Cause List
| S.No. | Case No. | Subject | Case Type | Name of Appellant | Respondent | Next Date | Details | Order / Decision | Edit |
|---|---|---|---|---|---|---|---|---|---|
| 74101 | 35/2017 | 14B | EPF Appeal | Kwality Spinning Mills Pvt. Ltd. | APFC, Coimbatore |
21/05/2024 07/08/2024 08/11/2024 14/02/2025 09/05/2025 07/08/2025 16/10/2025 19/12/2025 03/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 74102 | 35/2017 | 14B | EPF Appeal | Kwality Spinning Mills Pvt. Ltd. | APFC, Coimbatore |
21/05/2024 07/08/2024 08/11/2024 14/02/2025 09/05/2025 07/08/2025 16/10/2025 19/12/2025 03/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. | ||
| 74103 | 6/2017 | 14B | EPF Appeal | Don Tex | APFC, Coimbatore |
08/11/2024 14/02/2025 09/05/2025 07/08/2025 17/10/2025 23/01/2026 02/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. | ||
| 74104 | 6/2017 | 14B | EPF Appeal | Don Tex | APFC, Coimbatore |
08/11/2024 14/02/2025 09/05/2025 07/08/2025 17/10/2025 23/01/2026 02/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. | ||
| 74105 | 6/2017 | 14B | EPF Appeal | Don Tex | APFC, Coimbatore |
08/11/2024 14/02/2025 09/05/2025 07/08/2025 17/10/2025 23/01/2026 02/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. | ||
| 74106 | 6/2017 | 14B | EPF Appeal | Don Tex | APFC, Coimbatore |
08/11/2024 14/02/2025 09/05/2025 07/08/2025 17/10/2025 23/01/2026 02/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. | ||
| 74107 | 6/2017 | 14B | EPF Appeal | Don Tex | APFC, Coimbatore |
08/11/2024 14/02/2025 09/05/2025 07/08/2025 17/10/2025 23/01/2026 02/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. | ||
| 74108 | 6/2017 | 14B | EPF Appeal | Don Tex | APFC, Coimbatore |
08/11/2024 14/02/2025 09/05/2025 07/08/2025 17/10/2025 23/01/2026 02/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. | ||
| 74109 | 6/2017 | 14B | EPF Appeal | Don Tex | APFC, Coimbatore |
08/11/2024 14/02/2025 09/05/2025 07/08/2025 17/10/2025 23/01/2026 02/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. | ||
| 74110 | 297/2018 | 14B | EPF Appeal | KGS Nelsun Paper Ltd | APFC, Trichy |
31/07/2025 03/09/2025 08/09/2025 18/09/2025 24/10/2025 28/10/2025 27/11/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. The Appeal u/s. 7Q of the Act is dismissed. | ||
| 74111 | 297/2018 | 14B | EPF Appeal | KGS Nelsun Paper Ltd | APFC, Trichy |
31/07/2025 03/09/2025 08/09/2025 18/09/2025 24/10/2025 28/10/2025 27/11/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. The Appeal u/s. 7Q of the Act is dismissed. | ||
| 74112 | 297/2018 | 14B | EPF Appeal | KGS Nelsun Paper Ltd | APFC, Trichy |
31/07/2025 03/09/2025 08/09/2025 18/09/2025 24/10/2025 28/10/2025 27/11/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. The Appeal u/s. 7Q of the Act is dismissed. | ||
| 74113 | 297/2018 | 14B | EPF Appeal | KGS Nelsun Paper Ltd | APFC, Trichy |
31/07/2025 03/09/2025 08/09/2025 18/09/2025 24/10/2025 28/10/2025 27/11/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. The Appeal u/s. 7Q of the Act is dismissed. | ||
| 74114 | 297/2018 | 14B | EPF Appeal | KGS Nelsun Paper Ltd | APFC, Trichy |
31/07/2025 03/09/2025 08/09/2025 18/09/2025 24/10/2025 28/10/2025 27/11/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. The Appeal u/s. 7Q of the Act is dismissed. | ||
| 74115 | 297/2018 | 14B | EPF Appeal | KGS Nelsun Paper Ltd | APFC, Trichy |
31/07/2025 03/09/2025 08/09/2025 18/09/2025 24/10/2025 28/10/2025 27/11/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. The Appeal u/s. 7Q of the Act is dismissed. | ||
| 74116 | 297/2018 | 14B | EPF Appeal | KGS Nelsun Paper Ltd | APFC, Trichy |
31/07/2025 03/09/2025 08/09/2025 18/09/2025 24/10/2025 28/10/2025 27/11/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. The Appeal u/s. 7Q of the Act is dismissed. | ||
| 74117 | 297/2018 | 14B | EPF Appeal | KGS Nelsun Paper Ltd | APFC, Trichy |
31/07/2025 03/09/2025 08/09/2025 18/09/2025 24/10/2025 28/10/2025 27/11/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. The Appeal u/s. 7Q of the Act is dismissed. | ||
| 74118 | 283/2018 | 14B | EPF Appeal | Tech Up Engineering (P) Ltd | APFC, Trichy |
14/02/2025 09/05/2025 07/08/2025 16/10/2025 23/01/2026 24/04/2026 08/07/2026 17/07/2026 |
M/s. M. Aishwariya, the learned Counsel on behalf of the Appellant and M/s.R.Meenakshi, the learned Counsel on behalf of the Respondent pray to list the Appeal in the Special Campaign. List to 17.07.2026 for hearing in the Special Campaign. | ||
| 74119 | 283/2018 | 14B | EPF Appeal | Tech Up Engineering (P) Ltd | APFC, Trichy |
14/02/2025 09/05/2025 07/08/2025 16/10/2025 23/01/2026 24/04/2026 08/07/2026 17/07/2026 |
M/s. M. Aishwariya, the learned Counsel on behalf of the Appellant and M/s.R.Meenakshi, the learned Counsel on behalf of the Respondent pray to list the Appeal in the Special Campaign. List to 17.07.2026 for hearing in the Special Campaign. | ||
| 74120 | 283/2018 | 14B | EPF Appeal | Tech Up Engineering (P) Ltd | APFC, Trichy |
14/02/2025 09/05/2025 07/08/2025 16/10/2025 23/01/2026 24/04/2026 08/07/2026 17/07/2026 |
M/s. M. Aishwariya, the learned Counsel on behalf of the Appellant and M/s.R.Meenakshi, the learned Counsel on behalf of the Respondent pray to list the Appeal in the Special Campaign. List to 17.07.2026 for hearing in the Special Campaign. | ||
| 74121 | 283/2018 | 14B | EPF Appeal | Tech Up Engineering (P) Ltd | APFC, Trichy |
14/02/2025 09/05/2025 07/08/2025 16/10/2025 23/01/2026 24/04/2026 08/07/2026 17/07/2026 |
M/s. M. Aishwariya, the learned Counsel on behalf of the Appellant and M/s.R.Meenakshi, the learned Counsel on behalf of the Respondent pray to list the Appeal in the Special Campaign. List to 17.07.2026 for hearing in the Special Campaign. | ||
| 74122 | 283/2018 | 14B | EPF Appeal | Tech Up Engineering (P) Ltd | APFC, Trichy |
14/02/2025 09/05/2025 07/08/2025 16/10/2025 23/01/2026 24/04/2026 08/07/2026 17/07/2026 |
M/s. M. Aishwariya, the learned Counsel on behalf of the Appellant and M/s.R.Meenakshi, the learned Counsel on behalf of the Respondent pray to list the Appeal in the Special Campaign. List to 17.07.2026 for hearing in the Special Campaign. | ||
| 74123 | 283/2018 | 14B | EPF Appeal | Tech Up Engineering (P) Ltd | APFC, Trichy |
14/02/2025 09/05/2025 07/08/2025 16/10/2025 23/01/2026 24/04/2026 08/07/2026 17/07/2026 |
M/s. M. Aishwariya, the learned Counsel on behalf of the Appellant and M/s.R.Meenakshi, the learned Counsel on behalf of the Respondent pray to list the Appeal in the Special Campaign. List to 17.07.2026 for hearing in the Special Campaign. | ||
| 74124 | 283/2018 | 14B | EPF Appeal | Tech Up Engineering (P) Ltd | APFC, Trichy |
14/02/2025 09/05/2025 07/08/2025 16/10/2025 23/01/2026 24/04/2026 08/07/2026 17/07/2026 |
M/s. M. Aishwariya, the learned Counsel on behalf of the Appellant and M/s.R.Meenakshi, the learned Counsel on behalf of the Respondent pray to list the Appeal in the Special Campaign. List to 17.07.2026 for hearing in the Special Campaign. | ||
| 74125 | 283/2018 | 14B | EPF Appeal | Tech Up Engineering (P) Ltd | APFC, Trichy |
14/02/2025 09/05/2025 07/08/2025 16/10/2025 23/01/2026 24/04/2026 08/07/2026 17/07/2026 |
M/s. M. Aishwariya, the learned Counsel on behalf of the Appellant and M/s.R.Meenakshi, the learned Counsel on behalf of the Respondent pray to list the Appeal in the Special Campaign. List to 17.07.2026 for hearing in the Special Campaign. | ||
| 74126 | 265/2018 | 14B | EPF Appeal | Annamalai University | APFC, Trichy |
02/05/2025 30/06/2025 29/08/2025 26/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal u/s. 14B is partly allowed. 35% of the assessed damages amount is waived off. | ||
| 74127 | 265/2018 | 14B | EPF Appeal | Annamalai University | APFC, Trichy |
02/05/2025 30/06/2025 29/08/2025 26/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal u/s. 14B is partly allowed. 35% of the assessed damages amount is waived off. | ||
| 74128 | 265/2018 | 14B | EPF Appeal | Annamalai University | APFC, Trichy |
02/05/2025 30/06/2025 29/08/2025 26/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal u/s. 14B is partly allowed. 35% of the assessed damages amount is waived off. | ||
| 74129 | 265/2018 | 14B | EPF Appeal | Annamalai University | APFC, Trichy |
02/05/2025 30/06/2025 29/08/2025 26/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal u/s. 14B is partly allowed. 35% of the assessed damages amount is waived off. | ||
| 74130 | 265/2018 | 14B | EPF Appeal | Annamalai University | APFC, Trichy |
02/05/2025 30/06/2025 29/08/2025 26/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal u/s. 14B is partly allowed. 35% of the assessed damages amount is waived off. | ||
| 74131 | 16/2018 (along with 298/2019) | 7A | EPF Appeal | RSM Sapthagiri Finance Ltd. | APFC, Tirunelveli |
27/02/2025 22/05/2025 21/08/2025 12/11/2025 18/02/2026 14/05/2026 17/06/2026 02/07/2026 02/09/2026 |
M/s. C. Karthikeyan, the learned Counsel on behalf of the Appellant is ready to argue but M/s. R. Meenakshi, the Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 02.09.2026 for hearing on Arguments as last chance. | ||
| 74132 | 16/2018 (along with 298/2019) | 7A | EPF Appeal | RSM Sapthagiri Finance Ltd. | APFC, Tirunelveli |
27/02/2025 22/05/2025 21/08/2025 12/11/2025 18/02/2026 14/05/2026 17/06/2026 02/07/2026 02/09/2026 |
M/s. C. Karthikeyan, the learned Counsel on behalf of the Appellant is ready to argue but M/s. R. Meenakshi, the Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 02.09.2026 for hearing on Arguments as last chance. | ||
| 74133 | 16/2018 (along with 298/2019) | 7A | EPF Appeal | RSM Sapthagiri Finance Ltd. | APFC, Tirunelveli |
27/02/2025 22/05/2025 21/08/2025 12/11/2025 18/02/2026 14/05/2026 17/06/2026 02/07/2026 02/09/2026 |
M/s. C. Karthikeyan, the learned Counsel on behalf of the Appellant is ready to argue but M/s. R. Meenakshi, the Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 02.09.2026 for hearing on Arguments as last chance. | ||
| 74134 | 16/2018 (along with 298/2019) | 7A | EPF Appeal | RSM Sapthagiri Finance Ltd. | APFC, Tirunelveli |
27/02/2025 22/05/2025 21/08/2025 12/11/2025 18/02/2026 14/05/2026 17/06/2026 02/07/2026 02/09/2026 |
M/s. C. Karthikeyan, the learned Counsel on behalf of the Appellant is ready to argue but M/s. R. Meenakshi, the Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 02.09.2026 for hearing on Arguments as last chance. | ||
| 74135 | 16/2018 (along with 298/2019) | 7A | EPF Appeal | RSM Sapthagiri Finance Ltd. | APFC, Tirunelveli |
27/02/2025 22/05/2025 21/08/2025 12/11/2025 18/02/2026 14/05/2026 17/06/2026 02/07/2026 02/09/2026 |
M/s. C. Karthikeyan, the learned Counsel on behalf of the Appellant is ready to argue but M/s. R. Meenakshi, the Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 02.09.2026 for hearing on Arguments as last chance. | ||
| 74136 | 16/2018 (along with 298/2019) | 7A | EPF Appeal | RSM Sapthagiri Finance Ltd. | APFC, Tirunelveli |
27/02/2025 22/05/2025 21/08/2025 12/11/2025 18/02/2026 14/05/2026 17/06/2026 02/07/2026 02/09/2026 |
M/s. C. Karthikeyan, the learned Counsel on behalf of the Appellant is ready to argue but M/s. R. Meenakshi, the Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 02.09.2026 for hearing on Arguments as last chance. | ||
| 74137 | 16/2018 (along with 298/2019) | 7A | EPF Appeal | RSM Sapthagiri Finance Ltd. | APFC, Tirunelveli |
27/02/2025 22/05/2025 21/08/2025 12/11/2025 18/02/2026 14/05/2026 17/06/2026 02/07/2026 02/09/2026 |
M/s. C. Karthikeyan, the learned Counsel on behalf of the Appellant is ready to argue but M/s. R. Meenakshi, the Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 02.09.2026 for hearing on Arguments as last chance. | ||
| 74138 | 16/2018 (along with 298/2019) | 7A | EPF Appeal | RSM Sapthagiri Finance Ltd. | APFC, Tirunelveli |
27/02/2025 22/05/2025 21/08/2025 12/11/2025 18/02/2026 14/05/2026 17/06/2026 02/07/2026 02/09/2026 |
M/s. C. Karthikeyan, the learned Counsel on behalf of the Appellant is ready to argue but M/s. R. Meenakshi, the Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 02.09.2026 for hearing on Arguments as last chance. | ||
| 74139 | 16/2018 (along with 298/2019) | 7A | EPF Appeal | RSM Sapthagiri Finance Ltd. | APFC, Tirunelveli |
27/02/2025 22/05/2025 21/08/2025 12/11/2025 18/02/2026 14/05/2026 17/06/2026 02/07/2026 02/09/2026 |
M/s. C. Karthikeyan, the learned Counsel on behalf of the Appellant is ready to argue but M/s. R. Meenakshi, the Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 02.09.2026 for hearing on Arguments as last chance. | ||
| 74140 | 537/2017 | 14B | EPF Appeal | Veefores Sales corp | APFC, Tirunelveli |
21/11/2024 10/03/2025 09/06/2025 01/07/2025 29/08/2025 26/11/2025 12/12/2025 02/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 40% of the assessed amount is waived off. The Respondent is directed to recover only 60% of the assessed amount of damages u/s. 14B of the Act. | ||
| 74141 | 537/2017 | 14B | EPF Appeal | Veefores Sales corp | APFC, Tirunelveli |
21/11/2024 10/03/2025 09/06/2025 01/07/2025 29/08/2025 26/11/2025 12/12/2025 02/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 40% of the assessed amount is waived off. The Respondent is directed to recover only 60% of the assessed amount of damages u/s. 14B of the Act. | ||
| 74142 | 537/2017 | 14B | EPF Appeal | Veefores Sales corp | APFC, Tirunelveli |
21/11/2024 10/03/2025 09/06/2025 01/07/2025 29/08/2025 26/11/2025 12/12/2025 02/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 40% of the assessed amount is waived off. The Respondent is directed to recover only 60% of the assessed amount of damages u/s. 14B of the Act. | ||
| 74143 | 537/2017 | 14B | EPF Appeal | Veefores Sales corp | APFC, Tirunelveli |
21/11/2024 10/03/2025 09/06/2025 01/07/2025 29/08/2025 26/11/2025 12/12/2025 02/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 40% of the assessed amount is waived off. The Respondent is directed to recover only 60% of the assessed amount of damages u/s. 14B of the Act. | ||
| 74144 | 537/2017 | 14B | EPF Appeal | Veefores Sales corp | APFC, Tirunelveli |
21/11/2024 10/03/2025 09/06/2025 01/07/2025 29/08/2025 26/11/2025 12/12/2025 02/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 40% of the assessed amount is waived off. The Respondent is directed to recover only 60% of the assessed amount of damages u/s. 14B of the Act. | ||
| 74145 | 537/2017 | 14B | EPF Appeal | Veefores Sales corp | APFC, Tirunelveli |
21/11/2024 10/03/2025 09/06/2025 01/07/2025 29/08/2025 26/11/2025 12/12/2025 02/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 40% of the assessed amount is waived off. The Respondent is directed to recover only 60% of the assessed amount of damages u/s. 14B of the Act. | ||
| 74146 | 537/2017 | 14B | EPF Appeal | Veefores Sales corp | APFC, Tirunelveli |
21/11/2024 10/03/2025 09/06/2025 01/07/2025 29/08/2025 26/11/2025 12/12/2025 02/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 40% of the assessed amount is waived off. The Respondent is directed to recover only 60% of the assessed amount of damages u/s. 14B of the Act. | ||
| 74147 | 537/2017 | 14B | EPF Appeal | Veefores Sales corp | APFC, Tirunelveli |
21/11/2024 10/03/2025 09/06/2025 01/07/2025 29/08/2025 26/11/2025 12/12/2025 02/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 40% of the assessed amount is waived off. The Respondent is directed to recover only 60% of the assessed amount of damages u/s. 14B of the Act. | ||
| 74148 | 70/2017 | 14B | EPF Appeal | Kanyakumari Dist. Co.op Spinning Mills Ltd. | APFC, Tirunelveli | 11/04/2019 | Admission | ||
| 74149 | 299/2017 | 7A | EPF Appeal | Brilliant Tutorials (P) Ltd. | RPFC, Chennai | 10/04/2019 | Final Order | ||
| 74150 | 554/2018 | 14B-7Q | EPF Appeal | V.K.S.FarmsPvt., Ltd., | APFC, Coimbatore | 10/04/2019 | Final Order |