| S.No. | Case No. | Subject | Case Type | Name of Appellant | Respondent | Next Date | Details | Order / Decision | Edit |
|---|---|---|---|---|---|---|---|---|---|
| 78201 | 189/2018 | 14B | EPF Appeal | Anglo French Textiles | APFC, Puducherry | 05/03/2019 | |||
| 78202 | 49/2017 | 14B | East Coast Constructions & Industries Ltd. | APFC, Chennai | 05/03/2019 | ||||
| 78203 | 182/2018 | 14B | EPF Appeal | PNECT Kamraj Matriculation Higher Secondary School | APFC, Chennai |
05/03/2019 14/11/2019 10/02/2020 13/02/2020 20/02/2020 21/02/2020 |
Final Order - Appeal stands dismissed. | ||
| 78204 | 182/2018 | 14B | EPF Appeal | PNECT Kamraj Matriculation Higher Secondary School | APFC, Chennai |
05/03/2019 14/11/2019 10/02/2020 13/02/2020 20/02/2020 21/02/2020 |
Final Order - Appeal stands dismissed. | ||
| 78205 | 182/2018 | 14B | EPF Appeal | PNECT Kamraj Matriculation Higher Secondary School | APFC, Chennai |
05/03/2019 14/11/2019 10/02/2020 13/02/2020 20/02/2020 21/02/2020 |
Final Order - Appeal stands dismissed. | ||
| 78206 | 182/2018 | 14B | EPF Appeal | PNECT Kamraj Matriculation Higher Secondary School | APFC, Chennai |
05/03/2019 14/11/2019 10/02/2020 13/02/2020 20/02/2020 21/02/2020 |
Final Order - Appeal stands dismissed. | ||
| 78207 | 182/2018 | 14B | EPF Appeal | PNECT Kamraj Matriculation Higher Secondary School | APFC, Chennai |
05/03/2019 14/11/2019 10/02/2020 13/02/2020 20/02/2020 21/02/2020 |
Final Order - Appeal stands dismissed. | ||
| 78208 | 182/2018 | 14B | EPF Appeal | PNECT Kamraj Matriculation Higher Secondary School | APFC, Chennai |
05/03/2019 14/11/2019 10/02/2020 13/02/2020 20/02/2020 21/02/2020 |
Final Order - Appeal stands dismissed. | ||
| 78209 | 185/2018 | 14B-7Q | EPF Appeal | Enmas GB Power Systems Projects Ltd. | APFC, Chennai |
08/07/2024 09/10/2024 08/01/2025 09/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 78210 | 185/2018 | 14B-7Q | EPF Appeal | Enmas GB Power Systems Projects Ltd. | APFC, Chennai |
08/07/2024 09/10/2024 08/01/2025 09/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 78211 | 185/2018 | 14B-7Q | EPF Appeal | Enmas GB Power Systems Projects Ltd. | APFC, Chennai |
08/07/2024 09/10/2024 08/01/2025 09/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 78212 | 185/2018 | 14B-7Q | EPF Appeal | Enmas GB Power Systems Projects Ltd. | APFC, Chennai |
08/07/2024 09/10/2024 08/01/2025 09/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 78213 | 185/2018 | 14B-7Q | EPF Appeal | Enmas GB Power Systems Projects Ltd. | APFC, Chennai |
08/07/2024 09/10/2024 08/01/2025 09/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 78214 | 185/2018 | 14B-7Q | EPF Appeal | Enmas GB Power Systems Projects Ltd. | APFC, Chennai |
08/07/2024 09/10/2024 08/01/2025 09/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 78215 | 185/2018 | 14B-7Q | EPF Appeal | Enmas GB Power Systems Projects Ltd. | APFC, Chennai |
08/07/2024 09/10/2024 08/01/2025 09/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 78216 | 185/2018 | 14B-7Q | EPF Appeal | Enmas GB Power Systems Projects Ltd. | APFC, Chennai |
08/07/2024 09/10/2024 08/01/2025 09/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 78217 | 185/2018 | 14B-7Q | EPF Appeal | Enmas GB Power Systems Projects Ltd. | APFC, Chennai |
08/07/2024 09/10/2024 08/01/2025 09/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 78218 | 195/2018 | 7A | EPF Appeal | Casino Air Caterers and Flight Services | APFC, Chennai | 05/03/2019 | |||
| 78219 | 196/2018 | 7A | EPF Appeal | Sundaram Fasteners Ltd. | APFC, Chennai |
08/07/2024 09/10/2024 08/01/2025 09/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 78220 | 196/2018 | 7A | EPF Appeal | Sundaram Fasteners Ltd. | APFC, Chennai |
08/07/2024 09/10/2024 08/01/2025 09/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 78221 | 196/2018 | 7A | EPF Appeal | Sundaram Fasteners Ltd. | APFC, Chennai |
08/07/2024 09/10/2024 08/01/2025 09/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 78222 | 196/2018 | 7A | EPF Appeal | Sundaram Fasteners Ltd. | APFC, Chennai |
08/07/2024 09/10/2024 08/01/2025 09/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 78223 | 196/2018 | 7A | EPF Appeal | Sundaram Fasteners Ltd. | APFC, Chennai |
08/07/2024 09/10/2024 08/01/2025 09/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 78224 | 196/2018 | 7A | EPF Appeal | Sundaram Fasteners Ltd. | APFC, Chennai |
08/07/2024 09/10/2024 08/01/2025 09/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 78225 | 196/2018 | 7A | EPF Appeal | Sundaram Fasteners Ltd. | APFC, Chennai |
08/07/2024 09/10/2024 08/01/2025 09/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 78226 | 196/2018 | 7A | EPF Appeal | Sundaram Fasteners Ltd. | APFC, Chennai |
08/07/2024 09/10/2024 08/01/2025 09/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 78227 | 196/2018 | 7A | EPF Appeal | Sundaram Fasteners Ltd. | APFC, Chennai |
08/07/2024 09/10/2024 08/01/2025 09/04/2025 08/07/2025 03/09/2025 03/12/2025 11/03/2026 27/05/2026 |
The Counsel on behalf of the Appellant prays for time. Time granted. The learned Counsel on behalf of the Respondent is present. List to 11.03.2026 for hearing on Arguments/filing of written submission. | ||
| 78228 | 198/2018 | 7A | EPF Appeal | Matrimony Com (P) Ltd., | RPFC, Chennai |
19/06/2025 27/06/2025 28/08/2025 20/11/2025 24/12/2025 28/01/2026 17/04/2026 01/07/2026 |
M/s. Chellapillai, the learned Counsel on behalf of the Appellant is present. M/s. R. Vishnu, the Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 01.07.2026 for hearing on Arguments/filing of written submission. | ||
| 78229 | 198/2018 | 7A | EPF Appeal | Matrimony Com (P) Ltd., | RPFC, Chennai |
19/06/2025 27/06/2025 28/08/2025 20/11/2025 24/12/2025 28/01/2026 17/04/2026 01/07/2026 |
M/s. Chellapillai, the learned Counsel on behalf of the Appellant is present. M/s. R. Vishnu, the Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 01.07.2026 for hearing on Arguments/filing of written submission. | ||
| 78230 | 198/2018 | 7A | EPF Appeal | Matrimony Com (P) Ltd., | RPFC, Chennai |
19/06/2025 27/06/2025 28/08/2025 20/11/2025 24/12/2025 28/01/2026 17/04/2026 01/07/2026 |
M/s. Chellapillai, the learned Counsel on behalf of the Appellant is present. M/s. R. Vishnu, the Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 01.07.2026 for hearing on Arguments/filing of written submission. | ||
| 78231 | 198/2018 | 7A | EPF Appeal | Matrimony Com (P) Ltd., | RPFC, Chennai |
19/06/2025 27/06/2025 28/08/2025 20/11/2025 24/12/2025 28/01/2026 17/04/2026 01/07/2026 |
M/s. Chellapillai, the learned Counsel on behalf of the Appellant is present. M/s. R. Vishnu, the Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 01.07.2026 for hearing on Arguments/filing of written submission. | ||
| 78232 | 198/2018 | 7A | EPF Appeal | Matrimony Com (P) Ltd., | RPFC, Chennai |
19/06/2025 27/06/2025 28/08/2025 20/11/2025 24/12/2025 28/01/2026 17/04/2026 01/07/2026 |
M/s. Chellapillai, the learned Counsel on behalf of the Appellant is present. M/s. R. Vishnu, the Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 01.07.2026 for hearing on Arguments/filing of written submission. | ||
| 78233 | 198/2018 | 7A | EPF Appeal | Matrimony Com (P) Ltd., | RPFC, Chennai |
19/06/2025 27/06/2025 28/08/2025 20/11/2025 24/12/2025 28/01/2026 17/04/2026 01/07/2026 |
M/s. Chellapillai, the learned Counsel on behalf of the Appellant is present. M/s. R. Vishnu, the Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 01.07.2026 for hearing on Arguments/filing of written submission. | ||
| 78234 | 198/2018 | 7A | EPF Appeal | Matrimony Com (P) Ltd., | RPFC, Chennai |
19/06/2025 27/06/2025 28/08/2025 20/11/2025 24/12/2025 28/01/2026 17/04/2026 01/07/2026 |
M/s. Chellapillai, the learned Counsel on behalf of the Appellant is present. M/s. R. Vishnu, the Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 01.07.2026 for hearing on Arguments/filing of written submission. | ||
| 78235 | 198/2018 | 7A | EPF Appeal | Matrimony Com (P) Ltd., | RPFC, Chennai |
19/06/2025 27/06/2025 28/08/2025 20/11/2025 24/12/2025 28/01/2026 17/04/2026 01/07/2026 |
M/s. Chellapillai, the learned Counsel on behalf of the Appellant is present. M/s. R. Vishnu, the Counsel on behalf of the Respondent prays time for Arguments. Time granted. List to 01.07.2026 for hearing on Arguments/filing of written submission. | ||
| 78236 | EPFA No. 02/2019 | 7-A & 7-B | EPF Appeal | L.I.C., Asansol | APFC, Durgapur | Judgement Passed | |||
| 78237 | EPFA No. 01/2019 | 7-A & 7-Q | EPF Appeal | Manik Chandra Kundu | APFC, Durgapur | 01/02/2024 | Award Reserved | ||
| 78238 | EPFA No. 02/2018 | 14-B & 7-Q | EPF Appeal | B.S.N.L., Durgapur | APFC, Durgapur | 30/08/2024 | Appeal dismissed on contest | ||
| 78239 | 200/2018 | 7A | EPF Appeal | Indo International Fertilizers Ltd. | APFC, Trichy |
13/06/2023 25/07/2023 21/11/2023 26/03/2024 18/06/2024 25/09/2024 26/12/2024 26/03/2025 24/06/2025 |
Final Order - Appeal is dismissed for want of prosecution. | ||
| 78240 | 200/2018 | 7A | EPF Appeal | Indo International Fertilizers Ltd. | APFC, Trichy |
13/06/2023 25/07/2023 21/11/2023 26/03/2024 18/06/2024 25/09/2024 26/12/2024 26/03/2025 24/06/2025 |
Final Order - Appeal is dismissed for want of prosecution. | ||
| 78241 | 200/2018 | 7A | EPF Appeal | Indo International Fertilizers Ltd. | APFC, Trichy |
13/06/2023 25/07/2023 21/11/2023 26/03/2024 18/06/2024 25/09/2024 26/12/2024 26/03/2025 24/06/2025 |
Final Order - Appeal is dismissed for want of prosecution. | ||
| 78242 | 200/2018 | 7A | EPF Appeal | Indo International Fertilizers Ltd. | APFC, Trichy |
13/06/2023 25/07/2023 21/11/2023 26/03/2024 18/06/2024 25/09/2024 26/12/2024 26/03/2025 24/06/2025 |
Final Order - Appeal is dismissed for want of prosecution. | ||
| 78243 | 200/2018 | 7A | EPF Appeal | Indo International Fertilizers Ltd. | APFC, Trichy |
13/06/2023 25/07/2023 21/11/2023 26/03/2024 18/06/2024 25/09/2024 26/12/2024 26/03/2025 24/06/2025 |
Final Order - Appeal is dismissed for want of prosecution. | ||
| 78244 | 200/2018 | 7A | EPF Appeal | Indo International Fertilizers Ltd. | APFC, Trichy |
13/06/2023 25/07/2023 21/11/2023 26/03/2024 18/06/2024 25/09/2024 26/12/2024 26/03/2025 24/06/2025 |
Final Order - Appeal is dismissed for want of prosecution. | ||
| 78245 | 200/2018 | 7A | EPF Appeal | Indo International Fertilizers Ltd. | APFC, Trichy |
13/06/2023 25/07/2023 21/11/2023 26/03/2024 18/06/2024 25/09/2024 26/12/2024 26/03/2025 24/06/2025 |
Final Order - Appeal is dismissed for want of prosecution. | ||
| 78246 | 200/2018 | 7A | EPF Appeal | Indo International Fertilizers Ltd. | APFC, Trichy |
13/06/2023 25/07/2023 21/11/2023 26/03/2024 18/06/2024 25/09/2024 26/12/2024 26/03/2025 24/06/2025 |
Final Order - Appeal is dismissed for want of prosecution. | ||
| 78247 | 200/2018 | 7A | EPF Appeal | Indo International Fertilizers Ltd. | APFC, Trichy |
13/06/2023 25/07/2023 21/11/2023 26/03/2024 18/06/2024 25/09/2024 26/12/2024 26/03/2025 24/06/2025 |
Final Order - Appeal is dismissed for want of prosecution. | ||
| 78248 | 190/2018 | 14B | EPF Appeal | AM Engineering | APFC, Trichy |
13/11/2020 25/03/2021 27/08/2021 09/11/2021 23/02/2022 27/05/2022 |
Final Orders-The Appeal stands dismissed. | ||
| 78249 | 190/2018 | 14B | EPF Appeal | AM Engineering | APFC, Trichy |
13/11/2020 25/03/2021 27/08/2021 09/11/2021 23/02/2022 27/05/2022 |
Final Orders-The Appeal stands dismissed. | ||
| 78250 | 190/2018 | 14B | EPF Appeal | AM Engineering | APFC, Trichy |
13/11/2020 25/03/2021 27/08/2021 09/11/2021 23/02/2022 27/05/2022 |
Final Orders-The Appeal stands dismissed. |