52651 419/2018 14B EPF Appeal Vignesh Leather Company APFC, Trichy 03/06/2024
09/09/2024
09/12/2024
21/01/2025
23/04/2025
22/07/2025
17/09/2025
10/10/2025
Final Order - The Appeal is partly allowed. The Respondent is directed to recover only 70% of assessed damages amount.
52652 418/2018 14B EPF Appeal Sri Kanchi Sankara APFC, Trichy 06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 23.12.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52653 418/2018 14B EPF Appeal Sri Kanchi Sankara APFC, Trichy 06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 23.12.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52654 418/2018 14B EPF Appeal Sri Kanchi Sankara APFC, Trichy 06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 23.12.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52655 418/2018 14B EPF Appeal Sri Kanchi Sankara APFC, Trichy 06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 23.12.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52656 418/2018 14B EPF Appeal Sri Kanchi Sankara APFC, Trichy 06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 23.12.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52657 418/2018 14B EPF Appeal Sri Kanchi Sankara APFC, Trichy 06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 23.12.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52658 418/2018 14B EPF Appeal Sri Kanchi Sankara APFC, Trichy 06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 23.12.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52659 418/2018 14B EPF Appeal Sri Kanchi Sankara APFC, Trichy 06/08/2024
07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 23.12.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52660 417/2018 14B EPF Appeal Modern Associate Contract APFC, Trichy 20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
13/02/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 03.11.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52661 417/2018 14B EPF Appeal Modern Associate Contract APFC, Trichy 20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
13/02/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 03.11.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52662 417/2018 14B EPF Appeal Modern Associate Contract APFC, Trichy 20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
13/02/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 03.11.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52663 417/2018 14B EPF Appeal Modern Associate Contract APFC, Trichy 20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
13/02/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 03.11.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52664 417/2018 14B EPF Appeal Modern Associate Contract APFC, Trichy 20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
13/02/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 03.11.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52665 417/2018 14B EPF Appeal Modern Associate Contract APFC, Trichy 20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
13/02/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 03.11.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52666 417/2018 14B EPF Appeal Modern Associate Contract APFC, Trichy 20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
13/02/2026
Final Order - 32% of the assessed amount passed by the Respondent order dated 03.11.2015 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
52667 416/2018 14B EPF Appeal The Professional Couriers APFC, Trichy 13/03/2025
12/06/2025
20/06/2025
02/07/2025
01/09/2025
07/11/2025
13/02/2026
Final Order - 30% of the assessed amount passed by the Respondent order dated 13.01.2016 is waived. The Respondent will recover remaining 70% of the assessed amount from the Appellant establishment in accordance with law.
52668 416/2018 14B EPF Appeal The Professional Couriers APFC, Trichy 13/03/2025
12/06/2025
20/06/2025
02/07/2025
01/09/2025
07/11/2025
13/02/2026
Final Order - 30% of the assessed amount passed by the Respondent order dated 13.01.2016 is waived. The Respondent will recover remaining 70% of the assessed amount from the Appellant establishment in accordance with law.
52669 416/2018 14B EPF Appeal The Professional Couriers APFC, Trichy 13/03/2025
12/06/2025
20/06/2025
02/07/2025
01/09/2025
07/11/2025
13/02/2026
Final Order - 30% of the assessed amount passed by the Respondent order dated 13.01.2016 is waived. The Respondent will recover remaining 70% of the assessed amount from the Appellant establishment in accordance with law.
52670 416/2018 14B EPF Appeal The Professional Couriers APFC, Trichy 13/03/2025
12/06/2025
20/06/2025
02/07/2025
01/09/2025
07/11/2025
13/02/2026
Final Order - 30% of the assessed amount passed by the Respondent order dated 13.01.2016 is waived. The Respondent will recover remaining 70% of the assessed amount from the Appellant establishment in accordance with law.
52671 416/2018 14B EPF Appeal The Professional Couriers APFC, Trichy 13/03/2025
12/06/2025
20/06/2025
02/07/2025
01/09/2025
07/11/2025
13/02/2026
Final Order - 30% of the assessed amount passed by the Respondent order dated 13.01.2016 is waived. The Respondent will recover remaining 70% of the assessed amount from the Appellant establishment in accordance with law.
52672 416/2018 14B EPF Appeal The Professional Couriers APFC, Trichy 13/03/2025
12/06/2025
20/06/2025
02/07/2025
01/09/2025
07/11/2025
13/02/2026
Final Order - 30% of the assessed amount passed by the Respondent order dated 13.01.2016 is waived. The Respondent will recover remaining 70% of the assessed amount from the Appellant establishment in accordance with law.
52673 416/2018 14B EPF Appeal The Professional Couriers APFC, Trichy 13/03/2025
12/06/2025
20/06/2025
02/07/2025
01/09/2025
07/11/2025
13/02/2026
Final Order - 30% of the assessed amount passed by the Respondent order dated 13.01.2016 is waived. The Respondent will recover remaining 70% of the assessed amount from the Appellant establishment in accordance with law.
52674 415/2018 14B EPF Appeal S. Saravana Contractor APFC, Trichy 09/12/2024
21/01/2025
23/04/2025
22/07/2025
17/09/2025
19/12/2025
03/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. The appeal u/s. 7Q of the Act is dismissed.
52675 415/2018 14B EPF Appeal S. Saravana Contractor APFC, Trichy 09/12/2024
21/01/2025
23/04/2025
22/07/2025
17/09/2025
19/12/2025
03/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. The appeal u/s. 7Q of the Act is dismissed.
52676 415/2018 14B EPF Appeal S. Saravana Contractor APFC, Trichy 09/12/2024
21/01/2025
23/04/2025
22/07/2025
17/09/2025
19/12/2025
03/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. The appeal u/s. 7Q of the Act is dismissed.
52677 415/2018 14B EPF Appeal S. Saravana Contractor APFC, Trichy 09/12/2024
21/01/2025
23/04/2025
22/07/2025
17/09/2025
19/12/2025
03/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. The appeal u/s. 7Q of the Act is dismissed.
52678 415/2018 14B EPF Appeal S. Saravana Contractor APFC, Trichy 09/12/2024
21/01/2025
23/04/2025
22/07/2025
17/09/2025
19/12/2025
03/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. The appeal u/s. 7Q of the Act is dismissed.
52679 415/2018 14B EPF Appeal S. Saravana Contractor APFC, Trichy 09/12/2024
21/01/2025
23/04/2025
22/07/2025
17/09/2025
19/12/2025
03/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. The appeal u/s. 7Q of the Act is dismissed.
52680 415/2018 14B EPF Appeal S. Saravana Contractor APFC, Trichy 09/12/2024
21/01/2025
23/04/2025
22/07/2025
17/09/2025
19/12/2025
03/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act. The appeal u/s. 7Q of the Act is dismissed.
52681 414/2018 14B EPF Appeal Dr.Samuel A Mathenan Nursing Home APFC, Trichy 20/11/2019
27/01/2020
12/03/2020
11/06/2020
09/09/2020
18/01/2021
21/06/2021
24/11/2021
08/03/2022
11/03/2022
Final Order-The Appeal stands dismissed.
52682 414/2018 14B EPF Appeal Dr.Samuel A Mathenan Nursing Home APFC, Trichy 20/11/2019
27/01/2020
12/03/2020
11/06/2020
09/09/2020
18/01/2021
21/06/2021
24/11/2021
08/03/2022
11/03/2022
Final Order-The Appeal stands dismissed.
52683 414/2018 14B EPF Appeal Dr.Samuel A Mathenan Nursing Home APFC, Trichy 20/11/2019
27/01/2020
12/03/2020
11/06/2020
09/09/2020
18/01/2021
21/06/2021
24/11/2021
08/03/2022
11/03/2022
Final Order-The Appeal stands dismissed.
52684 414/2018 14B EPF Appeal Dr.Samuel A Mathenan Nursing Home APFC, Trichy 20/11/2019
27/01/2020
12/03/2020
11/06/2020
09/09/2020
18/01/2021
21/06/2021
24/11/2021
08/03/2022
11/03/2022
Final Order-The Appeal stands dismissed.
52685 414/2018 14B EPF Appeal Dr.Samuel A Mathenan Nursing Home APFC, Trichy 20/11/2019
27/01/2020
12/03/2020
11/06/2020
09/09/2020
18/01/2021
21/06/2021
24/11/2021
08/03/2022
11/03/2022
Final Order-The Appeal stands dismissed.
52686 414/2018 14B EPF Appeal Dr.Samuel A Mathenan Nursing Home APFC, Trichy 20/11/2019
27/01/2020
12/03/2020
11/06/2020
09/09/2020
18/01/2021
21/06/2021
24/11/2021
08/03/2022
11/03/2022
Final Order-The Appeal stands dismissed.
52687 414/2018 14B EPF Appeal Dr.Samuel A Mathenan Nursing Home APFC, Trichy 20/11/2019
27/01/2020
12/03/2020
11/06/2020
09/09/2020
18/01/2021
21/06/2021
24/11/2021
08/03/2022
11/03/2022
Final Order-The Appeal stands dismissed.
52688 414/2018 14B EPF Appeal Dr.Samuel A Mathenan Nursing Home APFC, Trichy 20/11/2019
27/01/2020
12/03/2020
11/06/2020
09/09/2020
18/01/2021
21/06/2021
24/11/2021
08/03/2022
11/03/2022
Final Order-The Appeal stands dismissed.
52689 414/2018 14B EPF Appeal Dr.Samuel A Mathenan Nursing Home APFC, Trichy 20/11/2019
27/01/2020
12/03/2020
11/06/2020
09/09/2020
18/01/2021
21/06/2021
24/11/2021
08/03/2022
11/03/2022
Final Order-The Appeal stands dismissed.
52690 414/2018 14B EPF Appeal Dr.Samuel A Mathenan Nursing Home APFC, Trichy 20/11/2019
27/01/2020
12/03/2020
11/06/2020
09/09/2020
18/01/2021
21/06/2021
24/11/2021
08/03/2022
11/03/2022
Final Order-The Appeal stands dismissed.
52691 413/2018 7A & 8F EPF Appeal Oxford Engineering College APFC, Trichy 12/06/2025
12/08/2025
23/10/2025
29/01/2026
18/03/2026
04/06/2026
14/08/2026
M/s. M. Aishwariya, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 14.08.2026 for hearing on Arguments/filing of written submiss
52692 413/2018 7A & 8F EPF Appeal Oxford Engineering College APFC, Trichy 12/06/2025
12/08/2025
23/10/2025
29/01/2026
18/03/2026
04/06/2026
14/08/2026
M/s. M. Aishwariya, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 14.08.2026 for hearing on Arguments/filing of written submiss
52693 413/2018 7A & 8F EPF Appeal Oxford Engineering College APFC, Trichy 12/06/2025
12/08/2025
23/10/2025
29/01/2026
18/03/2026
04/06/2026
14/08/2026
M/s. M. Aishwariya, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 14.08.2026 for hearing on Arguments/filing of written submiss
52694 413/2018 7A & 8F EPF Appeal Oxford Engineering College APFC, Trichy 12/06/2025
12/08/2025
23/10/2025
29/01/2026
18/03/2026
04/06/2026
14/08/2026
M/s. M. Aishwariya, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 14.08.2026 for hearing on Arguments/filing of written submiss
52695 413/2018 7A & 8F EPF Appeal Oxford Engineering College APFC, Trichy 12/06/2025
12/08/2025
23/10/2025
29/01/2026
18/03/2026
04/06/2026
14/08/2026
M/s. M. Aishwariya, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 14.08.2026 for hearing on Arguments/filing of written submiss
52696 413/2018 7A & 8F EPF Appeal Oxford Engineering College APFC, Trichy 12/06/2025
12/08/2025
23/10/2025
29/01/2026
18/03/2026
04/06/2026
14/08/2026
M/s. M. Aishwariya, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 14.08.2026 for hearing on Arguments/filing of written submiss
52697 413/2018 7A & 8F EPF Appeal Oxford Engineering College APFC, Trichy 12/06/2025
12/08/2025
23/10/2025
29/01/2026
18/03/2026
04/06/2026
14/08/2026
M/s. M. Aishwariya, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 14.08.2026 for hearing on Arguments/filing of written submiss
52698 412/2018 14B EPF Appeal Parimalar Matriculation School APFC, Trichy 26/08/2020
05/01/2021
09/06/2021
12/11/2021
07/03/2022
27/05/2022
Final Orders-The Appeal stands dismissed.
52699 412/2018 14B EPF Appeal Parimalar Matriculation School APFC, Trichy 26/08/2020
05/01/2021
09/06/2021
12/11/2021
07/03/2022
27/05/2022
Final Orders-The Appeal stands dismissed.
52700 412/2018 14B EPF Appeal Parimalar Matriculation School APFC, Trichy 26/08/2020
05/01/2021
09/06/2021
12/11/2021
07/03/2022
27/05/2022
Final Orders-The Appeal stands dismissed.