Cause List
| S.No. | Case No. | Subject | Case Type | Name of Appellant | Respondent | Next Date | Details | Order / Decision | Edit |
|---|---|---|---|---|---|---|---|---|---|
| 34801 | 56/2022 | 14B | EPF Appeal | Golden Rock Zone Amma Unavagam | APFC (PDC), Trichy |
20/02/2024 26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 |
Final Order - The Appeal is partly allowed. | ||
| 34802 | 56/2022 | 14B | EPF Appeal | Golden Rock Zone Amma Unavagam | APFC (PDC), Trichy |
20/02/2024 26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 |
Final Order - The Appeal is partly allowed. | ||
| 34803 | 56/2022 | 14B | EPF Appeal | Golden Rock Zone Amma Unavagam | APFC (PDC), Trichy |
20/02/2024 26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 |
Final Order - The Appeal is partly allowed. | ||
| 34804 | 56/2022 | 14B | EPF Appeal | Golden Rock Zone Amma Unavagam | APFC (PDC), Trichy |
20/02/2024 26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 |
Final Order - The Appeal is partly allowed. | ||
| 34805 | 56/2022 | 14B | EPF Appeal | Golden Rock Zone Amma Unavagam | APFC (PDC), Trichy |
20/02/2024 26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 |
Final Order - The Appeal is partly allowed. | ||
| 34806 | 56/2022 | 14B | EPF Appeal | Golden Rock Zone Amma Unavagam | APFC (PDC), Trichy |
20/02/2024 26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 |
Final Order - The Appeal is partly allowed. | ||
| 34807 | 56/2022 | 14B | EPF Appeal | Golden Rock Zone Amma Unavagam | APFC (PDC), Trichy |
20/02/2024 26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 |
Final Order - The Appeal is partly allowed. | ||
| 34808 | 57/2022 | 14B | EPF Appeal | Loocust Incorp Apparel Export Pvt. Ltd., | RPFC-II, Salem |
26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 13/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. The penalty imposed by the Respondent is reduced to 50%. | ||
| 34809 | 57/2022 | 14B | EPF Appeal | Loocust Incorp Apparel Export Pvt. Ltd., | RPFC-II, Salem |
26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 13/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. The penalty imposed by the Respondent is reduced to 50%. | ||
| 34810 | 57/2022 | 14B | EPF Appeal | Loocust Incorp Apparel Export Pvt. Ltd., | RPFC-II, Salem |
26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 13/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. The penalty imposed by the Respondent is reduced to 50%. | ||
| 34811 | 57/2022 | 14B | EPF Appeal | Loocust Incorp Apparel Export Pvt. Ltd., | RPFC-II, Salem |
26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 13/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. The penalty imposed by the Respondent is reduced to 50%. | ||
| 34812 | 57/2022 | 14B | EPF Appeal | Loocust Incorp Apparel Export Pvt. Ltd., | RPFC-II, Salem |
26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 13/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. The penalty imposed by the Respondent is reduced to 50%. | ||
| 34813 | 57/2022 | 14B | EPF Appeal | Loocust Incorp Apparel Export Pvt. Ltd., | RPFC-II, Salem |
26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 13/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. The penalty imposed by the Respondent is reduced to 50%. | ||
| 34814 | 57/2022 | 14B | EPF Appeal | Loocust Incorp Apparel Export Pvt. Ltd., | RPFC-II, Salem |
26/04/2024 05/08/2024 06/11/2024 12/02/2025 07/05/2025 05/08/2025 13/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. The penalty imposed by the Respondent is reduced to 50%. | ||
| 34815 | 53/2022 | 14B | EPF Appeal | Tari Bio Tec | APFC, Trichy |
13/02/2025 08/05/2025 06/08/2025 08/10/2025 14/10/2025 19/01/2026 17/04/2026 01/07/2026 |
M/s. J. Pradeep Solomon Raj, the learned Counsel on behalf of the Appellant is present. M/s. R. Thirunavukarasu, the Counsel on behalf of the Respondent prays for time to file the Counter Statement. List to 01.07.2026 for filing the Counter Statement as l | ||
| 34816 | 53/2022 | 14B | EPF Appeal | Tari Bio Tec | APFC, Trichy |
13/02/2025 08/05/2025 06/08/2025 08/10/2025 14/10/2025 19/01/2026 17/04/2026 01/07/2026 |
M/s. J. Pradeep Solomon Raj, the learned Counsel on behalf of the Appellant is present. M/s. R. Thirunavukarasu, the Counsel on behalf of the Respondent prays for time to file the Counter Statement. List to 01.07.2026 for filing the Counter Statement as l | ||
| 34817 | 53/2022 | 14B | EPF Appeal | Tari Bio Tec | APFC, Trichy |
13/02/2025 08/05/2025 06/08/2025 08/10/2025 14/10/2025 19/01/2026 17/04/2026 01/07/2026 |
M/s. J. Pradeep Solomon Raj, the learned Counsel on behalf of the Appellant is present. M/s. R. Thirunavukarasu, the Counsel on behalf of the Respondent prays for time to file the Counter Statement. List to 01.07.2026 for filing the Counter Statement as l | ||
| 34818 | 53/2022 | 14B | EPF Appeal | Tari Bio Tec | APFC, Trichy |
13/02/2025 08/05/2025 06/08/2025 08/10/2025 14/10/2025 19/01/2026 17/04/2026 01/07/2026 |
M/s. J. Pradeep Solomon Raj, the learned Counsel on behalf of the Appellant is present. M/s. R. Thirunavukarasu, the Counsel on behalf of the Respondent prays for time to file the Counter Statement. List to 01.07.2026 for filing the Counter Statement as l | ||
| 34819 | 53/2022 | 14B | EPF Appeal | Tari Bio Tec | APFC, Trichy |
13/02/2025 08/05/2025 06/08/2025 08/10/2025 14/10/2025 19/01/2026 17/04/2026 01/07/2026 |
M/s. J. Pradeep Solomon Raj, the learned Counsel on behalf of the Appellant is present. M/s. R. Thirunavukarasu, the Counsel on behalf of the Respondent prays for time to file the Counter Statement. List to 01.07.2026 for filing the Counter Statement as l | ||
| 34820 | 53/2022 | 14B | EPF Appeal | Tari Bio Tec | APFC, Trichy |
13/02/2025 08/05/2025 06/08/2025 08/10/2025 14/10/2025 19/01/2026 17/04/2026 01/07/2026 |
M/s. J. Pradeep Solomon Raj, the learned Counsel on behalf of the Appellant is present. M/s. R. Thirunavukarasu, the Counsel on behalf of the Respondent prays for time to file the Counter Statement. List to 01.07.2026 for filing the Counter Statement as l | ||
| 34821 | 53/2022 | 14B | EPF Appeal | Tari Bio Tec | APFC, Trichy |
13/02/2025 08/05/2025 06/08/2025 08/10/2025 14/10/2025 19/01/2026 17/04/2026 01/07/2026 |
M/s. J. Pradeep Solomon Raj, the learned Counsel on behalf of the Appellant is present. M/s. R. Thirunavukarasu, the Counsel on behalf of the Respondent prays for time to file the Counter Statement. List to 01.07.2026 for filing the Counter Statement as l | ||
| 34822 | 53/2022 | 14B | EPF Appeal | Tari Bio Tec | APFC, Trichy |
13/02/2025 08/05/2025 06/08/2025 08/10/2025 14/10/2025 19/01/2026 17/04/2026 01/07/2026 |
M/s. J. Pradeep Solomon Raj, the learned Counsel on behalf of the Appellant is present. M/s. R. Thirunavukarasu, the Counsel on behalf of the Respondent prays for time to file the Counter Statement. List to 01.07.2026 for filing the Counter Statement as l | ||
| 34823 | 54/2022 | 14B | EPF Appeal | Subramani Man Power (Contractor) | RPFC, Salem |
06/02/2024 09/09/2024 09/12/2024 23/01/2025 25/04/2025 24/07/2025 24/09/2025 13/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is dismissed. | ||
| 34824 | 54/2022 | 14B | EPF Appeal | Subramani Man Power (Contractor) | RPFC, Salem |
06/02/2024 09/09/2024 09/12/2024 23/01/2025 25/04/2025 24/07/2025 24/09/2025 13/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is dismissed. | ||
| 34825 | 54/2022 | 14B | EPF Appeal | Subramani Man Power (Contractor) | RPFC, Salem |
06/02/2024 09/09/2024 09/12/2024 23/01/2025 25/04/2025 24/07/2025 24/09/2025 13/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is dismissed. | ||
| 34826 | 54/2022 | 14B | EPF Appeal | Subramani Man Power (Contractor) | RPFC, Salem |
06/02/2024 09/09/2024 09/12/2024 23/01/2025 25/04/2025 24/07/2025 24/09/2025 13/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is dismissed. | ||
| 34827 | 54/2022 | 14B | EPF Appeal | Subramani Man Power (Contractor) | RPFC, Salem |
06/02/2024 09/09/2024 09/12/2024 23/01/2025 25/04/2025 24/07/2025 24/09/2025 13/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is dismissed. | ||
| 34828 | 54/2022 | 14B | EPF Appeal | Subramani Man Power (Contractor) | RPFC, Salem |
06/02/2024 09/09/2024 09/12/2024 23/01/2025 25/04/2025 24/07/2025 24/09/2025 13/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is dismissed. | ||
| 34829 | 54/2022 | 14B | EPF Appeal | Subramani Man Power (Contractor) | RPFC, Salem |
06/02/2024 09/09/2024 09/12/2024 23/01/2025 25/04/2025 24/07/2025 24/09/2025 13/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is dismissed. | ||
| 34830 | 54/2022 | 14B | EPF Appeal | Subramani Man Power (Contractor) | RPFC, Salem |
06/02/2024 09/09/2024 09/12/2024 23/01/2025 25/04/2025 24/07/2025 24/09/2025 13/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is dismissed. | ||
| 34831 | 54/2022 | 14B | EPF Appeal | Subramani Man Power (Contractor) | RPFC, Salem |
06/02/2024 09/09/2024 09/12/2024 23/01/2025 25/04/2025 24/07/2025 24/09/2025 13/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is dismissed. | ||
| 34832 | 48/2022 | 14B | EPF Appeal | Avvaiyar Social and Educational Trust | APFC, Puducherry |
11/10/2023 24/01/2024 21/05/2024 07/08/2024 08/11/2024 14/02/2025 09/05/2025 07/08/2025 16/10/2025 29/12/2025 |
Final Order - The Respondent is directed to recover only 70% of assessed amount of damages u/s 14B of the Act. | ||
| 34833 | 48/2022 | 14B | EPF Appeal | Avvaiyar Social and Educational Trust | APFC, Puducherry |
11/10/2023 24/01/2024 21/05/2024 07/08/2024 08/11/2024 14/02/2025 09/05/2025 07/08/2025 16/10/2025 29/12/2025 |
Final Order - The Respondent is directed to recover only 70% of assessed amount of damages u/s 14B of the Act. | ||
| 34834 | 48/2022 | 14B | EPF Appeal | Avvaiyar Social and Educational Trust | APFC, Puducherry |
11/10/2023 24/01/2024 21/05/2024 07/08/2024 08/11/2024 14/02/2025 09/05/2025 07/08/2025 16/10/2025 29/12/2025 |
Final Order - The Respondent is directed to recover only 70% of assessed amount of damages u/s 14B of the Act. | ||
| 34835 | 48/2022 | 14B | EPF Appeal | Avvaiyar Social and Educational Trust | APFC, Puducherry |
11/10/2023 24/01/2024 21/05/2024 07/08/2024 08/11/2024 14/02/2025 09/05/2025 07/08/2025 16/10/2025 29/12/2025 |
Final Order - The Respondent is directed to recover only 70% of assessed amount of damages u/s 14B of the Act. | ||
| 34836 | 48/2022 | 14B | EPF Appeal | Avvaiyar Social and Educational Trust | APFC, Puducherry |
11/10/2023 24/01/2024 21/05/2024 07/08/2024 08/11/2024 14/02/2025 09/05/2025 07/08/2025 16/10/2025 29/12/2025 |
Final Order - The Respondent is directed to recover only 70% of assessed amount of damages u/s 14B of the Act. | ||
| 34837 | 48/2022 | 14B | EPF Appeal | Avvaiyar Social and Educational Trust | APFC, Puducherry |
11/10/2023 24/01/2024 21/05/2024 07/08/2024 08/11/2024 14/02/2025 09/05/2025 07/08/2025 16/10/2025 29/12/2025 |
Final Order - The Respondent is directed to recover only 70% of assessed amount of damages u/s 14B of the Act. | ||
| 34838 | 48/2022 | 14B | EPF Appeal | Avvaiyar Social and Educational Trust | APFC, Puducherry |
11/10/2023 24/01/2024 21/05/2024 07/08/2024 08/11/2024 14/02/2025 09/05/2025 07/08/2025 16/10/2025 29/12/2025 |
Final Order - The Respondent is directed to recover only 70% of assessed amount of damages u/s 14B of the Act. | ||
| 34839 | 48/2022 | 14B | EPF Appeal | Avvaiyar Social and Educational Trust | APFC, Puducherry |
11/10/2023 24/01/2024 21/05/2024 07/08/2024 08/11/2024 14/02/2025 09/05/2025 07/08/2025 16/10/2025 29/12/2025 |
Final Order - The Respondent is directed to recover only 70% of assessed amount of damages u/s 14B of the Act. | ||
| 34840 | 48/2022 | 14B | EPF Appeal | Avvaiyar Social and Educational Trust | APFC, Puducherry |
11/10/2023 24/01/2024 21/05/2024 07/08/2024 08/11/2024 14/02/2025 09/05/2025 07/08/2025 16/10/2025 29/12/2025 |
Final Order - The Respondent is directed to recover only 70% of assessed amount of damages u/s 14B of the Act. | ||
| 34841 | 48/2022 | 14B | EPF Appeal | Avvaiyar Social and Educational Trust | APFC, Puducherry |
11/10/2023 24/01/2024 21/05/2024 07/08/2024 08/11/2024 14/02/2025 09/05/2025 07/08/2025 16/10/2025 29/12/2025 |
Final Order - The Respondent is directed to recover only 70% of assessed amount of damages u/s 14B of the Act. | ||
| 34842 | 49/2022 | 14B | EPF Appeal | Jumbo Fire Works (India) Pvt. Ltd., | APFC, Dindigul |
23/09/2024 23/12/2024 24/03/2025 23/06/2025 14/08/2025 29/10/2025 03/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 34843 | 49/2022 | 14B | EPF Appeal | Jumbo Fire Works (India) Pvt. Ltd., | APFC, Dindigul |
23/09/2024 23/12/2024 24/03/2025 23/06/2025 14/08/2025 29/10/2025 03/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 34844 | 49/2022 | 14B | EPF Appeal | Jumbo Fire Works (India) Pvt. Ltd., | APFC, Dindigul |
23/09/2024 23/12/2024 24/03/2025 23/06/2025 14/08/2025 29/10/2025 03/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 34845 | 49/2022 | 14B | EPF Appeal | Jumbo Fire Works (India) Pvt. Ltd., | APFC, Dindigul |
23/09/2024 23/12/2024 24/03/2025 23/06/2025 14/08/2025 29/10/2025 03/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 34846 | 49/2022 | 14B | EPF Appeal | Jumbo Fire Works (India) Pvt. Ltd., | APFC, Dindigul |
23/09/2024 23/12/2024 24/03/2025 23/06/2025 14/08/2025 29/10/2025 03/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 34847 | 49/2022 | 14B | EPF Appeal | Jumbo Fire Works (India) Pvt. Ltd., | APFC, Dindigul |
23/09/2024 23/12/2024 24/03/2025 23/06/2025 14/08/2025 29/10/2025 03/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 34848 | 49/2022 | 14B | EPF Appeal | Jumbo Fire Works (India) Pvt. Ltd., | APFC, Dindigul |
23/09/2024 23/12/2024 24/03/2025 23/06/2025 14/08/2025 29/10/2025 03/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 34849 | 50/2022 | 14B & 7Q | EPF Appeal | RS746N. Andakudi Primary Agricultural Co-operative Bank Ltd., | APFC, Madurai |
23/12/2024 24/03/2025 23/06/2025 14/08/2025 29/10/2025 16/02/2026 08/05/2026 30/07/2026 |
None appeared on behalf of the Appellant. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 30.07.2026 for hearing on Arguments/filing of written submission. | ||
| 34850 | 50/2022 | 14B & 7Q | EPF Appeal | RS746N. Andakudi Primary Agricultural Co-operative Bank Ltd., | APFC, Madurai |
23/12/2024 24/03/2025 23/06/2025 14/08/2025 29/10/2025 16/02/2026 08/05/2026 30/07/2026 |
None appeared on behalf of the Appellant. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 30.07.2026 for hearing on Arguments/filing of written submission. |