5951 | 131/2024 | 14B | EPF Appeal | The Murphy Products | APFC, Madurai |
30/08/2024 28/10/2024 28/11/2024 30/12/2024 30/01/2025 06/03/2025 08/04/2025 08/05/2025 |
Delay condoned. Appeal is admitted. Stayed till the next date of listing, provided appellant deposits Rs.20,000/- within 8 weeks from receipt of certified copy of this order. For compliance/counter. | ||
5952 | 132/2024 | 14B | EPF Appeal | The Murphy Products Tailoring | APFC, Madurai |
29/11/2024 01/01/2025 03/02/2025 03/03/2025 03/04/2025 05/05/2025 |
Delay condoned. Appeal is admitted. Stayed till the next date of listing, provided appellant deposits Rs.20,000/- within 8 weeks from receipt of certified copy of this order. For compliance/counter. | ||
5953 | 132/2024 | 14B | EPF Appeal | The Murphy Products Tailoring | APFC, Madurai |
29/11/2024 01/01/2025 03/02/2025 03/03/2025 03/04/2025 05/05/2025 |
Delay condoned. Appeal is admitted. Stayed till the next date of listing, provided appellant deposits Rs.20,000/- within 8 weeks from receipt of certified copy of this order. For compliance/counter. | ||
5954 | 132/2024 | 14B | EPF Appeal | The Murphy Products Tailoring | APFC, Madurai |
29/11/2024 01/01/2025 03/02/2025 03/03/2025 03/04/2025 05/05/2025 |
Delay condoned. Appeal is admitted. Stayed till the next date of listing, provided appellant deposits Rs.20,000/- within 8 weeks from receipt of certified copy of this order. For compliance/counter. | ||
5955 | 132/2024 | 14B | EPF Appeal | The Murphy Products Tailoring | APFC, Madurai |
29/11/2024 01/01/2025 03/02/2025 03/03/2025 03/04/2025 05/05/2025 |
Delay condoned. Appeal is admitted. Stayed till the next date of listing, provided appellant deposits Rs.20,000/- within 8 weeks from receipt of certified copy of this order. For compliance/counter. | ||
5956 | 132/2024 | 14B | EPF Appeal | The Murphy Products Tailoring | APFC, Madurai |
29/11/2024 01/01/2025 03/02/2025 03/03/2025 03/04/2025 05/05/2025 |
Delay condoned. Appeal is admitted. Stayed till the next date of listing, provided appellant deposits Rs.20,000/- within 8 weeks from receipt of certified copy of this order. For compliance/counter. | ||
5957 | 132/2024 | 14B | EPF Appeal | The Murphy Products Tailoring | APFC, Madurai |
29/11/2024 01/01/2025 03/02/2025 03/03/2025 03/04/2025 05/05/2025 |
Delay condoned. Appeal is admitted. Stayed till the next date of listing, provided appellant deposits Rs.20,000/- within 8 weeks from receipt of certified copy of this order. For compliance/counter. | ||
5958 | Ref 51/2024 | ID Act 1947 Reference Case | ID | Sri Shekar Hansda, S/O late Santilal Manjhi, through, The Secretary, Bihar Colliery Kamgar Union, Jharnapara, Hirapur, Dist: Dhanbad - 826001 | The General manager, Lodna Area of M/s BCCL, PO. Lodna, Dist - Dhanbad- 828115 828131 | 26/06/2025 | W/s by the Management | ||
5959 | LC-01/2024 | I. D. Case u/s 33C(2) | ID | Uttarbanga Kshetriya Gramin Bank Khudra Sanchay Collectors' Association | Uttarbanga Kshetriya Gramin Bank | 07/04/2025 | For submission of final report by appointed commissioner. | ||
5960 | CGIT Ahmedabad Cause list dated 13.08.2024 | CGIT Ahmedabad Cause list dated 13.08.2024 | EPF Appeal, ID | CGIT Ahmedabad Cause list dated 13.08.2024 | Download | ||||
5961 | CGIT Ahmedabad Cause list dated 12.08.2024 | CGIT Ahmedabad Cause list dated 12.08.2024 | EPF Appeal, ID | CGIT Ahmedabad Cause list dated 12.08.2024 | Download | ||||
5962 | Cause List CGIT-I Delhi on 14.08.2024 ID matters before the Justice Vikas Kunvar Srivastava, (Retd.), Presiding Officer, Room 207 | ID | 14/08/2024 | Download | |||||
5963 | Cause List CGIT 2 Delhi-EPF Matters, dated-14.08.2024 before Ld. Presiding Officer timing 02:00P.M | EPF Appeal | 14/08/2024 | Download | |||||
5964 | Cause List CGIT-I Delhi on 14.08.2024 EPF matters before the Justice Vikas Kunvar Srivastava, (Retd.), Presiding Officer, CGIT-I Room 207 timing 11:00A.M. | EPF Appeal | 14/08/2024 | Download | |||||
5965 | CGIT Ahmedabad Cause list dated 09.08.2024 | CGIT Ahmedabad Cause list dated 09.08.2024 | EPF Appeal, ID | CGIT Ahmedabad Cause list dated 09.08.2024 | Download | ||||
5966 | CGIT Ahmedabad Cause list dated 08.08.2024 | CGIT Ahmedabad Cause list dated 08.08.2024 | EPF Appeal, ID | CGIT Ahmedabad Cause list dated 08.08.2024 | Download | ||||
5967 | CGIT Ahmedabad Cause list dated 07.08.2024 | CGIT Ahmedabad Cause list dated 07.08.2024 | EPF Appeal, ID | CGIT Ahmedabad Cause list dated 07.08.2024 | Download | ||||
5968 | Cause List CGIT 02 Delhi-ID Matters, dated-14.08.2024 Before P.O. Hearing Time 11:00 A.M. Onward | ID | 14/08/2024 | Download | |||||
5969 | CGIT Ahmedabad Cause list dated 06.08.2024 | CGIT Ahmedabad Cause list dated 06.08.2024 | EPF Appeal, ID | CGIT Ahmedabad Cause list dated 06.08.2024 | Download | ||||
5970 | CGIT Ahmedabad Cause list dated 05.08.2024 | CGIT Ahmedabad Cause list dated 05.08.2024 | EPF Appeal, ID | CGIT Ahmedabad Cause list dated 05.08.2024 | Download | ||||
5971 | CGIT Ahmedabad Cause list dated 02.08.2024 | CGIT Ahmedabad Cause list dated 02.08.2024 | EPF Appeal, ID | CGIT Ahmedabad Cause list dated 02.08.2024 | Download | ||||
5972 | I.D MISC. CASE NO. 03/2015 | UNDER SECTION 33-C (2) OF THE I.D ACT. | ID | SHRI RAMA CHANDRA NAYAK AND 7 OTHERS. | CHIEF ENGINEER, CENTRAL PUBLIC WORKS DEPARTMENT AND OTHERS. |
02/09/2024 07/10/2024 18/11/2024 21/01/2025 26/02/2025 01/04/2025 06/05/2025 |
FOR ARGUMENT | ||
5973 | I.D MISC. CASE NO. 03/2015 | UNDER SECTION 33-C (2) OF THE I.D ACT. | ID | SHRI RAMA CHANDRA NAYAK AND 7 OTHERS. | CHIEF ENGINEER, CENTRAL PUBLIC WORKS DEPARTMENT AND OTHERS. |
02/09/2024 07/10/2024 18/11/2024 21/01/2025 26/02/2025 01/04/2025 06/05/2025 |
FOR ARGUMENT | ||
5974 | I.D MISC. CASE NO. 03/2015 | UNDER SECTION 33-C (2) OF THE I.D ACT. | ID | SHRI RAMA CHANDRA NAYAK AND 7 OTHERS. | CHIEF ENGINEER, CENTRAL PUBLIC WORKS DEPARTMENT AND OTHERS. |
02/09/2024 07/10/2024 18/11/2024 21/01/2025 26/02/2025 01/04/2025 06/05/2025 |
FOR ARGUMENT | ||
5975 | I.D MISC. CASE NO. 03/2015 | UNDER SECTION 33-C (2) OF THE I.D ACT. | ID | SHRI RAMA CHANDRA NAYAK AND 7 OTHERS. | CHIEF ENGINEER, CENTRAL PUBLIC WORKS DEPARTMENT AND OTHERS. |
02/09/2024 07/10/2024 18/11/2024 21/01/2025 26/02/2025 01/04/2025 06/05/2025 |
FOR ARGUMENT | ||
5976 | I.D MISC. CASE NO. 03/2015 | UNDER SECTION 33-C (2) OF THE I.D ACT. | ID | SHRI RAMA CHANDRA NAYAK AND 7 OTHERS. | CHIEF ENGINEER, CENTRAL PUBLIC WORKS DEPARTMENT AND OTHERS. |
02/09/2024 07/10/2024 18/11/2024 21/01/2025 26/02/2025 01/04/2025 06/05/2025 |
FOR ARGUMENT | ||
5977 | I.D MISC. CASE NO. 03/2015 | UNDER SECTION 33-C (2) OF THE I.D ACT. | ID | SHRI RAMA CHANDRA NAYAK AND 7 OTHERS. | CHIEF ENGINEER, CENTRAL PUBLIC WORKS DEPARTMENT AND OTHERS. |
02/09/2024 07/10/2024 18/11/2024 21/01/2025 26/02/2025 01/04/2025 06/05/2025 |
FOR ARGUMENT | ||
5978 | I.D MISC. CASE NO. 03/2015 | UNDER SECTION 33-C (2) OF THE I.D ACT. | ID | SHRI RAMA CHANDRA NAYAK AND 7 OTHERS. | CHIEF ENGINEER, CENTRAL PUBLIC WORKS DEPARTMENT AND OTHERS. |
02/09/2024 07/10/2024 18/11/2024 21/01/2025 26/02/2025 01/04/2025 06/05/2025 |
FOR ARGUMENT | ||
5979 | I.D CASE NO. 64/2023 | UNDER SECTION 10 OF THE I.D ACT. | ID | THE GENERAL SECRETARY, PARADIP INDUSTRIAL WORKERS UNION, JAGATSINGPUR. | 1. M/s LIBERTY HIGH RISE PVT. LTD., JAGATSINGHPUR. 2. THE CHAIRMAN, PARADIP PORT AUTHORITY, JAGATSINGPUR. |
23/10/2024 17/12/2024 04/03/2025 14/05/2025 |
FOR MISCELLANEOUS PURPOSE | ||
5980 | I.D CASE NO. 64/2023 | UNDER SECTION 10 OF THE I.D ACT. | ID | THE GENERAL SECRETARY, PARADIP INDUSTRIAL WORKERS UNION, JAGATSINGPUR. | 1. M/s LIBERTY HIGH RISE PVT. LTD., JAGATSINGHPUR. 2. THE CHAIRMAN, PARADIP PORT AUTHORITY, JAGATSINGPUR. |
23/10/2024 17/12/2024 04/03/2025 14/05/2025 |
FOR MISCELLANEOUS PURPOSE | ||
5981 | I.D CASE NO. 64/2023 | UNDER SECTION 10 OF THE I.D ACT. | ID | THE GENERAL SECRETARY, PARADIP INDUSTRIAL WORKERS UNION, JAGATSINGPUR. | 1. M/s LIBERTY HIGH RISE PVT. LTD., JAGATSINGHPUR. 2. THE CHAIRMAN, PARADIP PORT AUTHORITY, JAGATSINGPUR. |
23/10/2024 17/12/2024 04/03/2025 14/05/2025 |
FOR MISCELLANEOUS PURPOSE | ||
5982 | I.D CASE NO. 64/2023 | UNDER SECTION 10 OF THE I.D ACT. | ID | THE GENERAL SECRETARY, PARADIP INDUSTRIAL WORKERS UNION, JAGATSINGPUR. | 1. M/s LIBERTY HIGH RISE PVT. LTD., JAGATSINGHPUR. 2. THE CHAIRMAN, PARADIP PORT AUTHORITY, JAGATSINGPUR. |
23/10/2024 17/12/2024 04/03/2025 14/05/2025 |
FOR MISCELLANEOUS PURPOSE | ||
5983 | I.D CASE NO. 58/2023 | UNDER SECTION 10 OF THE I.T ACT. | ID | KEONJHAR MINING WORKERS UNION, KEONJHAR. | 1. THE ORISSA MINERAL DEVELOPMENT CO. LTD., BBSR. 2. THE BUSINESS HEAD, M/s ORISSA MINERAL DEVELOPMENT CO. LTD., BARBIL. |
23/10/2024 03/12/2024 06/01/2025 10/03/2025 14/05/2025 |
FOR MISCELLANEOUS PURPOSE | ||
5984 | I.D CASE NO. 58/2023 | UNDER SECTION 10 OF THE I.T ACT. | ID | KEONJHAR MINING WORKERS UNION, KEONJHAR. | 1. THE ORISSA MINERAL DEVELOPMENT CO. LTD., BBSR. 2. THE BUSINESS HEAD, M/s ORISSA MINERAL DEVELOPMENT CO. LTD., BARBIL. |
23/10/2024 03/12/2024 06/01/2025 10/03/2025 14/05/2025 |
FOR MISCELLANEOUS PURPOSE | ||
5985 | I.D CASE NO. 58/2023 | UNDER SECTION 10 OF THE I.T ACT. | ID | KEONJHAR MINING WORKERS UNION, KEONJHAR. | 1. THE ORISSA MINERAL DEVELOPMENT CO. LTD., BBSR. 2. THE BUSINESS HEAD, M/s ORISSA MINERAL DEVELOPMENT CO. LTD., BARBIL. |
23/10/2024 03/12/2024 06/01/2025 10/03/2025 14/05/2025 |
FOR MISCELLANEOUS PURPOSE | ||
5986 | I.D CASE NO. 58/2023 | UNDER SECTION 10 OF THE I.T ACT. | ID | KEONJHAR MINING WORKERS UNION, KEONJHAR. | 1. THE ORISSA MINERAL DEVELOPMENT CO. LTD., BBSR. 2. THE BUSINESS HEAD, M/s ORISSA MINERAL DEVELOPMENT CO. LTD., BARBIL. |
23/10/2024 03/12/2024 06/01/2025 10/03/2025 14/05/2025 |
FOR MISCELLANEOUS PURPOSE | ||
5987 | I.D CASE NO. 58/2023 | UNDER SECTION 10 OF THE I.T ACT. | ID | KEONJHAR MINING WORKERS UNION, KEONJHAR. | 1. THE ORISSA MINERAL DEVELOPMENT CO. LTD., BBSR. 2. THE BUSINESS HEAD, M/s ORISSA MINERAL DEVELOPMENT CO. LTD., BARBIL. |
23/10/2024 03/12/2024 06/01/2025 10/03/2025 14/05/2025 |
FOR MISCELLANEOUS PURPOSE | ||
5988 | 48/2024 | 7A | EPF Appeal | Grace International | RPFC-II, Tirupur & 2 others |
27/08/2024 11/11/2024 11/12/2024 13/01/2025 17/02/2025 17/03/2025 17/04/2025 19/05/2025 |
Delay Condoned. Appeal is admitted. Stayed if appellant deposits Rs.20 Lakhs within a period of 8 weeks from the date of receipt of the copy of the order before the Respondent, failing which appellant is not entitled for interim relief granted today. | ||
5989 | 48/2024 | 7A | EPF Appeal | Grace International | RPFC-II, Tirupur & 2 others |
27/08/2024 11/11/2024 11/12/2024 13/01/2025 17/02/2025 17/03/2025 17/04/2025 19/05/2025 |
Delay Condoned. Appeal is admitted. Stayed if appellant deposits Rs.20 Lakhs within a period of 8 weeks from the date of receipt of the copy of the order before the Respondent, failing which appellant is not entitled for interim relief granted today. | ||
5990 | 48/2024 | 7A | EPF Appeal | Grace International | RPFC-II, Tirupur & 2 others |
27/08/2024 11/11/2024 11/12/2024 13/01/2025 17/02/2025 17/03/2025 17/04/2025 19/05/2025 |
Delay Condoned. Appeal is admitted. Stayed if appellant deposits Rs.20 Lakhs within a period of 8 weeks from the date of receipt of the copy of the order before the Respondent, failing which appellant is not entitled for interim relief granted today. | ||
5991 | 48/2024 | 7A | EPF Appeal | Grace International | RPFC-II, Tirupur & 2 others |
27/08/2024 11/11/2024 11/12/2024 13/01/2025 17/02/2025 17/03/2025 17/04/2025 19/05/2025 |
Delay Condoned. Appeal is admitted. Stayed if appellant deposits Rs.20 Lakhs within a period of 8 weeks from the date of receipt of the copy of the order before the Respondent, failing which appellant is not entitled for interim relief granted today. | ||
5992 | 48/2024 | 7A | EPF Appeal | Grace International | RPFC-II, Tirupur & 2 others |
27/08/2024 11/11/2024 11/12/2024 13/01/2025 17/02/2025 17/03/2025 17/04/2025 19/05/2025 |
Delay Condoned. Appeal is admitted. Stayed if appellant deposits Rs.20 Lakhs within a period of 8 weeks from the date of receipt of the copy of the order before the Respondent, failing which appellant is not entitled for interim relief granted today. | ||
5993 | 48/2024 | 7A | EPF Appeal | Grace International | RPFC-II, Tirupur & 2 others |
27/08/2024 11/11/2024 11/12/2024 13/01/2025 17/02/2025 17/03/2025 17/04/2025 19/05/2025 |
Delay Condoned. Appeal is admitted. Stayed if appellant deposits Rs.20 Lakhs within a period of 8 weeks from the date of receipt of the copy of the order before the Respondent, failing which appellant is not entitled for interim relief granted today. | ||
5994 | 48/2024 | 7A | EPF Appeal | Grace International | RPFC-II, Tirupur & 2 others |
27/08/2024 11/11/2024 11/12/2024 13/01/2025 17/02/2025 17/03/2025 17/04/2025 19/05/2025 |
Delay Condoned. Appeal is admitted. Stayed if appellant deposits Rs.20 Lakhs within a period of 8 weeks from the date of receipt of the copy of the order before the Respondent, failing which appellant is not entitled for interim relief granted today. | ||
5995 | 48/2024 | 7A | EPF Appeal | Grace International | RPFC-II, Tirupur & 2 others |
27/08/2024 11/11/2024 11/12/2024 13/01/2025 17/02/2025 17/03/2025 17/04/2025 19/05/2025 |
Delay Condoned. Appeal is admitted. Stayed if appellant deposits Rs.20 Lakhs within a period of 8 weeks from the date of receipt of the copy of the order before the Respondent, failing which appellant is not entitled for interim relief granted today. | ||
5996 | I.D CASE NO. 59/2023 | UNDER SECTION 10 OF THE I.T ACT. | ID | THE GENERAL SECRETARY, KEONJHAR MINING WORKERS UNION, KEONJHAR. | M/s ORISSA MINERALS DEVELOPMENT CO LTD., BBSR. |
23/10/2024 03/12/2024 06/01/2025 10/03/2025 14/05/2025 |
FOR MISCELLANEOUS PURPOSE | ||
5997 | I.D CASE NO. 59/2023 | UNDER SECTION 10 OF THE I.T ACT. | ID | THE GENERAL SECRETARY, KEONJHAR MINING WORKERS UNION, KEONJHAR. | M/s ORISSA MINERALS DEVELOPMENT CO LTD., BBSR. |
23/10/2024 03/12/2024 06/01/2025 10/03/2025 14/05/2025 |
FOR MISCELLANEOUS PURPOSE | ||
5998 | I.D CASE NO. 59/2023 | UNDER SECTION 10 OF THE I.T ACT. | ID | THE GENERAL SECRETARY, KEONJHAR MINING WORKERS UNION, KEONJHAR. | M/s ORISSA MINERALS DEVELOPMENT CO LTD., BBSR. |
23/10/2024 03/12/2024 06/01/2025 10/03/2025 14/05/2025 |
FOR MISCELLANEOUS PURPOSE | ||
5999 | I.D CASE NO. 59/2023 | UNDER SECTION 10 OF THE I.T ACT. | ID | THE GENERAL SECRETARY, KEONJHAR MINING WORKERS UNION, KEONJHAR. | M/s ORISSA MINERALS DEVELOPMENT CO LTD., BBSR. |
23/10/2024 03/12/2024 06/01/2025 10/03/2025 14/05/2025 |
FOR MISCELLANEOUS PURPOSE | ||
6000 | I.D CASE NO. 59/2023 | UNDER SECTION 10 OF THE I.T ACT. | ID | THE GENERAL SECRETARY, KEONJHAR MINING WORKERS UNION, KEONJHAR. | M/s ORISSA MINERALS DEVELOPMENT CO LTD., BBSR. |
23/10/2024 03/12/2024 06/01/2025 10/03/2025 14/05/2025 |