Cause List
| S.No. | Case No. | Subject | Case Type | Name of Appellant | Respondent | Next Date | Details | Order / Decision | Edit |
|---|---|---|---|---|---|---|---|---|---|
| 29251 | 153/2022 | 14B | EPF Appeal | Baby Firework Industries | APFC, Dindigul |
23/09/2024 23/12/2024 24/03/2025 23/06/2025 14/08/2025 29/10/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 29252 | 153/2022 | 14B | EPF Appeal | Baby Firework Industries | APFC, Dindigul |
23/09/2024 23/12/2024 24/03/2025 23/06/2025 14/08/2025 29/10/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 29253 | 153/2022 | 14B | EPF Appeal | Baby Firework Industries | APFC, Dindigul |
23/09/2024 23/12/2024 24/03/2025 23/06/2025 14/08/2025 29/10/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 29254 | 153/2022 | 14B | EPF Appeal | Baby Firework Industries | APFC, Dindigul |
23/09/2024 23/12/2024 24/03/2025 23/06/2025 14/08/2025 29/10/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 29255 | 153/2022 | 14B | EPF Appeal | Baby Firework Industries | APFC, Dindigul |
23/09/2024 23/12/2024 24/03/2025 23/06/2025 14/08/2025 29/10/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 29256 | 153/2022 | 14B | EPF Appeal | Baby Firework Industries | APFC, Dindigul |
23/09/2024 23/12/2024 24/03/2025 23/06/2025 14/08/2025 29/10/2025 05/02/2026 |
(Special Campaign) Final Order - The Appeal is partly allowed. 35% of the assessed amount is waived off. The Respondent is directed to recover only 65% of the assessed amount of damages u/s. 14B of the Act. | ||
| 29257 | 152/2022 | 14B | EPF Appeal | Sivamani Spinning Mills | RPFC-II, Salem |
06/08/2024 07/11/2024 13/02/2025 08/05/2025 07/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. | ||
| 29258 | 152/2022 | 14B | EPF Appeal | Sivamani Spinning Mills | RPFC-II, Salem |
06/08/2024 07/11/2024 13/02/2025 08/05/2025 07/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. | ||
| 29259 | 152/2022 | 14B | EPF Appeal | Sivamani Spinning Mills | RPFC-II, Salem |
06/08/2024 07/11/2024 13/02/2025 08/05/2025 07/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. | ||
| 29260 | 152/2022 | 14B | EPF Appeal | Sivamani Spinning Mills | RPFC-II, Salem |
06/08/2024 07/11/2024 13/02/2025 08/05/2025 07/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. | ||
| 29261 | 152/2022 | 14B | EPF Appeal | Sivamani Spinning Mills | RPFC-II, Salem |
06/08/2024 07/11/2024 13/02/2025 08/05/2025 07/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. | ||
| 29262 | 152/2022 | 14B | EPF Appeal | Sivamani Spinning Mills | RPFC-II, Salem |
06/08/2024 07/11/2024 13/02/2025 08/05/2025 07/08/2025 14/08/2025 |
(Camp)Final Order - The Appeal is partly allowed. | ||
| 29263 | 151/2022 | 7A | EPF Appeal | Presidency Kid Leather Pvt. Ltd. | RPFC-I, Tambaram |
05/12/2022 09/01/2023 23/01/2023 06/03/2023 23/03/2023 24/03/2023 |
Final Order-The Appeal stands dismissed on the point of limitation. | ||
| 29264 | 151/2022 | 7A | EPF Appeal | Presidency Kid Leather Pvt. Ltd. | RPFC-I, Tambaram |
05/12/2022 09/01/2023 23/01/2023 06/03/2023 23/03/2023 24/03/2023 |
Final Order-The Appeal stands dismissed on the point of limitation. | ||
| 29265 | 151/2022 | 7A | EPF Appeal | Presidency Kid Leather Pvt. Ltd. | RPFC-I, Tambaram |
05/12/2022 09/01/2023 23/01/2023 06/03/2023 23/03/2023 24/03/2023 |
Final Order-The Appeal stands dismissed on the point of limitation. | ||
| 29266 | 151/2022 | 7A | EPF Appeal | Presidency Kid Leather Pvt. Ltd. | RPFC-I, Tambaram |
05/12/2022 09/01/2023 23/01/2023 06/03/2023 23/03/2023 24/03/2023 |
Final Order-The Appeal stands dismissed on the point of limitation. | ||
| 29267 | 151/2022 | 7A | EPF Appeal | Presidency Kid Leather Pvt. Ltd. | RPFC-I, Tambaram |
05/12/2022 09/01/2023 23/01/2023 06/03/2023 23/03/2023 24/03/2023 |
Final Order-The Appeal stands dismissed on the point of limitation. | ||
| 29268 | 151/2022 | 7A | EPF Appeal | Presidency Kid Leather Pvt. Ltd. | RPFC-I, Tambaram |
05/12/2022 09/01/2023 23/01/2023 06/03/2023 23/03/2023 24/03/2023 |
Final Order-The Appeal stands dismissed on the point of limitation. | ||
| 29269 | 150/2022 | 14B-7Q | EPF Appeal | Servocraft HR Solutions Pvt. Ltd. | RPFC-II, Ambattur |
24/03/2025 23/06/2025 14/08/2025 29/10/2025 16/02/2026 08/05/2026 |
None appeared on behalf of the Appellant. The Representative Counsel on behalf of the Respondent is present. List to 08.05.2026 for hearing on Arguments/filing of written submission if any. | ||
| 29270 | 150/2022 | 14B-7Q | EPF Appeal | Servocraft HR Solutions Pvt. Ltd. | RPFC-II, Ambattur |
24/03/2025 23/06/2025 14/08/2025 29/10/2025 16/02/2026 08/05/2026 |
None appeared on behalf of the Appellant. The Representative Counsel on behalf of the Respondent is present. List to 08.05.2026 for hearing on Arguments/filing of written submission if any. | ||
| 29271 | 150/2022 | 14B-7Q | EPF Appeal | Servocraft HR Solutions Pvt. Ltd. | RPFC-II, Ambattur |
24/03/2025 23/06/2025 14/08/2025 29/10/2025 16/02/2026 08/05/2026 |
None appeared on behalf of the Appellant. The Representative Counsel on behalf of the Respondent is present. List to 08.05.2026 for hearing on Arguments/filing of written submission if any. | ||
| 29272 | 150/2022 | 14B-7Q | EPF Appeal | Servocraft HR Solutions Pvt. Ltd. | RPFC-II, Ambattur |
24/03/2025 23/06/2025 14/08/2025 29/10/2025 16/02/2026 08/05/2026 |
None appeared on behalf of the Appellant. The Representative Counsel on behalf of the Respondent is present. List to 08.05.2026 for hearing on Arguments/filing of written submission if any. | ||
| 29273 | 150/2022 | 14B-7Q | EPF Appeal | Servocraft HR Solutions Pvt. Ltd. | RPFC-II, Ambattur |
24/03/2025 23/06/2025 14/08/2025 29/10/2025 16/02/2026 08/05/2026 |
None appeared on behalf of the Appellant. The Representative Counsel on behalf of the Respondent is present. List to 08.05.2026 for hearing on Arguments/filing of written submission if any. | ||
| 29274 | 150/2022 | 14B-7Q | EPF Appeal | Servocraft HR Solutions Pvt. Ltd. | RPFC-II, Ambattur |
24/03/2025 23/06/2025 14/08/2025 29/10/2025 16/02/2026 08/05/2026 |
None appeared on behalf of the Appellant. The Representative Counsel on behalf of the Respondent is present. List to 08.05.2026 for hearing on Arguments/filing of written submission if any. | ||
| 29275 | Ref.03/2021 | U/s.10 | ID | The Chairman,Bengal Bank Business Correspondents Association | Punjab National Bank | 10/01/2023 | A/D and appearence of the parties. | ||
| 29276 | 11/2017 | ID Act 1947 Reference Case | ID | The General Secretary, National Life Insurance Employees Association, J.P.Colony, Chandwara Muzaffarpur-842001 | Sr. Post Master, Head Post Office MUZAFFARPUR-842001 | 10/06/2026 | E/M | ||
| 29277 | Appeal 166/2018 | Under Section 14B | EPF Appeal | RUBCO HUAT WOODS PVT LTD | ASSISTANT PROVIDENT FUND COMMISSIONER, KANNUR | 02/09/2019 | Dismissed. Order passed | ||
| 29278 | ID CASE NO. 37/2013 | UNDER SECTION 10 | ID | THE PRESIDENT ALL ORISSA PRIVATE SECURITY KARMACHARI SANGHA PLOT NO.- 6/255, JAYADEV VIHAR NEAR BIJUPATANAIK COLLEGE BBSR | THE BRANCH-IN -CHARGE, FIREBALL SECURITY AND CONSULTANT P. LTD 1990, OPP. CBI OFFICE NEELAKANTA NAGAR BBSR |
16/02/2026 21/04/2026 |
FOR EVIDENCE | ||
| 29279 | ID CASE NO. 37/2013 | UNDER SECTION 10 | ID | THE PRESIDENT ALL ORISSA PRIVATE SECURITY KARMACHARI SANGHA PLOT NO.- 6/255, JAYADEV VIHAR NEAR BIJUPATANAIK COLLEGE BBSR | THE BRANCH-IN -CHARGE, FIREBALL SECURITY AND CONSULTANT P. LTD 1990, OPP. CBI OFFICE NEELAKANTA NAGAR BBSR |
16/02/2026 21/04/2026 |
FOR EVIDENCE | ||
| 29280 | ID CASE NO. 75/2013 | UNDER SECTION 10 | ID | THE PRESIDENT ALL ORISSA PVT SECURITY KARAMCHARI SANGH BBSR | 1. THE BRANCH-IN-CHARGE FIREBALL SECURITIES AND CONSULTANT P. LTD 1990 OPP. CBI OFFICE NEELAKANTA NAGAR BBSR 2. THE BRANCH MANAGER ICICI BANK ASHOK NAGAR BRANCH BBSR ORISSA |
16/02/2026 21/04/2026 |
FOR EVIDENCE | ||
| 29281 | ID CASE NO. 75/2013 | UNDER SECTION 10 | ID | THE PRESIDENT ALL ORISSA PVT SECURITY KARAMCHARI SANGH BBSR | 1. THE BRANCH-IN-CHARGE FIREBALL SECURITIES AND CONSULTANT P. LTD 1990 OPP. CBI OFFICE NEELAKANTA NAGAR BBSR 2. THE BRANCH MANAGER ICICI BANK ASHOK NAGAR BRANCH BBSR ORISSA |
16/02/2026 21/04/2026 |
FOR EVIDENCE | ||
| 29282 | IDC CASE NO. 61/2019 | UNDER SECTION 10 | ID | THE GENERAL SECRETARY ALL ODISHA UNION BANK EMPLOYEES ASSOCIATION C/O- UBI NAYAPALLI BRANCH 3/1 CIVIC CENTRE IRC VILLAGE BBSR | 1.. THE DEPUTY GENERAL MANAGER UBI, NODAL REGIONAL OFFICE 3/1 A CIVIC CENTRE NEAR CROWN HOTEL IRC VILLAGE NAYAPALLI BBSR 2.. THE MANAGING DIRECTOR & CEO UBI CENTRE OFFICE 239- VIDHAN SABHA MARG NARIMAN PANT MUMBAI |
16/02/2026 08/04/2026 |
FOR EVIDENCE | ||
| 29283 | IDC CASE NO. 61/2019 | UNDER SECTION 10 | ID | THE GENERAL SECRETARY ALL ODISHA UNION BANK EMPLOYEES ASSOCIATION C/O- UBI NAYAPALLI BRANCH 3/1 CIVIC CENTRE IRC VILLAGE BBSR | 1.. THE DEPUTY GENERAL MANAGER UBI, NODAL REGIONAL OFFICE 3/1 A CIVIC CENTRE NEAR CROWN HOTEL IRC VILLAGE NAYAPALLI BBSR 2.. THE MANAGING DIRECTOR & CEO UBI CENTRE OFFICE 239- VIDHAN SABHA MARG NARIMAN PANT MUMBAI |
16/02/2026 08/04/2026 |
FOR EVIDENCE | ||
| 29284 | ID CASE NO. 74/2021 | UNDER SECTION 10 | ID | THE GENERAL SECRETARY TISCO SUKINDA CHROMITE MINE CONTRACT WORKERS UNION C/O- DY CHIEF LABOUR COMMISSIONER KENDRIYA SHRAM SADAN BEHIND ISKON TEMPLE I.R.C. VILLAGE NAYAPALL BBSR | 1. THE CHIEF (MINING) M/S SUKINDA CHROMITE MINES TATA STEEL KALARANGITTA JAJPUR ORISSA 2. M/S G.G. ATWAL & CO ENGG. PVT LTD KOLKATA 3. M/S G.S. ATWAL & CO. ENGG. P. LTD CAMP SUKINDA CHROMITE MINE TATA STEEL KALARANGITTA JAJPUR |
18/03/2026 19/05/2026 |
FOR MISCELLANEOUS PURPOSE | ||
| 29285 | ID CASE NO. 74/2021 | UNDER SECTION 10 | ID | THE GENERAL SECRETARY TISCO SUKINDA CHROMITE MINE CONTRACT WORKERS UNION C/O- DY CHIEF LABOUR COMMISSIONER KENDRIYA SHRAM SADAN BEHIND ISKON TEMPLE I.R.C. VILLAGE NAYAPALL BBSR | 1. THE CHIEF (MINING) M/S SUKINDA CHROMITE MINES TATA STEEL KALARANGITTA JAJPUR ORISSA 2. M/S G.G. ATWAL & CO ENGG. PVT LTD KOLKATA 3. M/S G.S. ATWAL & CO. ENGG. P. LTD CAMP SUKINDA CHROMITE MINE TATA STEEL KALARANGITTA JAJPUR |
18/03/2026 19/05/2026 |
FOR MISCELLANEOUS PURPOSE | ||
| 29286 | IDC CASE NO. 72/2021 | UNDER SECTION | ID | THE PRESIDENT SBI KARAMCHARI UNION(CITU) VR-5/1 KHARVELA NAGAR UNIT-3 BBSR | THE CHIEF GENERAL MANAGER SBI LOCAL HEAD OFFICE, JAWAHARLAL NEHRU MARG BBSR 2. THE BRANCH MANAGER SBI BALICHARDRAPUR BRANCH JAJPUR |
06/09/2023 17/01/2024 |
FOR FILING OF STATEMENT OF CLAIM | ||
| 29287 | IDC CASE NO. 72/2021 | UNDER SECTION | ID | THE PRESIDENT SBI KARAMCHARI UNION(CITU) VR-5/1 KHARVELA NAGAR UNIT-3 BBSR | THE CHIEF GENERAL MANAGER SBI LOCAL HEAD OFFICE, JAWAHARLAL NEHRU MARG BBSR 2. THE BRANCH MANAGER SBI BALICHARDRAPUR BRANCH JAJPUR |
06/09/2023 17/01/2024 |
FOR FILING OF STATEMENT OF CLAIM | ||
| 29288 | 73/2021 | UNDER SECTION 10 | ID | THE GENERAL SECRETARY NALCO MAZDOOR SANGH QTR NO.-T/61 SECTOR-1 DAMANJODI KORAPUT | 1. THE CHIEF GENERAL MANAGER M/S NALCO CORPORATE OFFICE BBSR 2. THE EXECUTIVE DIRECTOR M/S M&R COMPLEX PO- DAMANJODI KORAPUT ORISSA |
06/09/2023 17/01/2024 |
FOR FILING OF STATEMENT OF CLAIM | ||
| 29289 | 73/2021 | UNDER SECTION 10 | ID | THE GENERAL SECRETARY NALCO MAZDOOR SANGH QTR NO.-T/61 SECTOR-1 DAMANJODI KORAPUT | 1. THE CHIEF GENERAL MANAGER M/S NALCO CORPORATE OFFICE BBSR 2. THE EXECUTIVE DIRECTOR M/S M&R COMPLEX PO- DAMANJODI KORAPUT ORISSA |
06/09/2023 17/01/2024 |
FOR FILING OF STATEMENT OF CLAIM | ||
| 29290 | ID CASE NO. 13/2018 | UNDER SECTION 10 | ID | THE GENERAL SECRETARY TISCO SUKINDA CHROMITE MINE CONTRACTOR WORKERS UNION | THE RESIDENT MANAGER, M/S G.S. ATWAL & CO. PVT LTD JAJPUR |
07/04/2026 10/06/2026 |
FOR EVIDENCE | ||
| 29291 | ID CASE NO. 13/2018 | UNDER SECTION 10 | ID | THE GENERAL SECRETARY TISCO SUKINDA CHROMITE MINE CONTRACTOR WORKERS UNION | THE RESIDENT MANAGER, M/S G.S. ATWAL & CO. PVT LTD JAJPUR |
07/04/2026 10/06/2026 |
FOR EVIDENCE | ||
| 29292 | ID CASE NO. 39/2021 | UNDER SECTION 10 | ID | THE GENERAL SECRETARY SUKINDA UPATYAKA MINES WORKERS UNION SARUBIL, PO- KANASA VIA- SUKINDA JAJPUR | THE CHIEF EXECUTIVE OFFICER M/S MISHRILAL MINES LTD. 27A CAMAC STREET KOLKATA |
06/09/2023 17/01/2024 |
FOR FILING OF STATEMENT OF CLAIM BY THE 2ND PARTY-UNION | ||
| 29293 | ID CASE NO. 39/2021 | UNDER SECTION 10 | ID | THE GENERAL SECRETARY SUKINDA UPATYAKA MINES WORKERS UNION SARUBIL, PO- KANASA VIA- SUKINDA JAJPUR | THE CHIEF EXECUTIVE OFFICER M/S MISHRILAL MINES LTD. 27A CAMAC STREET KOLKATA |
06/09/2023 17/01/2024 |
FOR FILING OF STATEMENT OF CLAIM BY THE 2ND PARTY-UNION | ||
| 29294 | 166/2022 [M.P. 1 of 2022 in ATA No. 849(13)2011] | 7A | EPF Appeal | The Coimbatore District Central Bank Ltd. | APFC, Coimbatore |
02/04/2025 13/05/2025 18/06/2025 03/07/2025 28/07/2025 04/08/2025 10/10/2025 31/10/2025 19/02/2026 |
Final Order - No interference is required in the Impugned Order. | ||
| 29295 | 166/2022 [M.P. 1 of 2022 in ATA No. 849(13)2011] | 7A | EPF Appeal | The Coimbatore District Central Bank Ltd. | APFC, Coimbatore |
02/04/2025 13/05/2025 18/06/2025 03/07/2025 28/07/2025 04/08/2025 10/10/2025 31/10/2025 19/02/2026 |
Final Order - No interference is required in the Impugned Order. | ||
| 29296 | 166/2022 [M.P. 1 of 2022 in ATA No. 849(13)2011] | 7A | EPF Appeal | The Coimbatore District Central Bank Ltd. | APFC, Coimbatore |
02/04/2025 13/05/2025 18/06/2025 03/07/2025 28/07/2025 04/08/2025 10/10/2025 31/10/2025 19/02/2026 |
Final Order - No interference is required in the Impugned Order. | ||
| 29297 | 166/2022 [M.P. 1 of 2022 in ATA No. 849(13)2011] | 7A | EPF Appeal | The Coimbatore District Central Bank Ltd. | APFC, Coimbatore |
02/04/2025 13/05/2025 18/06/2025 03/07/2025 28/07/2025 04/08/2025 10/10/2025 31/10/2025 19/02/2026 |
Final Order - No interference is required in the Impugned Order. | ||
| 29298 | 166/2022 [M.P. 1 of 2022 in ATA No. 849(13)2011] | 7A | EPF Appeal | The Coimbatore District Central Bank Ltd. | APFC, Coimbatore |
02/04/2025 13/05/2025 18/06/2025 03/07/2025 28/07/2025 04/08/2025 10/10/2025 31/10/2025 19/02/2026 |
Final Order - No interference is required in the Impugned Order. | ||
| 29299 | 166/2022 [M.P. 1 of 2022 in ATA No. 849(13)2011] | 7A | EPF Appeal | The Coimbatore District Central Bank Ltd. | APFC, Coimbatore |
02/04/2025 13/05/2025 18/06/2025 03/07/2025 28/07/2025 04/08/2025 10/10/2025 31/10/2025 19/02/2026 |
Final Order - No interference is required in the Impugned Order. | ||
| 29300 | 166/2022 [M.P. 1 of 2022 in ATA No. 849(13)2011] | 7A | EPF Appeal | The Coimbatore District Central Bank Ltd. | APFC, Coimbatore |
02/04/2025 13/05/2025 18/06/2025 03/07/2025 28/07/2025 04/08/2025 10/10/2025 31/10/2025 19/02/2026 |
Final Order - No interference is required in the Impugned Order. |