51601 127/2019 14B-7Q EPF Appeal Dong Sung Automotive India Private Limited RPFC, Vellore 24/06/2025
11/08/2025
22/10/2025
28/01/2026
29/04/2026
08/07/2026
17/07/2026
M/s. Vijay Rahul for Advit Law Chambers, the Representative Counsel on behalf of the Appellant and M/s.P.K.PanneerSelvam, the learned Counsel on behalf of the Respondent pray to list the Appeal in the Special Campaign. List to 17.07.2026 for hearing in th
51602 127/2019 14B-7Q EPF Appeal Dong Sung Automotive India Private Limited RPFC, Vellore 24/06/2025
11/08/2025
22/10/2025
28/01/2026
29/04/2026
08/07/2026
17/07/2026
M/s. Vijay Rahul for Advit Law Chambers, the Representative Counsel on behalf of the Appellant and M/s.P.K.PanneerSelvam, the learned Counsel on behalf of the Respondent pray to list the Appeal in the Special Campaign. List to 17.07.2026 for hearing in th
51603 128/2019 14B-7Q EPF Appeal Dong sung Automotive India Private Limited RPFC, Vellore 25/03/2025
24/06/2025
11/08/2025
22/10/2025
28/01/2026
29/04/2026
09/07/2026
16/07/2026
23/07/2026
M/s. Vijay Rahul for Advit Law Chambers, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 23.07.2026 for hearing on Arguments/filin
51604 128/2019 14B-7Q EPF Appeal Dong sung Automotive India Private Limited RPFC, Vellore 25/03/2025
24/06/2025
11/08/2025
22/10/2025
28/01/2026
29/04/2026
09/07/2026
16/07/2026
23/07/2026
M/s. Vijay Rahul for Advit Law Chambers, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 23.07.2026 for hearing on Arguments/filin
51605 128/2019 14B-7Q EPF Appeal Dong sung Automotive India Private Limited RPFC, Vellore 25/03/2025
24/06/2025
11/08/2025
22/10/2025
28/01/2026
29/04/2026
09/07/2026
16/07/2026
23/07/2026
M/s. Vijay Rahul for Advit Law Chambers, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 23.07.2026 for hearing on Arguments/filin
51606 128/2019 14B-7Q EPF Appeal Dong sung Automotive India Private Limited RPFC, Vellore 25/03/2025
24/06/2025
11/08/2025
22/10/2025
28/01/2026
29/04/2026
09/07/2026
16/07/2026
23/07/2026
M/s. Vijay Rahul for Advit Law Chambers, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 23.07.2026 for hearing on Arguments/filin
51607 128/2019 14B-7Q EPF Appeal Dong sung Automotive India Private Limited RPFC, Vellore 25/03/2025
24/06/2025
11/08/2025
22/10/2025
28/01/2026
29/04/2026
09/07/2026
16/07/2026
23/07/2026
M/s. Vijay Rahul for Advit Law Chambers, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 23.07.2026 for hearing on Arguments/filin
51608 128/2019 14B-7Q EPF Appeal Dong sung Automotive India Private Limited RPFC, Vellore 25/03/2025
24/06/2025
11/08/2025
22/10/2025
28/01/2026
29/04/2026
09/07/2026
16/07/2026
23/07/2026
M/s. Vijay Rahul for Advit Law Chambers, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 23.07.2026 for hearing on Arguments/filin
51609 128/2019 14B-7Q EPF Appeal Dong sung Automotive India Private Limited RPFC, Vellore 25/03/2025
24/06/2025
11/08/2025
22/10/2025
28/01/2026
29/04/2026
09/07/2026
16/07/2026
23/07/2026
M/s. Vijay Rahul for Advit Law Chambers, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 23.07.2026 for hearing on Arguments/filin
51610 128/2019 14B-7Q EPF Appeal Dong sung Automotive India Private Limited RPFC, Vellore 25/03/2025
24/06/2025
11/08/2025
22/10/2025
28/01/2026
29/04/2026
09/07/2026
16/07/2026
23/07/2026
M/s. Vijay Rahul for Advit Law Chambers, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 23.07.2026 for hearing on Arguments/filin
51611 128/2019 14B-7Q EPF Appeal Dong sung Automotive India Private Limited RPFC, Vellore 25/03/2025
24/06/2025
11/08/2025
22/10/2025
28/01/2026
29/04/2026
09/07/2026
16/07/2026
23/07/2026
M/s. Vijay Rahul for Advit Law Chambers, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. P. K. PanneerSelvam, the learned Counsel on behalf of the Respondent is present. List to 23.07.2026 for hearing on Arguments/filin
51612 129/2019 14B-7Q EPF Appeal Dong Sung Automotive India Pvt. Ltd., RPFC, Vellore 02/07/2025
01/09/2025
07/11/2025
13/02/2026
08/05/2026
13/07/2026
21/07/2026
M/s. Haroon Al Rasheed, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. The Representative Counsel (for M/s. P. K. PanneerSelvam) on behalf of the Respondent is present List to 21.07.2026 for hearing on Arguments/filing of w
51613 129/2019 14B-7Q EPF Appeal Dong Sung Automotive India Pvt. Ltd., RPFC, Vellore 02/07/2025
01/09/2025
07/11/2025
13/02/2026
08/05/2026
13/07/2026
21/07/2026
M/s. Haroon Al Rasheed, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. The Representative Counsel (for M/s. P. K. PanneerSelvam) on behalf of the Respondent is present List to 21.07.2026 for hearing on Arguments/filing of w
51614 129/2019 14B-7Q EPF Appeal Dong Sung Automotive India Pvt. Ltd., RPFC, Vellore 02/07/2025
01/09/2025
07/11/2025
13/02/2026
08/05/2026
13/07/2026
21/07/2026
M/s. Haroon Al Rasheed, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. The Representative Counsel (for M/s. P. K. PanneerSelvam) on behalf of the Respondent is present List to 21.07.2026 for hearing on Arguments/filing of w
51615 129/2019 14B-7Q EPF Appeal Dong Sung Automotive India Pvt. Ltd., RPFC, Vellore 02/07/2025
01/09/2025
07/11/2025
13/02/2026
08/05/2026
13/07/2026
21/07/2026
M/s. Haroon Al Rasheed, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. The Representative Counsel (for M/s. P. K. PanneerSelvam) on behalf of the Respondent is present List to 21.07.2026 for hearing on Arguments/filing of w
51616 129/2019 14B-7Q EPF Appeal Dong Sung Automotive India Pvt. Ltd., RPFC, Vellore 02/07/2025
01/09/2025
07/11/2025
13/02/2026
08/05/2026
13/07/2026
21/07/2026
M/s. Haroon Al Rasheed, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. The Representative Counsel (for M/s. P. K. PanneerSelvam) on behalf of the Respondent is present List to 21.07.2026 for hearing on Arguments/filing of w
51617 129/2019 14B-7Q EPF Appeal Dong Sung Automotive India Pvt. Ltd., RPFC, Vellore 02/07/2025
01/09/2025
07/11/2025
13/02/2026
08/05/2026
13/07/2026
21/07/2026
M/s. Haroon Al Rasheed, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. The Representative Counsel (for M/s. P. K. PanneerSelvam) on behalf of the Respondent is present List to 21.07.2026 for hearing on Arguments/filing of w
51618 129/2019 14B-7Q EPF Appeal Dong Sung Automotive India Pvt. Ltd., RPFC, Vellore 02/07/2025
01/09/2025
07/11/2025
13/02/2026
08/05/2026
13/07/2026
21/07/2026
M/s. Haroon Al Rasheed, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. The Representative Counsel (for M/s. P. K. PanneerSelvam) on behalf of the Respondent is present List to 21.07.2026 for hearing on Arguments/filing of w
51619 166/2019 14B EPF Appeal K.Chinnu-Co- Construction Pvt Ltd. RPFC-II, Coimbatore 20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
Final Order - The Appeal stands dismissed for want of prosecution.
51620 166/2019 14B EPF Appeal K.Chinnu-Co- Construction Pvt Ltd. RPFC-II, Coimbatore 20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
Final Order - The Appeal stands dismissed for want of prosecution.
51621 166/2019 14B EPF Appeal K.Chinnu-Co- Construction Pvt Ltd. RPFC-II, Coimbatore 20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
Final Order - The Appeal stands dismissed for want of prosecution.
51622 166/2019 14B EPF Appeal K.Chinnu-Co- Construction Pvt Ltd. RPFC-II, Coimbatore 20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
Final Order - The Appeal stands dismissed for want of prosecution.
51623 166/2019 14B EPF Appeal K.Chinnu-Co- Construction Pvt Ltd. RPFC-II, Coimbatore 20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
Final Order - The Appeal stands dismissed for want of prosecution.
51624 166/2019 14B EPF Appeal K.Chinnu-Co- Construction Pvt Ltd. RPFC-II, Coimbatore 20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
Final Order - The Appeal stands dismissed for want of prosecution.
51625 167/2019 14B EPF Appeal Eco Pure Technologies Pvt. Ltd., RPFC, Coimbatore 04/06/2025
31/07/2025
26/08/2025
19/11/2025
24/12/2025
02/02/2026
02/04/2026
10/04/2026
05/06/2026
Final Order - The Appeal is partly allowed. The Amount assessed by Respondent Authority is waived off to 40%. Appellant is directed to remit 60% of assessed amount within 6 months to Respondent.
51626 167/2019 14B EPF Appeal Eco Pure Technologies Pvt. Ltd., RPFC, Coimbatore 04/06/2025
31/07/2025
26/08/2025
19/11/2025
24/12/2025
02/02/2026
02/04/2026
10/04/2026
05/06/2026
Final Order - The Appeal is partly allowed. The Amount assessed by Respondent Authority is waived off to 40%. Appellant is directed to remit 60% of assessed amount within 6 months to Respondent.
51627 167/2019 14B EPF Appeal Eco Pure Technologies Pvt. Ltd., RPFC, Coimbatore 04/06/2025
31/07/2025
26/08/2025
19/11/2025
24/12/2025
02/02/2026
02/04/2026
10/04/2026
05/06/2026
Final Order - The Appeal is partly allowed. The Amount assessed by Respondent Authority is waived off to 40%. Appellant is directed to remit 60% of assessed amount within 6 months to Respondent.
51628 167/2019 14B EPF Appeal Eco Pure Technologies Pvt. Ltd., RPFC, Coimbatore 04/06/2025
31/07/2025
26/08/2025
19/11/2025
24/12/2025
02/02/2026
02/04/2026
10/04/2026
05/06/2026
Final Order - The Appeal is partly allowed. The Amount assessed by Respondent Authority is waived off to 40%. Appellant is directed to remit 60% of assessed amount within 6 months to Respondent.
51629 167/2019 14B EPF Appeal Eco Pure Technologies Pvt. Ltd., RPFC, Coimbatore 04/06/2025
31/07/2025
26/08/2025
19/11/2025
24/12/2025
02/02/2026
02/04/2026
10/04/2026
05/06/2026
Final Order - The Appeal is partly allowed. The Amount assessed by Respondent Authority is waived off to 40%. Appellant is directed to remit 60% of assessed amount within 6 months to Respondent.
51630 167/2019 14B EPF Appeal Eco Pure Technologies Pvt. Ltd., RPFC, Coimbatore 04/06/2025
31/07/2025
26/08/2025
19/11/2025
24/12/2025
02/02/2026
02/04/2026
10/04/2026
05/06/2026
Final Order - The Appeal is partly allowed. The Amount assessed by Respondent Authority is waived off to 40%. Appellant is directed to remit 60% of assessed amount within 6 months to Respondent.
51631 167/2019 14B EPF Appeal Eco Pure Technologies Pvt. Ltd., RPFC, Coimbatore 04/06/2025
31/07/2025
26/08/2025
19/11/2025
24/12/2025
02/02/2026
02/04/2026
10/04/2026
05/06/2026
Final Order - The Appeal is partly allowed. The Amount assessed by Respondent Authority is waived off to 40%. Appellant is directed to remit 60% of assessed amount within 6 months to Respondent.
51632 167/2019 14B EPF Appeal Eco Pure Technologies Pvt. Ltd., RPFC, Coimbatore 04/06/2025
31/07/2025
26/08/2025
19/11/2025
24/12/2025
02/02/2026
02/04/2026
10/04/2026
05/06/2026
Final Order - The Appeal is partly allowed. The Amount assessed by Respondent Authority is waived off to 40%. Appellant is directed to remit 60% of assessed amount within 6 months to Respondent.
51633 167/2019 14B EPF Appeal Eco Pure Technologies Pvt. Ltd., RPFC, Coimbatore 04/06/2025
31/07/2025
26/08/2025
19/11/2025
24/12/2025
02/02/2026
02/04/2026
10/04/2026
05/06/2026
Final Order - The Appeal is partly allowed. The Amount assessed by Respondent Authority is waived off to 40%. Appellant is directed to remit 60% of assessed amount within 6 months to Respondent.
51634 168/2019 14B EPF Appeal Primex Apparel Sourcing Services RPFC-II, Coimbatore 10/05/2024
20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
19/12/2025
03/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 32% of the assessed amount is waived off.
51635 168/2019 14B EPF Appeal Primex Apparel Sourcing Services RPFC-II, Coimbatore 10/05/2024
20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
19/12/2025
03/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 32% of the assessed amount is waived off.
51636 168/2019 14B EPF Appeal Primex Apparel Sourcing Services RPFC-II, Coimbatore 10/05/2024
20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
19/12/2025
03/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 32% of the assessed amount is waived off.
51637 168/2019 14B EPF Appeal Primex Apparel Sourcing Services RPFC-II, Coimbatore 10/05/2024
20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
19/12/2025
03/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 32% of the assessed amount is waived off.
51638 168/2019 14B EPF Appeal Primex Apparel Sourcing Services RPFC-II, Coimbatore 10/05/2024
20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
19/12/2025
03/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 32% of the assessed amount is waived off.
51639 168/2019 14B EPF Appeal Primex Apparel Sourcing Services RPFC-II, Coimbatore 10/05/2024
20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
19/12/2025
03/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 32% of the assessed amount is waived off.
51640 168/2019 14B EPF Appeal Primex Apparel Sourcing Services RPFC-II, Coimbatore 10/05/2024
20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
19/12/2025
03/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 32% of the assessed amount is waived off.
51641 168/2019 14B EPF Appeal Primex Apparel Sourcing Services RPFC-II, Coimbatore 10/05/2024
20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
19/12/2025
03/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 32% of the assessed amount is waived off.
51642 168/2019 14B EPF Appeal Primex Apparel Sourcing Services RPFC-II, Coimbatore 10/05/2024
20/08/2024
21/11/2024
28/02/2025
23/05/2025
20/08/2025
07/11/2025
19/12/2025
03/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 32% of the assessed amount is waived off.
51643 169/2019 14B EPF Appeal JJ College of Engineering and Technology RPFC-II, Trichy 07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 33% of the assessed amount passed by the Respondent order dated 06.05.2019 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
51644 169/2019 14B EPF Appeal JJ College of Engineering and Technology RPFC-II, Trichy 07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 33% of the assessed amount passed by the Respondent order dated 06.05.2019 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
51645 169/2019 14B EPF Appeal JJ College of Engineering and Technology RPFC-II, Trichy 07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 33% of the assessed amount passed by the Respondent order dated 06.05.2019 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
51646 169/2019 14B EPF Appeal JJ College of Engineering and Technology RPFC-II, Trichy 07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 33% of the assessed amount passed by the Respondent order dated 06.05.2019 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
51647 169/2019 14B EPF Appeal JJ College of Engineering and Technology RPFC-II, Trichy 07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 33% of the assessed amount passed by the Respondent order dated 06.05.2019 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
51648 169/2019 14B EPF Appeal JJ College of Engineering and Technology RPFC-II, Trichy 07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 33% of the assessed amount passed by the Respondent order dated 06.05.2019 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
51649 169/2019 14B EPF Appeal JJ College of Engineering and Technology RPFC-II, Trichy 07/11/2024
13/02/2025
08/05/2025
06/08/2025
15/10/2025
16/01/2026
16/04/2026
Final Order - 33% of the assessed amount passed by the Respondent order dated 06.05.2019 is waived. The Respondent will recover remaining 68% of the assessed amount from the Appellant establishment in accordance with law.
51650 170/2019 14B EPF Appeal E-Animedia Solutions Pvt. Ltd., APFC, Chennai 04/11/2024
10/02/2025
05/05/2025
25/07/2025
25/09/2025
01/01/2026
04/02/2026
06/05/2026
13/07/2026
04/09/2026
The Counsel on behalf of the Appellant prays time for Arguments. Time granted. The learned Counsel on behalf of the Respondent is present List to 04.09.2026 for hearing on Arguments/filing of written submission.

Pages

CSV