38301 72/2021 7A EPF Appeal DD 107 Sillamarathupatti Primary Agricultural Co-operative Bank APFC, Madurai & another 09/08/2024
18/11/2024
24/02/2025
19/05/2025
08/08/2025
22/08/2025
13/11/2025
19/02/2026
14/05/2026
The Counsel for the Appellant filed the petition seeking adjournment. Petition allowed. The learned Counsel on behalf of the Respondent is present. List to 14.05.2026 for hearing on Arguments/fling of written submission.
38302 72/2021 7A EPF Appeal DD 107 Sillamarathupatti Primary Agricultural Co-operative Bank APFC, Madurai & another 09/08/2024
18/11/2024
24/02/2025
19/05/2025
08/08/2025
22/08/2025
13/11/2025
19/02/2026
14/05/2026
The Counsel for the Appellant filed the petition seeking adjournment. Petition allowed. The learned Counsel on behalf of the Respondent is present. List to 14.05.2026 for hearing on Arguments/fling of written submission.
38303 72/2021 7A EPF Appeal DD 107 Sillamarathupatti Primary Agricultural Co-operative Bank APFC, Madurai & another 09/08/2024
18/11/2024
24/02/2025
19/05/2025
08/08/2025
22/08/2025
13/11/2025
19/02/2026
14/05/2026
The Counsel for the Appellant filed the petition seeking adjournment. Petition allowed. The learned Counsel on behalf of the Respondent is present. List to 14.05.2026 for hearing on Arguments/fling of written submission.
38304 71/2021 14B EPF Appeal Q 1247 - Alavidangan Primary Agricultural Co-operative Bank Ltd. APFC, Madurai 24/03/2025
23/06/2025
14/08/2025
29/10/2025
17/02/2026
19/02/2026
Final Order - 35% of the assessed amount passed by the Respondent order dated 02.06.2021 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law.
38305 71/2021 14B EPF Appeal Q 1247 - Alavidangan Primary Agricultural Co-operative Bank Ltd. APFC, Madurai 24/03/2025
23/06/2025
14/08/2025
29/10/2025
17/02/2026
19/02/2026
Final Order - 35% of the assessed amount passed by the Respondent order dated 02.06.2021 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law.
38306 71/2021 14B EPF Appeal Q 1247 - Alavidangan Primary Agricultural Co-operative Bank Ltd. APFC, Madurai 24/03/2025
23/06/2025
14/08/2025
29/10/2025
17/02/2026
19/02/2026
Final Order - 35% of the assessed amount passed by the Respondent order dated 02.06.2021 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law.
38307 71/2021 14B EPF Appeal Q 1247 - Alavidangan Primary Agricultural Co-operative Bank Ltd. APFC, Madurai 24/03/2025
23/06/2025
14/08/2025
29/10/2025
17/02/2026
19/02/2026
Final Order - 35% of the assessed amount passed by the Respondent order dated 02.06.2021 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law.
38308 71/2021 14B EPF Appeal Q 1247 - Alavidangan Primary Agricultural Co-operative Bank Ltd. APFC, Madurai 24/03/2025
23/06/2025
14/08/2025
29/10/2025
17/02/2026
19/02/2026
Final Order - 35% of the assessed amount passed by the Respondent order dated 02.06.2021 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law.
38309 71/2021 14B EPF Appeal Q 1247 - Alavidangan Primary Agricultural Co-operative Bank Ltd. APFC, Madurai 24/03/2025
23/06/2025
14/08/2025
29/10/2025
17/02/2026
19/02/2026
Final Order - 35% of the assessed amount passed by the Respondent order dated 02.06.2021 is waived. The Respondent will recover remaining 65% of the assessed amount from the Appellant establishment in accordance with law.
38310 70/2021 7A EPF Appeal Bensam Hospital and Surgical Nursing Home APFC, Nagercoil 05/11/2024
11/02/2025
06/05/2025
04/08/2025
09/10/2025
08/01/2026
10/04/2026
19/06/2026
M/s. Muthukrishnan, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. K. Prabakar, the Counsel on behalf of the Respondent filed the Counter Statement. List to 19.06.2026 for hearing on Arguments/filing of written submiss
38311 70/2021 7A EPF Appeal Bensam Hospital and Surgical Nursing Home APFC, Nagercoil 05/11/2024
11/02/2025
06/05/2025
04/08/2025
09/10/2025
08/01/2026
10/04/2026
19/06/2026
M/s. Muthukrishnan, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. K. Prabakar, the Counsel on behalf of the Respondent filed the Counter Statement. List to 19.06.2026 for hearing on Arguments/filing of written submiss
38312 70/2021 7A EPF Appeal Bensam Hospital and Surgical Nursing Home APFC, Nagercoil 05/11/2024
11/02/2025
06/05/2025
04/08/2025
09/10/2025
08/01/2026
10/04/2026
19/06/2026
M/s. Muthukrishnan, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. K. Prabakar, the Counsel on behalf of the Respondent filed the Counter Statement. List to 19.06.2026 for hearing on Arguments/filing of written submiss
38313 70/2021 7A EPF Appeal Bensam Hospital and Surgical Nursing Home APFC, Nagercoil 05/11/2024
11/02/2025
06/05/2025
04/08/2025
09/10/2025
08/01/2026
10/04/2026
19/06/2026
M/s. Muthukrishnan, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. K. Prabakar, the Counsel on behalf of the Respondent filed the Counter Statement. List to 19.06.2026 for hearing on Arguments/filing of written submiss
38314 70/2021 7A EPF Appeal Bensam Hospital and Surgical Nursing Home APFC, Nagercoil 05/11/2024
11/02/2025
06/05/2025
04/08/2025
09/10/2025
08/01/2026
10/04/2026
19/06/2026
M/s. Muthukrishnan, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. K. Prabakar, the Counsel on behalf of the Respondent filed the Counter Statement. List to 19.06.2026 for hearing on Arguments/filing of written submiss
38315 70/2021 7A EPF Appeal Bensam Hospital and Surgical Nursing Home APFC, Nagercoil 05/11/2024
11/02/2025
06/05/2025
04/08/2025
09/10/2025
08/01/2026
10/04/2026
19/06/2026
M/s. Muthukrishnan, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. K. Prabakar, the Counsel on behalf of the Respondent filed the Counter Statement. List to 19.06.2026 for hearing on Arguments/filing of written submiss
38316 70/2021 7A EPF Appeal Bensam Hospital and Surgical Nursing Home APFC, Nagercoil 05/11/2024
11/02/2025
06/05/2025
04/08/2025
09/10/2025
08/01/2026
10/04/2026
19/06/2026
M/s. Muthukrishnan, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. K. Prabakar, the Counsel on behalf of the Respondent filed the Counter Statement. List to 19.06.2026 for hearing on Arguments/filing of written submiss
38317 70/2021 7A EPF Appeal Bensam Hospital and Surgical Nursing Home APFC, Nagercoil 05/11/2024
11/02/2025
06/05/2025
04/08/2025
09/10/2025
08/01/2026
10/04/2026
19/06/2026
M/s. Muthukrishnan, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. K. Prabakar, the Counsel on behalf of the Respondent filed the Counter Statement. List to 19.06.2026 for hearing on Arguments/filing of written submiss
38318 68/2021 7B EPF Appeal The Superintend Engineer, TNEB - Salem EDC APFC, Salem 20/02/2024
26/04/2024
05/08/2024
06/11/2024
12/02/2025
07/05/2025
05/08/2025
13/08/2025
14/10/2025
(Salem Camp) Final Orders - The Appeal stands dismissed.
38319 68/2021 7B EPF Appeal The Superintend Engineer, TNEB - Salem EDC APFC, Salem 20/02/2024
26/04/2024
05/08/2024
06/11/2024
12/02/2025
07/05/2025
05/08/2025
13/08/2025
14/10/2025
(Salem Camp) Final Orders - The Appeal stands dismissed.
38320 68/2021 7B EPF Appeal The Superintend Engineer, TNEB - Salem EDC APFC, Salem 20/02/2024
26/04/2024
05/08/2024
06/11/2024
12/02/2025
07/05/2025
05/08/2025
13/08/2025
14/10/2025
(Salem Camp) Final Orders - The Appeal stands dismissed.
38321 68/2021 7B EPF Appeal The Superintend Engineer, TNEB - Salem EDC APFC, Salem 20/02/2024
26/04/2024
05/08/2024
06/11/2024
12/02/2025
07/05/2025
05/08/2025
13/08/2025
14/10/2025
(Salem Camp) Final Orders - The Appeal stands dismissed.
38322 68/2021 7B EPF Appeal The Superintend Engineer, TNEB - Salem EDC APFC, Salem 20/02/2024
26/04/2024
05/08/2024
06/11/2024
12/02/2025
07/05/2025
05/08/2025
13/08/2025
14/10/2025
(Salem Camp) Final Orders - The Appeal stands dismissed.
38323 68/2021 7B EPF Appeal The Superintend Engineer, TNEB - Salem EDC APFC, Salem 20/02/2024
26/04/2024
05/08/2024
06/11/2024
12/02/2025
07/05/2025
05/08/2025
13/08/2025
14/10/2025
(Salem Camp) Final Orders - The Appeal stands dismissed.
38324 68/2021 7B EPF Appeal The Superintend Engineer, TNEB - Salem EDC APFC, Salem 20/02/2024
26/04/2024
05/08/2024
06/11/2024
12/02/2025
07/05/2025
05/08/2025
13/08/2025
14/10/2025
(Salem Camp) Final Orders - The Appeal stands dismissed.
38325 68/2021 7B EPF Appeal The Superintend Engineer, TNEB - Salem EDC APFC, Salem 20/02/2024
26/04/2024
05/08/2024
06/11/2024
12/02/2025
07/05/2025
05/08/2025
13/08/2025
14/10/2025
(Salem Camp) Final Orders - The Appeal stands dismissed.
38326 68/2021 7B EPF Appeal The Superintend Engineer, TNEB - Salem EDC APFC, Salem 20/02/2024
26/04/2024
05/08/2024
06/11/2024
12/02/2025
07/05/2025
05/08/2025
13/08/2025
14/10/2025
(Salem Camp) Final Orders - The Appeal stands dismissed.
38327 67/2021 7A EPF Appeal Adems RPFC-II, Nagercoil 28/06/2023
27/07/2023
10/08/2023
10/08/2023
02/01/2025
19/02/2025
18/04/2025
04/06/2025
30/07/2025
Final Order - The Appeal stands dismissed for non-compliance of this Tribunal Order dated 28.04.2023.
38328 67/2021 7A EPF Appeal Adems RPFC-II, Nagercoil 28/06/2023
27/07/2023
10/08/2023
10/08/2023
02/01/2025
19/02/2025
18/04/2025
04/06/2025
30/07/2025
Final Order - The Appeal stands dismissed for non-compliance of this Tribunal Order dated 28.04.2023.
38329 67/2021 7A EPF Appeal Adems RPFC-II, Nagercoil 28/06/2023
27/07/2023
10/08/2023
10/08/2023
02/01/2025
19/02/2025
18/04/2025
04/06/2025
30/07/2025
Final Order - The Appeal stands dismissed for non-compliance of this Tribunal Order dated 28.04.2023.
38330 67/2021 7A EPF Appeal Adems RPFC-II, Nagercoil 28/06/2023
27/07/2023
10/08/2023
10/08/2023
02/01/2025
19/02/2025
18/04/2025
04/06/2025
30/07/2025
Final Order - The Appeal stands dismissed for non-compliance of this Tribunal Order dated 28.04.2023.
38331 67/2021 7A EPF Appeal Adems RPFC-II, Nagercoil 28/06/2023
27/07/2023
10/08/2023
10/08/2023
02/01/2025
19/02/2025
18/04/2025
04/06/2025
30/07/2025
Final Order - The Appeal stands dismissed for non-compliance of this Tribunal Order dated 28.04.2023.
38332 67/2021 7A EPF Appeal Adems RPFC-II, Nagercoil 28/06/2023
27/07/2023
10/08/2023
10/08/2023
02/01/2025
19/02/2025
18/04/2025
04/06/2025
30/07/2025
Final Order - The Appeal stands dismissed for non-compliance of this Tribunal Order dated 28.04.2023.
38333 67/2021 7A EPF Appeal Adems RPFC-II, Nagercoil 28/06/2023
27/07/2023
10/08/2023
10/08/2023
02/01/2025
19/02/2025
18/04/2025
04/06/2025
30/07/2025
Final Order - The Appeal stands dismissed for non-compliance of this Tribunal Order dated 28.04.2023.
38334 67/2021 7A EPF Appeal Adems RPFC-II, Nagercoil 28/06/2023
27/07/2023
10/08/2023
10/08/2023
02/01/2025
19/02/2025
18/04/2025
04/06/2025
30/07/2025
Final Order - The Appeal stands dismissed for non-compliance of this Tribunal Order dated 28.04.2023.
38335 67/2021 7A EPF Appeal Adems RPFC-II, Nagercoil 28/06/2023
27/07/2023
10/08/2023
10/08/2023
02/01/2025
19/02/2025
18/04/2025
04/06/2025
30/07/2025
Final Order - The Appeal stands dismissed for non-compliance of this Tribunal Order dated 28.04.2023.
38336 66/2021 7B EPF Appeal The Superintend Engineer, TNEB - Hydro Project APFC, Salem & another 13/06/2025
15/07/2025
13/08/2025
12/09/2025
12/12/2025
20/03/2026
05/06/2026
M/s. Aakash, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. R. Thirunavukarasu, the learned Counsel on behalf of the Respondent is present. List to 05.06.2026 for hearing on Arguments/filing of written submission.
38337 66/2021 7B EPF Appeal The Superintend Engineer, TNEB - Hydro Project APFC, Salem & another 13/06/2025
15/07/2025
13/08/2025
12/09/2025
12/12/2025
20/03/2026
05/06/2026
M/s. Aakash, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. R. Thirunavukarasu, the learned Counsel on behalf of the Respondent is present. List to 05.06.2026 for hearing on Arguments/filing of written submission.
38338 66/2021 7B EPF Appeal The Superintend Engineer, TNEB - Hydro Project APFC, Salem & another 13/06/2025
15/07/2025
13/08/2025
12/09/2025
12/12/2025
20/03/2026
05/06/2026
M/s. Aakash, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. R. Thirunavukarasu, the learned Counsel on behalf of the Respondent is present. List to 05.06.2026 for hearing on Arguments/filing of written submission.
38339 66/2021 7B EPF Appeal The Superintend Engineer, TNEB - Hydro Project APFC, Salem & another 13/06/2025
15/07/2025
13/08/2025
12/09/2025
12/12/2025
20/03/2026
05/06/2026
M/s. Aakash, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. R. Thirunavukarasu, the learned Counsel on behalf of the Respondent is present. List to 05.06.2026 for hearing on Arguments/filing of written submission.
38340 66/2021 7B EPF Appeal The Superintend Engineer, TNEB - Hydro Project APFC, Salem & another 13/06/2025
15/07/2025
13/08/2025
12/09/2025
12/12/2025
20/03/2026
05/06/2026
M/s. Aakash, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. R. Thirunavukarasu, the learned Counsel on behalf of the Respondent is present. List to 05.06.2026 for hearing on Arguments/filing of written submission.
38341 66/2021 7B EPF Appeal The Superintend Engineer, TNEB - Hydro Project APFC, Salem & another 13/06/2025
15/07/2025
13/08/2025
12/09/2025
12/12/2025
20/03/2026
05/06/2026
M/s. Aakash, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. R. Thirunavukarasu, the learned Counsel on behalf of the Respondent is present. List to 05.06.2026 for hearing on Arguments/filing of written submission.
38342 66/2021 7B EPF Appeal The Superintend Engineer, TNEB - Hydro Project APFC, Salem & another 13/06/2025
15/07/2025
13/08/2025
12/09/2025
12/12/2025
20/03/2026
05/06/2026
M/s. Aakash, the Counsel on behalf of the Appellant prays time for Arguments. Time granted. M/s. R. Thirunavukarasu, the learned Counsel on behalf of the Respondent is present. List to 05.06.2026 for hearing on Arguments/filing of written submission.
38343 65/2021 14B EPF Appeal Bannari Amman Spinning Mills Ltd. RPFC-I, Madurai 24/03/2025
23/06/2025
14/08/2025
29/10/2025
02/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act.
38344 65/2021 14B EPF Appeal Bannari Amman Spinning Mills Ltd. RPFC-I, Madurai 24/03/2025
23/06/2025
14/08/2025
29/10/2025
02/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act.
38345 65/2021 14B EPF Appeal Bannari Amman Spinning Mills Ltd. RPFC-I, Madurai 24/03/2025
23/06/2025
14/08/2025
29/10/2025
02/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act.
38346 65/2021 14B EPF Appeal Bannari Amman Spinning Mills Ltd. RPFC-I, Madurai 24/03/2025
23/06/2025
14/08/2025
29/10/2025
02/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act.
38347 65/2021 14B EPF Appeal Bannari Amman Spinning Mills Ltd. RPFC-I, Madurai 24/03/2025
23/06/2025
14/08/2025
29/10/2025
02/02/2026
(Special Campaign) Final Order - The Appeal is partly allowed. 30% of the assessed amount is waived off. The Respondent is directed to recover only 70% of the assessed amount of damages u/s. 14B of the Act.
38348 69/2021 14B EPF Appeal NN 630 Kombukkaranendal Primary Agricultural Co-operative Bank APFC, Madurai 21/06/2024
07/10/2024
06/01/2025
07/04/2025
07/07/2025
02/09/2025
27/11/2025
27/02/2026
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 09.09.2020 Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law
38349 69/2021 14B EPF Appeal NN 630 Kombukkaranendal Primary Agricultural Co-operative Bank APFC, Madurai 21/06/2024
07/10/2024
06/01/2025
07/04/2025
07/07/2025
02/09/2025
27/11/2025
27/02/2026
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 09.09.2020 Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law
38350 69/2021 14B EPF Appeal NN 630 Kombukkaranendal Primary Agricultural Co-operative Bank APFC, Madurai 21/06/2024
07/10/2024
06/01/2025
07/04/2025
07/07/2025
02/09/2025
27/11/2025
27/02/2026
(Special Campaign) Final Order - Waived 35% of assessed amount passed by Respondent order dtd 09.09.2020 Respondent will recover remaining 65% of assessed amount from Appellant in accordance with law