52601 419/2018 14B EPF Appeal Vignesh Leather Company APFC, Trichy 03/06/2024
09/09/2024
09/12/2024
21/01/2025
23/04/2025
22/07/2025
17/09/2025
10/10/2025
Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of assessed damages amount.
52602 419/2018 14B EPF Appeal Vignesh Leather Company APFC, Trichy 03/06/2024
09/09/2024
09/12/2024
21/01/2025
23/04/2025
22/07/2025
17/09/2025
10/10/2025
Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of assessed damages amount.
52603 419/2018 14B EPF Appeal Vignesh Leather Company APFC, Trichy 03/06/2024
09/09/2024
09/12/2024
21/01/2025
23/04/2025
22/07/2025
17/09/2025
10/10/2025
Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of assessed damages amount.
52604 419/2018 14B EPF Appeal Vignesh Leather Company APFC, Trichy 03/06/2024
09/09/2024
09/12/2024
21/01/2025
23/04/2025
22/07/2025
17/09/2025
10/10/2025
Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of assessed damages amount.
52605 419/2018 14B EPF Appeal Vignesh Leather Company APFC, Trichy 03/06/2024
09/09/2024
09/12/2024
21/01/2025
23/04/2025
22/07/2025
17/09/2025
10/10/2025
Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of assessed damages amount.
52606 419/2018 14B EPF Appeal Vignesh Leather Company APFC, Trichy 03/06/2024
09/09/2024
09/12/2024
21/01/2025
23/04/2025
22/07/2025
17/09/2025
10/10/2025
Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of assessed damages amount.
52607 418/2018 14B EPF Appeal Sri Kanchi Sankara APFC, Trichy 06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 23.12.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52608 418/2018 14B EPF Appeal Sri Kanchi Sankara APFC, Trichy 06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 23.12.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52609 418/2018 14B EPF Appeal Sri Kanchi Sankara APFC, Trichy 06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 23.12.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52610 418/2018 14B EPF Appeal Sri Kanchi Sankara APFC, Trichy 06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 23.12.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52611 418/2018 14B EPF Appeal Sri Kanchi Sankara APFC, Trichy 06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 23.12.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52612 418/2018 14B EPF Appeal Sri Kanchi Sankara APFC, Trichy 06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 23.12.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52613 418/2018 14B EPF Appeal Sri Kanchi Sankara APFC, Trichy 06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 23.12.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52614 418/2018 14B EPF Appeal Sri Kanchi Sankara APFC, Trichy 06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 23.12.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52615 417/2018 14B EPF Appeal Modern Associate Contract APFC, Trichy 20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
13/02/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 03.11.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52616 417/2018 14B EPF Appeal Modern Associate Contract APFC, Trichy 20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
13/02/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 03.11.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52617 417/2018 14B EPF Appeal Modern Associate Contract APFC, Trichy 20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
13/02/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 03.11.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52618 417/2018 14B EPF Appeal Modern Associate Contract APFC, Trichy 20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
13/02/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 03.11.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52619 417/2018 14B EPF Appeal Modern Associate Contract APFC, Trichy 20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
13/02/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 03.11.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52620 417/2018 14B EPF Appeal Modern Associate Contract APFC, Trichy 20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
13/02/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 03.11.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52621 417/2018 14B EPF Appeal Modern Associate Contract APFC, Trichy 20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
13/02/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 03.11.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52622 416/2018 14B EPF Appeal The Professional Couriers APFC, Trichy 13/03/2025
12/06/2025
20/06/2025
02/07/2025
01/09/2025
07/11/2025
13/02/2026
Final Order - 30% of the assessed amount passed by the Respondent order dated 13.01.2016 is waived. The Respondent will recover remaining 70% of the assessed amount from the Appellant establishment in accordance with law.
52623 416/2018 14B EPF Appeal The Professional Couriers APFC, Trichy 13/03/2025
12/06/2025
20/06/2025
02/07/2025
01/09/2025
07/11/2025
13/02/2026
Final Order - 30% of the assessed amount passed by the Respondent order dated 13.01.2016 is waived. The Respondent will recover remaining 70% of the assessed amount from the Appellant establishment in accordance with law.
52624 416/2018 14B EPF Appeal The Professional Couriers APFC, Trichy 13/03/2025
12/06/2025
20/06/2025
02/07/2025
01/09/2025
07/11/2025
13/02/2026
Final Order - 30% of the assessed amount passed by the Respondent order dated 13.01.2016 is waived. The Respondent will recover remaining 70% of the assessed amount from the Appellant establishment in accordance with law.
52625 416/2018 14B EPF Appeal The Professional Couriers APFC, Trichy 13/03/2025
12/06/2025
20/06/2025
02/07/2025
01/09/2025
07/11/2025
13/02/2026
Final Order - 30% of the assessed amount passed by the Respondent order dated 13.01.2016 is waived. The Respondent will recover remaining 70% of the assessed amount from the Appellant establishment in accordance with law.
52626 416/2018 14B EPF Appeal The Professional Couriers APFC, Trichy 13/03/2025
12/06/2025
20/06/2025
02/07/2025
01/09/2025
07/11/2025
13/02/2026
Final Order - 30% of the assessed amount passed by the Respondent order dated 13.01.2016 is waived. The Respondent will recover remaining 70% of the assessed amount from the Appellant establishment in accordance with law.
52627 416/2018 14B EPF Appeal The Professional Couriers APFC, Trichy 13/03/2025
12/06/2025
20/06/2025
02/07/2025
01/09/2025
07/11/2025
13/02/2026
Final Order - 30% of the assessed amount passed by the Respondent order dated 13.01.2016 is waived. The Respondent will recover remaining 70% of the assessed amount from the Appellant establishment in accordance with law.
52628 416/2018 14B EPF Appeal The Professional Couriers APFC, Trichy 13/03/2025
12/06/2025
20/06/2025
02/07/2025
01/09/2025
07/11/2025
13/02/2026
Final Order - 30% of the assessed amount passed by the Respondent order dated 13.01.2016 is waived. The Respondent will recover remaining 70% of the assessed amount from the Appellant establishment in accordance with law.
52629 415/2018 14B EPF Appeal S. Saravana Contractor APFC, Trichy 09/12/2024
21/01/2025
23/04/2025
22/07/2025
17/09/2025
19/12/2025
03/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. The appeal u/s. 7Q of the Act is dismissed.
52630 415/2018 14B EPF Appeal S. Saravana Contractor APFC, Trichy 09/12/2024
21/01/2025
23/04/2025
22/07/2025
17/09/2025
19/12/2025
03/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. The appeal u/s. 7Q of the Act is dismissed.
52631 415/2018 14B EPF Appeal S. Saravana Contractor APFC, Trichy 09/12/2024
21/01/2025
23/04/2025
22/07/2025
17/09/2025
19/12/2025
03/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. The appeal u/s. 7Q of the Act is dismissed.
52632 415/2018 14B EPF Appeal S. Saravana Contractor APFC, Trichy 09/12/2024
21/01/2025
23/04/2025
22/07/2025
17/09/2025
19/12/2025
03/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. The appeal u/s. 7Q of the Act is dismissed.
52633 415/2018 14B EPF Appeal S. Saravana Contractor APFC, Trichy 09/12/2024
21/01/2025
23/04/2025
22/07/2025
17/09/2025
19/12/2025
03/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. The appeal u/s. 7Q of the Act is dismissed.
52634 415/2018 14B EPF Appeal S. Saravana Contractor APFC, Trichy 09/12/2024
21/01/2025
23/04/2025
22/07/2025
17/09/2025
19/12/2025
03/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. The appeal u/s. 7Q of the Act is dismissed.
52635 415/2018 14B EPF Appeal S. Saravana Contractor APFC, Trichy 09/12/2024
21/01/2025
23/04/2025
22/07/2025
17/09/2025
19/12/2025
03/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. The appeal u/s. 7Q of the Act is dismissed.
52636 414/2018 14B EPF Appeal Dr.Samuel A Mathenan Nursing Home APFC, Trichy 20/11/2019
27/01/2020
12/03/2020
11/06/2020
09/09/2020
18/01/2021
21/06/2021
24/11/2021
08/03/2022
11/03/2022
Final Order-The Appeal stands dismissed.
52637 414/2018 14B EPF Appeal Dr.Samuel A Mathenan Nursing Home APFC, Trichy 20/11/2019
27/01/2020
12/03/2020
11/06/2020
09/09/2020
18/01/2021
21/06/2021
24/11/2021
08/03/2022
11/03/2022
Final Order-The Appeal stands dismissed.
52638 414/2018 14B EPF Appeal Dr.Samuel A Mathenan Nursing Home APFC, Trichy 20/11/2019
27/01/2020
12/03/2020
11/06/2020
09/09/2020
18/01/2021
21/06/2021
24/11/2021
08/03/2022
11/03/2022
Final Order-The Appeal stands dismissed.
52639 414/2018 14B EPF Appeal Dr.Samuel A Mathenan Nursing Home APFC, Trichy 20/11/2019
27/01/2020
12/03/2020
11/06/2020
09/09/2020
18/01/2021
21/06/2021
24/11/2021
08/03/2022
11/03/2022
Final Order-The Appeal stands dismissed.
52640 414/2018 14B EPF Appeal Dr.Samuel A Mathenan Nursing Home APFC, Trichy 20/11/2019
27/01/2020
12/03/2020
11/06/2020
09/09/2020
18/01/2021
21/06/2021
24/11/2021
08/03/2022
11/03/2022
Final Order-The Appeal stands dismissed.
52641 414/2018 14B EPF Appeal Dr.Samuel A Mathenan Nursing Home APFC, Trichy 20/11/2019
27/01/2020
12/03/2020
11/06/2020
09/09/2020
18/01/2021
21/06/2021
24/11/2021
08/03/2022
11/03/2022
Final Order-The Appeal stands dismissed.
52642 414/2018 14B EPF Appeal Dr.Samuel A Mathenan Nursing Home APFC, Trichy 20/11/2019
27/01/2020
12/03/2020
11/06/2020
09/09/2020
18/01/2021
21/06/2021
24/11/2021
08/03/2022
11/03/2022
Final Order-The Appeal stands dismissed.
52643 414/2018 14B EPF Appeal Dr.Samuel A Mathenan Nursing Home APFC, Trichy 20/11/2019
27/01/2020
12/03/2020
11/06/2020
09/09/2020
18/01/2021
21/06/2021
24/11/2021
08/03/2022
11/03/2022
Final Order-The Appeal stands dismissed.
52644 414/2018 14B EPF Appeal Dr.Samuel A Mathenan Nursing Home APFC, Trichy 20/11/2019
27/01/2020
12/03/2020
11/06/2020
09/09/2020
18/01/2021
21/06/2021
24/11/2021
08/03/2022
11/03/2022
Final Order-The Appeal stands dismissed.
52645 414/2018 14B EPF Appeal Dr.Samuel A Mathenan Nursing Home APFC, Trichy 20/11/2019
27/01/2020
12/03/2020
11/06/2020
09/09/2020
18/01/2021
21/06/2021
24/11/2021
08/03/2022
11/03/2022
Final Order-The Appeal stands dismissed.
52646 413/2018 7A & 8F EPF Appeal Oxford Engineering College APFC, Trichy 12/06/2025
12/08/2025
23/10/2025
29/01/2026
18/03/2026
04/06/2026
14/08/2026
M/s. M. Aishwariya, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 14.08.2026 for hearing on Arguments/filing of written submiss
52647 413/2018 7A & 8F EPF Appeal Oxford Engineering College APFC, Trichy 12/06/2025
12/08/2025
23/10/2025
29/01/2026
18/03/2026
04/06/2026
14/08/2026
M/s. M. Aishwariya, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 14.08.2026 for hearing on Arguments/filing of written submiss
52648 413/2018 7A & 8F EPF Appeal Oxford Engineering College APFC, Trichy 12/06/2025
12/08/2025
23/10/2025
29/01/2026
18/03/2026
04/06/2026
14/08/2026
M/s. M. Aishwariya, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 14.08.2026 for hearing on Arguments/filing of written submiss
52649 413/2018 7A & 8F EPF Appeal Oxford Engineering College APFC, Trichy 12/06/2025
12/08/2025
23/10/2025
29/01/2026
18/03/2026
04/06/2026
14/08/2026
M/s. M. Aishwariya, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 14.08.2026 for hearing on Arguments/filing of written submiss
52650 413/2018 7A & 8F EPF Appeal Oxford Engineering College APFC, Trichy 12/06/2025
12/08/2025
23/10/2025
29/01/2026
18/03/2026
04/06/2026
14/08/2026
M/s. M. Aishwariya, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 14.08.2026 for hearing on Arguments/filing of written submiss