| 64751 | 3/2019 | 7C | EPF Appeal | St.Ignatius Higher Secondary School | APFC, Nagercoil |
11/09/2024 11/12/2024 11/03/2025 10/06/2025 12/09/2025 12/12/2025 20/03/2026 05/06/2026 |
The learned Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. For Arguments. Respondent is directed to serve counter to the Counsel for Appellan | ||
| 64752 | 3/2019 | 7C | EPF Appeal | St.Ignatius Higher Secondary School | APFC, Nagercoil |
11/09/2024 11/12/2024 11/03/2025 10/06/2025 12/09/2025 12/12/2025 20/03/2026 05/06/2026 |
The learned Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. For Arguments. Respondent is directed to serve counter to the Counsel for Appellan | ||
| 64753 | 3/2019 | 7C | EPF Appeal | St.Ignatius Higher Secondary School | APFC, Nagercoil |
11/09/2024 11/12/2024 11/03/2025 10/06/2025 12/09/2025 12/12/2025 20/03/2026 05/06/2026 |
The learned Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. For Arguments. Respondent is directed to serve counter to the Counsel for Appellan | ||
| 64754 | 3/2019 | 7C | EPF Appeal | St.Ignatius Higher Secondary School | APFC, Nagercoil |
11/09/2024 11/12/2024 11/03/2025 10/06/2025 12/09/2025 12/12/2025 20/03/2026 05/06/2026 |
The learned Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. For Arguments. Respondent is directed to serve counter to the Counsel for Appellan | ||
| 64755 | 3/2019 | 7C | EPF Appeal | St.Ignatius Higher Secondary School | APFC, Nagercoil |
11/09/2024 11/12/2024 11/03/2025 10/06/2025 12/09/2025 12/12/2025 20/03/2026 05/06/2026 |
The learned Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. For Arguments. Respondent is directed to serve counter to the Counsel for Appellan | ||
| 64756 | 3/2019 | 7C | EPF Appeal | St.Ignatius Higher Secondary School | APFC, Nagercoil |
11/09/2024 11/12/2024 11/03/2025 10/06/2025 12/09/2025 12/12/2025 20/03/2026 05/06/2026 |
The learned Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. For Arguments. Respondent is directed to serve counter to the Counsel for Appellan | ||
| 64757 | 3/2019 | 7C | EPF Appeal | St.Ignatius Higher Secondary School | APFC, Nagercoil |
11/09/2024 11/12/2024 11/03/2025 10/06/2025 12/09/2025 12/12/2025 20/03/2026 05/06/2026 |
The learned Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. For Arguments. Respondent is directed to serve counter to the Counsel for Appellan | ||
| 64758 | CGIT/LC/R/38/2013 | SECTION-10 | ID | SHRI VIJAY SINGH & OTHER | PRINCIPAL ACCOUNTANT GENERAL |
05/02/2024 06/03/2024 |
AWARD PASSED | ||
| 64759 | CGIT/LC/R/38/2013 | SECTION-10 | ID | SHRI VIJAY SINGH & OTHER | PRINCIPAL ACCOUNTANT GENERAL |
05/02/2024 06/03/2024 |
AWARD PASSED | ||
| 64760 | 379/2017 | 14B | EPF Appeal | CSI Kanyakumari Diocese | RPFC, Nagercoil |
07/01/2025 08/04/2025 08/07/2025 28/08/2025 21/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 64761 | 379/2017 | 14B | EPF Appeal | CSI Kanyakumari Diocese | RPFC, Nagercoil |
07/01/2025 08/04/2025 08/07/2025 28/08/2025 21/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 64762 | 379/2017 | 14B | EPF Appeal | CSI Kanyakumari Diocese | RPFC, Nagercoil |
07/01/2025 08/04/2025 08/07/2025 28/08/2025 21/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 64763 | 379/2017 | 14B | EPF Appeal | CSI Kanyakumari Diocese | RPFC, Nagercoil |
07/01/2025 08/04/2025 08/07/2025 28/08/2025 21/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 64764 | 379/2017 | 14B | EPF Appeal | CSI Kanyakumari Diocese | RPFC, Nagercoil |
07/01/2025 08/04/2025 08/07/2025 28/08/2025 21/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 64765 | 379/2017 | 14B | EPF Appeal | CSI Kanyakumari Diocese | RPFC, Nagercoil |
07/01/2025 08/04/2025 08/07/2025 28/08/2025 21/11/2025 06/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 64766 | CGIT/LC/R/35/2013 | SECTION-10 | ID | SHRI UMESH KEWAT | UNITED INDIA INSURANCE COMPANY |
02/02/2024 09/04/2024 |
AWARD PASS / NOTIFICATION RECEIVED 25.06.2024 | ||
| 64767 | CGIT/LC/R/35/2013 | SECTION-10 | ID | SHRI UMESH KEWAT | UNITED INDIA INSURANCE COMPANY |
02/02/2024 09/04/2024 |
AWARD PASS / NOTIFICATION RECEIVED 25.06.2024 | ||
| 64768 | 12/2019 | 14B-7Q | EPF Appeal | Indroyal Crafts Pvt. Ltd. | APFC, Tirunelveli |
06/02/2025 14/04/2025 03/06/2025 29/07/2025 01/09/2025 07/11/2025 12/02/2026 |
Final Order - Appeal is partly allowed. 30% of the assessed amount is waived off. Respondent is directed to recover only 70% of assessed amount of damages u/s. 14B of Act. Already remitted amount may be adjusted against balance demand. | ||
| 64769 | 12/2019 | 14B-7Q | EPF Appeal | Indroyal Crafts Pvt. Ltd. | APFC, Tirunelveli |
06/02/2025 14/04/2025 03/06/2025 29/07/2025 01/09/2025 07/11/2025 12/02/2026 |
Final Order - Appeal is partly allowed. 30% of the assessed amount is waived off. Respondent is directed to recover only 70% of assessed amount of damages u/s. 14B of Act. Already remitted amount may be adjusted against balance demand. | ||
| 64770 | 12/2019 | 14B-7Q | EPF Appeal | Indroyal Crafts Pvt. Ltd. | APFC, Tirunelveli |
06/02/2025 14/04/2025 03/06/2025 29/07/2025 01/09/2025 07/11/2025 12/02/2026 |
Final Order - Appeal is partly allowed. 30% of the assessed amount is waived off. Respondent is directed to recover only 70% of assessed amount of damages u/s. 14B of Act. Already remitted amount may be adjusted against balance demand. | ||
| 64771 | 12/2019 | 14B-7Q | EPF Appeal | Indroyal Crafts Pvt. Ltd. | APFC, Tirunelveli |
06/02/2025 14/04/2025 03/06/2025 29/07/2025 01/09/2025 07/11/2025 12/02/2026 |
Final Order - Appeal is partly allowed. 30% of the assessed amount is waived off. Respondent is directed to recover only 70% of assessed amount of damages u/s. 14B of Act. Already remitted amount may be adjusted against balance demand. | ||
| 64772 | 12/2019 | 14B-7Q | EPF Appeal | Indroyal Crafts Pvt. Ltd. | APFC, Tirunelveli |
06/02/2025 14/04/2025 03/06/2025 29/07/2025 01/09/2025 07/11/2025 12/02/2026 |
Final Order - Appeal is partly allowed. 30% of the assessed amount is waived off. Respondent is directed to recover only 70% of assessed amount of damages u/s. 14B of Act. Already remitted amount may be adjusted against balance demand. | ||
| 64773 | 12/2019 | 14B-7Q | EPF Appeal | Indroyal Crafts Pvt. Ltd. | APFC, Tirunelveli |
06/02/2025 14/04/2025 03/06/2025 29/07/2025 01/09/2025 07/11/2025 12/02/2026 |
Final Order - Appeal is partly allowed. 30% of the assessed amount is waived off. Respondent is directed to recover only 70% of assessed amount of damages u/s. 14B of Act. Already remitted amount may be adjusted against balance demand. | ||
| 64774 | 12/2019 | 14B-7Q | EPF Appeal | Indroyal Crafts Pvt. Ltd. | APFC, Tirunelveli |
06/02/2025 14/04/2025 03/06/2025 29/07/2025 01/09/2025 07/11/2025 12/02/2026 |
Final Order - Appeal is partly allowed. 30% of the assessed amount is waived off. Respondent is directed to recover only 70% of assessed amount of damages u/s. 14B of Act. Already remitted amount may be adjusted against balance demand. | ||
| 64775 | 116/2019 | 14B | EPF Appeal | Maris Associates Pvt. Ltd., | RPFC,Tirunelveli |
22/08/2024 22/11/2024 10/03/2025 09/06/2025 22/08/2025 10/10/2025 09/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 35% of the assessed amount of damages u/s. 14B of the Act. | ||
| 64776 | 116/2019 | 14B | EPF Appeal | Maris Associates Pvt. Ltd., | RPFC,Tirunelveli |
22/08/2024 22/11/2024 10/03/2025 09/06/2025 22/08/2025 10/10/2025 09/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 35% of the assessed amount of damages u/s. 14B of the Act. | ||
| 64777 | 116/2019 | 14B | EPF Appeal | Maris Associates Pvt. Ltd., | RPFC,Tirunelveli |
22/08/2024 22/11/2024 10/03/2025 09/06/2025 22/08/2025 10/10/2025 09/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 35% of the assessed amount of damages u/s. 14B of the Act. | ||
| 64778 | 116/2019 | 14B | EPF Appeal | Maris Associates Pvt. Ltd., | RPFC,Tirunelveli |
22/08/2024 22/11/2024 10/03/2025 09/06/2025 22/08/2025 10/10/2025 09/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 35% of the assessed amount of damages u/s. 14B of the Act. | ||
| 64779 | 116/2019 | 14B | EPF Appeal | Maris Associates Pvt. Ltd., | RPFC,Tirunelveli |
22/08/2024 22/11/2024 10/03/2025 09/06/2025 22/08/2025 10/10/2025 09/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 35% of the assessed amount of damages u/s. 14B of the Act. | ||
| 64780 | 116/2019 | 14B | EPF Appeal | Maris Associates Pvt. Ltd., | RPFC,Tirunelveli |
22/08/2024 22/11/2024 10/03/2025 09/06/2025 22/08/2025 10/10/2025 09/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 35% of the assessed amount of damages u/s. 14B of the Act. | ||
| 64781 | 116/2019 | 14B | EPF Appeal | Maris Associates Pvt. Ltd., | RPFC,Tirunelveli |
22/08/2024 22/11/2024 10/03/2025 09/06/2025 22/08/2025 10/10/2025 09/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 35% of the assessed amount of damages u/s. 14B of the Act. | ||
| 64782 | 116/2019 | 14B | EPF Appeal | Maris Associates Pvt. Ltd., | RPFC,Tirunelveli |
22/08/2024 22/11/2024 10/03/2025 09/06/2025 22/08/2025 10/10/2025 09/01/2026 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 35% of the assessed amount of damages u/s. 14B of the Act. | ||
| 64783 | CGIT/LC/RC/05/2012 | SECTION 2A [2&3] | ID | SHRI SHIV PRASAD KANOJIYA | VEHICLE FACTORY JABALPUR |
05/10/2021 26/10/2021 |
AWARD PASS | ||
| 64784 | CGIT/LC/RC/05/2012 | SECTION 2A [2&3] | ID | SHRI SHIV PRASAD KANOJIYA | VEHICLE FACTORY JABALPUR |
05/10/2021 26/10/2021 |
AWARD PASS | ||
| 64785 | 164/2017 | 7A | EPF Appeal | Tamil Nadu Jai Bharat Mills Ltd. | RPFC, Thirunelveli |
07/01/2025 08/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 64786 | 164/2017 | 7A | EPF Appeal | Tamil Nadu Jai Bharat Mills Ltd. | RPFC, Thirunelveli |
07/01/2025 08/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 64787 | 164/2017 | 7A | EPF Appeal | Tamil Nadu Jai Bharat Mills Ltd. | RPFC, Thirunelveli |
07/01/2025 08/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 64788 | 164/2017 | 7A | EPF Appeal | Tamil Nadu Jai Bharat Mills Ltd. | RPFC, Thirunelveli |
07/01/2025 08/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 64789 | 164/2017 | 7A | EPF Appeal | Tamil Nadu Jai Bharat Mills Ltd. | RPFC, Thirunelveli |
07/01/2025 08/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 64790 | 164/2017 | 7A | EPF Appeal | Tamil Nadu Jai Bharat Mills Ltd. | RPFC, Thirunelveli |
07/01/2025 08/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 64791 | 164/2017 | 7A | EPF Appeal | Tamil Nadu Jai Bharat Mills Ltd. | RPFC, Thirunelveli |
07/01/2025 08/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 64792 | CGIT/LC/R/54/2016 | SECTION-10 | ID | UNION | GENERAL MANAGER GCF |
20/01/2025 04/03/2025 28/04/2025 |
AWARD PASSED / NOTIFICATION 23.06.25 | ||
| 64793 | CGIT/LC/R/54/2016 | SECTION-10 | ID | UNION | GENERAL MANAGER GCF |
20/01/2025 04/03/2025 28/04/2025 |
AWARD PASSED / NOTIFICATION 23.06.25 | ||
| 64794 | CGIT/LC/R/54/2016 | SECTION-10 | ID | UNION | GENERAL MANAGER GCF |
20/01/2025 04/03/2025 28/04/2025 |
AWARD PASSED / NOTIFICATION 23.06.25 | ||
| 64795 | 358/2017 | 14B | EPF Appeal | Tiruchirapalli Consumer Co-op Wholesale Stores Ltd., | APFC, Trichy |
26/09/2024 27/12/2024 26/03/2025 25/06/2025 25/08/2025 22/09/2025 15/10/2025 28/10/2025 |
Final Orders - The Appeal is partly allowed. The Respondent is directed to recover only 65% of assessed damages amount. | ||
| 64796 | 358/2017 | 14B | EPF Appeal | Tiruchirapalli Consumer Co-op Wholesale Stores Ltd., | APFC, Trichy |
26/09/2024 27/12/2024 26/03/2025 25/06/2025 25/08/2025 22/09/2025 15/10/2025 28/10/2025 |
Final Orders - The Appeal is partly allowed. The Respondent is directed to recover only 65% of assessed damages amount. | ||
| 64797 | 358/2017 | 14B | EPF Appeal | Tiruchirapalli Consumer Co-op Wholesale Stores Ltd., | APFC, Trichy |
26/09/2024 27/12/2024 26/03/2025 25/06/2025 25/08/2025 22/09/2025 15/10/2025 28/10/2025 |
Final Orders - The Appeal is partly allowed. The Respondent is directed to recover only 65% of assessed damages amount. | ||
| 64798 | 358/2017 | 14B | EPF Appeal | Tiruchirapalli Consumer Co-op Wholesale Stores Ltd., | APFC, Trichy |
26/09/2024 27/12/2024 26/03/2025 25/06/2025 25/08/2025 22/09/2025 15/10/2025 28/10/2025 |
Final Orders - The Appeal is partly allowed. The Respondent is directed to recover only 65% of assessed damages amount. | ||
| 64799 | 358/2017 | 14B | EPF Appeal | Tiruchirapalli Consumer Co-op Wholesale Stores Ltd., | APFC, Trichy |
26/09/2024 27/12/2024 26/03/2025 25/06/2025 25/08/2025 22/09/2025 15/10/2025 28/10/2025 |
Final Orders - The Appeal is partly allowed. The Respondent is directed to recover only 65% of assessed damages amount. | ||
| 64800 | 358/2017 | 14B | EPF Appeal | Tiruchirapalli Consumer Co-op Wholesale Stores Ltd., | APFC, Trichy |
26/09/2024 27/12/2024 26/03/2025 25/06/2025 25/08/2025 22/09/2025 15/10/2025 28/10/2025 |
Final Orders - The Appeal is partly allowed. The Respondent is directed to recover only 65% of assessed damages amount. |