Coimbatore |
26/09/2024 27/12/2024 27/03/2025 26/06/2025 13/08/2025 29/10/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 75% of the assessed amount of damages u/s. 14B of the Act. | ||
| 73556 | 52/2017 | 14B | EPF Appeal | Scotts Garments Ltd. | RPFC-I, Coimbatore |
26/09/2024 27/12/2024 27/03/2025 26/06/2025 13/08/2025 29/10/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 75% of the assessed amount of damages u/s. 14B of the Act. | ||
| 73557 | 51/2017 | 14B | EPF Appeal | Maruthamalai Sri Murugan Textiles | APFC, Coimbatore |
07/08/2024 08/11/2024 14/02/2025 09/05/2025 07/08/2025 16/10/2025 22/01/2026 03/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 73558 | 51/2017 | 14B | EPF Appeal | Maruthamalai Sri Murugan Textiles | APFC, Coimbatore |
07/08/2024 08/11/2024 14/02/2025 09/05/2025 07/08/2025 16/10/2025 22/01/2026 03/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 73559 | 51/2017 | 14B | EPF Appeal | Maruthamalai Sri Murugan Textiles | APFC, Coimbatore |
07/08/2024 08/11/2024 14/02/2025 09/05/2025 07/08/2025 16/10/2025 22/01/2026 03/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 73560 | 51/2017 | 14B | EPF Appeal | Maruthamalai Sri Murugan Textiles | APFC, Coimbatore |
07/08/2024 08/11/2024 14/02/2025 09/05/2025 07/08/2025 16/10/2025 22/01/2026 03/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 73561 | 51/2017 | 14B | EPF Appeal | Maruthamalai Sri Murugan Textiles | APFC, Coimbatore |
07/08/2024 08/11/2024 14/02/2025 09/05/2025 07/08/2025 16/10/2025 22/01/2026 03/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 73562 | 51/2017 | 14B | EPF Appeal | Maruthamalai Sri Murugan Textiles | APFC, Coimbatore |
07/08/2024 08/11/2024 14/02/2025 09/05/2025 07/08/2025 16/10/2025 22/01/2026 03/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 73563 | 51/2017 | 14B | EPF Appeal | Maruthamalai Sri Murugan Textiles | APFC, Coimbatore |
07/08/2024 08/11/2024 14/02/2025 09/05/2025 07/08/2025 16/10/2025 22/01/2026 03/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 73564 | 51/2017 | 14B | EPF Appeal | Maruthamalai Sri Murugan Textiles | APFC, Coimbatore |
07/08/2024 08/11/2024 14/02/2025 09/05/2025 07/08/2025 16/10/2025 22/01/2026 03/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 73565 | 665/2018 | 14B | EPF Appeal | Velan Hotel Greenfields Ltd. | APFC, Coimbatore |
19/06/2024 26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 17/02/2026 |
Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 73566 | 665/2018 | 14B | EPF Appeal | Velan Hotel Greenfields Ltd. | APFC, Coimbatore |
19/06/2024 26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 17/02/2026 |
Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 73567 | 665/2018 | 14B | EPF Appeal | Velan Hotel Greenfields Ltd. | APFC, Coimbatore |
19/06/2024 26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 17/02/2026 |
Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 73568 | 665/2018 | 14B | EPF Appeal | Velan Hotel Greenfields Ltd. | APFC, Coimbatore |
19/06/2024 26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 17/02/2026 |
Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 73569 | 665/2018 | 14B | EPF Appeal | Velan Hotel Greenfields Ltd. | APFC, Coimbatore |
19/06/2024 26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 17/02/2026 |
Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 73570 | 665/2018 | 14B | EPF Appeal | Velan Hotel Greenfields Ltd. | APFC, Coimbatore |
19/06/2024 26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 17/02/2026 |
Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 73571 | 665/2018 | 14B | EPF Appeal | Velan Hotel Greenfields Ltd. | APFC, Coimbatore |
19/06/2024 26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 17/02/2026 |
Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 73572 | 665/2018 | 14B | EPF Appeal | Velan Hotel Greenfields Ltd. | APFC, Coimbatore |
19/06/2024 26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 17/02/2026 |
Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 73573 | 661/2018 | 14B | EPF Appeal | Cotton Blossom | RPFC, Coimbatore |
26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 26/02/2026 |
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 07.09.2018 Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law | ||
| 73574 | 661/2018 | 14B | EPF Appeal | Cotton Blossom | RPFC, Coimbatore |
26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 26/02/2026 |
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 07.09.2018 Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law | ||
| 73575 | 661/2018 | 14B | EPF Appeal | Cotton Blossom | RPFC, Coimbatore |
26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 26/02/2026 |
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 07.09.2018 Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law | ||
| 73576 | 661/2018 | 14B | EPF Appeal | Cotton Blossom | RPFC, Coimbatore |
26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 26/02/2026 |
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 07.09.2018 Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law | ||
| 73577 | 661/2018 | 14B | EPF Appeal | Cotton Blossom | RPFC, Coimbatore |
26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 26/02/2026 |
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 07.09.2018 Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law | ||
| 73578 | 661/2018 | 14B | EPF Appeal | Cotton Blossom | RPFC, Coimbatore |
26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 26/02/2026 |
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 07.09.2018 Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law | ||
| 73579 | 661/2018 | 14B | EPF Appeal | Cotton Blossom | RPFC, Coimbatore |
26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 26/02/2026 |
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 07.09.2018 Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law | ||
| 73580 | 638/2018 | 7A | EPF Appeal | Spine Arthroscopic and Joint Replacement Centre Pvt. Ltd., | APFC, Coimbatore |
19/06/2024 26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 26/02/2026 20/05/2026 07/08/2026 |
M/s. P. Thangaraj, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. None appeared on behalf of the Respondent. List to 07.08.2026 for hearing on Arguments/filing of written submission. | ||
| 73581 | 638/2018 | 7A | EPF Appeal | Spine Arthroscopic and Joint Replacement Centre Pvt. Ltd., | APFC, Coimbatore |
19/06/2024 26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 26/02/2026 20/05/2026 07/08/2026 |
M/s. P. Thangaraj, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. None appeared on behalf of the Respondent. List to 07.08.2026 for hearing on Arguments/filing of written submission. | ||
| 73582 | 638/2018 | 7A | EPF Appeal | Spine Arthroscopic and Joint Replacement Centre Pvt. Ltd., | APFC, Coimbatore |
19/06/2024 26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 26/02/2026 20/05/2026 07/08/2026 |
M/s. P. Thangaraj, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. None appeared on behalf of the Respondent. List to 07.08.2026 for hearing on Arguments/filing of written submission. | ||
| 73583 | 638/2018 | 7A | EPF Appeal | Spine Arthroscopic and Joint Replacement Centre Pvt. Ltd., | APFC, Coimbatore |
19/06/2024 26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 26/02/2026 20/05/2026 07/08/2026 |
M/s. P. Thangaraj, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. None appeared on behalf of the Respondent. List to 07.08.2026 for hearing on Arguments/filing of written submission. | ||
| 73584 | 638/2018 | 7A | EPF Appeal | Spine Arthroscopic and Joint Replacement Centre Pvt. Ltd., | APFC, Coimbatore |
19/06/2024 26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 26/02/2026 20/05/2026 07/08/2026 |
M/s. P. Thangaraj, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. None appeared on behalf of the Respondent. List to 07.08.2026 for hearing on Arguments/filing of written submission. | ||
| 73585 | 638/2018 | 7A | EPF Appeal | Spine Arthroscopic and Joint Replacement Centre Pvt. Ltd., | APFC, Coimbatore |
19/06/2024 26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 26/02/2026 20/05/2026 07/08/2026 |
M/s. P. Thangaraj, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. None appeared on behalf of the Respondent. List to 07.08.2026 for hearing on Arguments/filing of written submission. | ||
| 73586 | 638/2018 | 7A | EPF Appeal | Spine Arthroscopic and Joint Replacement Centre Pvt. Ltd., | APFC, Coimbatore |
19/06/2024 26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 26/02/2026 20/05/2026 07/08/2026 |
M/s. P. Thangaraj, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. None appeared on behalf of the Respondent. List to 07.08.2026 for hearing on Arguments/filing of written submission. | ||
| 73587 | 638/2018 | 7A | EPF Appeal | Spine Arthroscopic and Joint Replacement Centre Pvt. Ltd., | APFC, Coimbatore |
19/06/2024 26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 26/02/2026 20/05/2026 07/08/2026 |
M/s. P. Thangaraj, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. None appeared on behalf of the Respondent. List to 07.08.2026 for hearing on Arguments/filing of written submission. | ||
| 73588 | 638/2018 | 7A | EPF Appeal | Spine Arthroscopic and Joint Replacement Centre Pvt. Ltd., | APFC, Coimbatore |
19/06/2024 26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 26/02/2026 20/05/2026 07/08/2026 |
M/s. P. Thangaraj, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. None appeared on behalf of the Respondent. List to 07.08.2026 for hearing on Arguments/filing of written submission. | ||
| 73589 | 638/2018 | 7A | EPF Appeal | Spine Arthroscopic and Joint Replacement Centre Pvt. Ltd., | APFC, Coimbatore |
19/06/2024 26/09/2024 27/12/2024 27/03/2025 26/06/2025 26/08/2025 20/11/2025 26/02/2026 20/05/2026 07/08/2026 |
M/s. P. Thangaraj, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. None appeared on behalf of the Respondent. List to 07.08.2026 for hearing on Arguments/filing of written submission. | ||
| 73590 | 587/2018 | 14B - 7Q | EPF Appeal | Red Leaf Technologies Pvt. Ltd | APFC, Coimbatore |
27/12/2024 27/03/2025 26/06/2025 21/07/2025 16/09/2025 18/12/2025 02/02/2026 |
(Special Campaign) Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 73591 | 587/2018 | 14B - 7Q | EPF Appeal | Red Leaf Technologies Pvt. Ltd | APFC, Coimbatore |
27/12/2024 27/03/2025 26/06/2025 21/07/2025 16/09/2025 18/12/2025 02/02/2026 |
(Special Campaign) Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 73592 | 587/2018 | 14B - 7Q | EPF Appeal | Red Leaf Technologies Pvt. Ltd | APFC, Coimbatore |
27/12/2024 27/03/2025 26/06/2025 21/07/2025 16/09/2025 18/12/2025 02/02/2026 |
(Special Campaign) Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 73593 | 587/2018 | 14B - 7Q | EPF Appeal | Red Leaf Technologies Pvt. Ltd | APFC, Coimbatore |
27/12/2024 27/03/2025 26/06/2025 21/07/2025 16/09/2025 18/12/2025 02/02/2026 |
(Special Campaign) Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 73594 | 587/2018 | 14B - 7Q | EPF Appeal | Red Leaf Technologies Pvt. Ltd | APFC, Coimbatore |
27/12/2024 27/03/2025 26/06/2025 21/07/2025 16/09/2025 18/12/2025 02/02/2026 |
(Special Campaign) Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 73595 | 587/2018 | 14B - 7Q | EPF Appeal | Red Leaf Technologies Pvt. Ltd | APFC, Coimbatore |
27/12/2024 27/03/2025 26/06/2025 21/07/2025 16/09/2025 18/12/2025 02/02/2026 |
(Special Campaign) Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 73596 | 587/2018 | 14B - 7Q | EPF Appeal | Red Leaf Technologies Pvt. Ltd | APFC, Coimbatore |
27/12/2024 27/03/2025 26/06/2025 21/07/2025 16/09/2025 18/12/2025 02/02/2026 |
(Special Campaign) Final Order - The Appeal stands dismissed for want of prosecution. | ||
| 73597 | 56/2019 | 7A | EPF Appeal | Bharathiyar University | RPFC,- I Coimbatore | 12/04/2019 | Admission | ||
| 73598 | 476/2018 | 7A | EPF Appeal | Devarshola Estate | RPFC, Coimbatore |
11/02/2025 06/05/2025 04/08/2025 10/10/2025 09/01/2026 15/04/2026 24/06/2026 27/08/2026 |
M/s. M. Aishwariya, the learned Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. R. Vishnu, the Counsel on behalf of the Respondent is present. List to 27.08.2026 for hearing on Arguments. | ||
| 73599 | 476/2018 | 7A | EPF Appeal | Devarshola Estate | RPFC, Coimbatore |
11/02/2025 06/05/2025 04/08/2025 10/10/2025 09/01/2026 15/04/2026 24/06/2026 27/08/2026 |
M/s. M. Aishwariya, the learned Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. R. Vishnu, the Counsel on behalf of the Respondent is present. List to 27.08.2026 for hearing on Arguments. | ||
| 73600 | 476/2018 | 7A | EPF Appeal | Devarshola Estate | RPFC, Coimbatore |
11/02/2025 06/05/2025 04/08/2025 10/10/2025 09/01/2026 15/04/2026 24/06/2026 27/08/2026 |
M/s. M. Aishwariya, the learned Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. R. Vishnu, the Counsel on behalf of the Respondent is present. List to 27.08.2026 for hearing on Arguments. |